Timber Sales, Stewardship Contracts and Bough Sales

 

Fiscal Year 2016 Advertisements

Links to documents will remain online for 6 months past bid dates.

 

SLOW DxP TIMBER SALE ADVERTISEMENT

Bids were due by 10:00 a.m., August 2, 2016, for the Slow DxP Timber Sale.

One bid was received: Apparent high bidder is Dodge Logging, Inc., with a bid of $0.21 per TON.

SLOW DxP ADVERTISEMENT DOCUMENTS
Prospectus
Bid Form
Sale Area Map Intended print size is 17"x11"
Contract
Contract Attachments Includes Specified Road Reconstructiona and Temporary Bridge Specifications
Appraisal
Bid Envelope Example

Google Earth 
SlowDxP_Subdivisions.kmz
Requires Google Earth (free download) to view.

..................................................................................................................

LAKE TIMBER SALE ADVERTISEMENT

Bids were due by 10:00 a.m., March 30, 2016, for the Lake Timber Sale.

We received two bids:
High bidder is High Cascade, Inc. with a weighted average bid of
$73.13 per CCF.

Second high bidder is Interfor U.S., Inc. with a weighted average bid of
$54.07 per CCF.

LAKE TIMBER SALE DOCUMENTS

Prospectus
Bid Form with AD-3030-FS Form
Sale Area Map (print size 11x17 check box to FIT map)
Contract
Contract Attachments Includes Specified Road Reconstruction
Sale Area Map Supplement
Appraisal   
Logging Systems and Temporary Road Map  
Bid Envelope Example include information as shown in the example on your bid envelope

Google Earth  
Payment Units .kmz
Requires Google Earth (free download) to view.

..................................................................................................................................

HIGHWAY 224 HAZARD TREE DECK

Bids were due by 10:00 a.m., January 21, 2016, for the Highway 224 Hazard Tree Deck.

One bid was received:
Apparent high bidder is O’Malley Brothers Corp. with a bid of $46.51 per CCF. 

..................................................................................................................................

SIX MONTH ADVERTISEMENT FY16

PERIOD:
APRIL1, 2016 - SEPTEMBER 30, 2016

OCTOBER 1, 2015 - MARCH 31, 2016

 


Fiscal Year 2015 Advertisements

BASALT SBA ADVERTISEMENT

Bids were due by 10:00 a.m., September 30, 2015, for the Basalt SBA Timber Sale.

We received one bid:
Apparent high bidder is High Cascade, Inc. with a weighted average bid of $56.60
per CCF.

..................................................................................................................
ASHES-CALDERA STEWARDSHIP ADVERTISEMENT

Technical Proposals were due September 11, 2015 at 10:00 AM for the
Ashes-Caldera Stewardship Contract.

There were five offers submitted for the Ashes-Caldera Stewardship Contract.
Interfor U. S., Inc. has been determined to be the Best Value Bidder.
The value of Included Timber: $1,240,510.71. The value of the five
mandatory stewardship projects: $181,550.00.

..................................................................................................................
4210 BOUGH SALE

Sealed bids were opened at 10:30 A.M. on September 3, 2015 at the Mt.
Hood Forest Headquarters office in Sandy Oregon.  The Dinger Creek Bough
sale has been awarded to Granstrom Evergreens who was the high bidder at
$100.00/Ton for the sale. 

..................................................................................................................
DINGER CREEK BOUGH SALE

Sealed bids were opened at 10:00 A.M. on September 3, 2015 at the Mt.
Hood Forest Headquarters office in Sandy Oregon.  The Dinger Creek Bough
sale has been awarded to Granstrom Evergreens who was the high bidder at
$152.00/Ton for the sale.

..................................................................................................................
SHELL THIN TIMBER SALE ADVERTISEMENT

Bids were due by 10:00 a.m., June 15, 2015, for the Shell Thin Timber Sale.

We received three bids:
Apparent high bidder is Interfor U.S., Inc. with a weighted average bid of $72.14
per CCF.

Second high bidder is High Cascade, Inc. with a weighted average
bid of $70.76 per CCF.

Third high bidder is Rick McKay Corp. with a weighted average bid of
$53.55 per CCF.

................................................................................................................
MAG STEWARDSHIP ADVERTISEMENT

Technical Proposals were due March 17, 2015 at 10:00 AM for the
Mag Stewardship Contract.

There were two offers submitted for the Mag Stewardship Contract.
High Cascade, Inc. has been determined to be the Best Value Bidder.
The value of Included Timber: $634,115.15. The value of the four
mandatory stewardship projects: $149,925.00.

..................................................................................................................
DOZER DECK REOFFER

Bids were due by 10:00 a.m., March 11, 2015, for the Dozer Deck Reoffer
Timber Sale.

We received three bids:
High bidder is O’Malley Brothers Corp. with a weighted average bid of $70.00
per CCF.

Second high bidder is Mark Evens Construction, Inc. with a weighted average
bid of $56.25 per CCF.

Third high bidder is Dean Innovations, Inc. with a weighted average bid of
$56.10 per CCF.

..................................................................................................................
36 PIT FIREWOOD SALE

Bids were due by 10:00 a.m., February 11, 2015, for the 36 Pit Firewood
Sale.

We received two bids:
High bidder is Western Wood Warehouse, Inc. with a weighted average bid of
$11.00 per cord.

Second high bidder is O’Malley Brothers, Inc. with a weighted average bid of
$11.00 per cord.

The tie bid was broken by cutting a standard deck of cards with the high card
winning the bid.

..................................................................................................................

DOZER DECK

Bids were due by 10:00 AM on 01/22/2015 for the Dozer Deck. 
No bids were received.

If you wish further information on this sale, the prospectus and bid form,
please call Erin at (503) 630-8791 or write call the Clackamas River Ranger District,
595 NW Industrial Way, Estacada Oregon.

.................................................................................................................

SIX MONTH ADVERTISEMENT FY15

PERIOD:

April 2015 - September 2015
OCTOBER 2014 - APRIL 2015


2014

TUBA THIN REOFFER TIMBER SALE ADVERTISEMENT

Bids were due by 10:00 a.m., September 18, 2014, for the Tuba Thin
Reoffer Timber Sale.
We received one bid:
High bidder is Interfor U. S., Inc., for $79,133.00 with a weighted
average bid of $8.30 per CCF.

..................................................................................................................

MULE THIN SBA TIMBER SALE ADVERTISEMENT

Bids were due by 11:00 a.m., September 18, 2014, for the Mule Thin
SBA Timber Sale.
We received one bid:
Apparent high bidder is High Cascade, Inc., for $28,651.55 with a
weighted average bid of $3.30 per CCF.

.................................................................................................................

LOKAI STEWARDSHIP CONTRACT ADVERTISEMENT  

Technical Proposals were due September 9, 2014 at 10:00 AM for the
Lokai Stewardship Contract.

There were two offers submitted for the Lokai Stewardship Contract.
High Cascade, Inc. has been determined to be the Best Value Bidder.
The value of Included Timber: $570,506.86. The value of the four
mandatory stewardship projects: $221,490.00.

..................................................................................................................

LOWE CREEK BOUGH SALE RE-ADVERTISEMENT

Bids were due by 10:00 AM on September 10th, 2014 for the Lowe Creek
Bough Sale Re-advertisement.  No bids were received.

..................................................................................................................

LAST CREEK BOUGH SALE RE-ADVERTISEMENT

Bids were due by 10:30 AM on September 10th, 2014 for the Last Creek
Bough Sale Re-advertisement.  No bids were received.

..................................................................................................................

BULL-BRONCO STEWARDSHIP CONTRACT
ADVERTISEMENT  

Technical Proposals were due August 12, 2014 at 10:00 AM for the
Bull-Bronco Stewardship Contract. 

There was one offer submitted for the Bull-Bronco Contract. High
Cascade, Inc. has been determined to be the Best Value Bidder. The
value of Included Timber: $319,373.64. The value of the three mandatory
stewardship projects: $63,425.00.

..................................................................................................................

Last Creek Bough Sale

Bids were due by 10:30 AM on July 29, 2014 for the Last Creek Bough Sale. 
No bids were received.

..................................................................................................................

Lowe Creek Bough Sale

Bids were due by 10:00 AM on July 29, 2014 for the Lowe Creek Bough Sale.  
No bids were received.

..................................................................................................................

TUBA THIN TIMBER SALE ADVERTISEMENT

Bids were due by 10:00 AM on May 27, 2014 for the Tuba Thin Timber Sale.
No bids were recieved.

..................................................................................................................

SAX THIN STEWARDSHIP CONTRACT  

There were two offers submitted for the Sax Thin Stewardship Contract.

High Cascade, Inc. has been determined to be the Best Value Bidder.

The value of Included Timber: $204,451.20.

The value of the four mandatory Stewardship Projects: $95,264.00.


2013

Drum Stewardship Contact

There was one offer submitted for the Drum Stewardship Contract.

Interfor U.S., Inc. has been determined to be the Best Value Bidder.

The value of Included Timber: $317,817.92.

The value of the four mandatory Stewardship Projects: $164,525.00.

.................................................................................................................

Bass Thin Stewardship Contract

There was one offer submitted for the Bass Thin Stewardship Contract.

Interfor U.S., Inc. has been determined to be the Best Value Bidder.

The value of Included Timber: $194,769.36.

The value of the four mandatory Stewardship Projects: $72,425.00

.................................................................................................................

Voodoo Stewardship Contract Re-advertisement

September 19, 2013

There were four offers submitted for the Voodoo Stewardship Contract.

High Cascade, Inc. has been determined to be the Best Value Bidder.

The value of Included Timber: $860,215.40

The value of the two mandatory Stewardship Projects: $91,785.00

.................................................................................................................

Black Wolf Bough Sale

Bids were due by 10:30 AM on August 20, 2013 for the Black

Wolf Bough Sale.   Two bids were received. 

High bidder was MPC Landscape Maintenance, Inc. for

$12,594.89 with a weighted average bid of $229.00/TON.

Second high bidder was Granstrom Evergreens LLC for

$12,155.66 with a weighted average bid of $221.01/TON.

.................................................................................................................

String Creek Bough Sale

Bids were due by 10:00 AM on August 20, 2013 for the String

Creek Bough Sale.   No bids were received.

.................................................................................................................

Fern Stewardship Contract

June 27, 2013

There were (3) offers submitted for the Fern Stewardship Contract.

 High Cascade, Inc. has been determined to be the Best Value Bidder.

The value of Included Timber: $371,990.43

The value of the (2) mandatory stewardship projects: $125,250.00

The value of the (1) optional stewardship project: $78,960.00 

.................................................................................................................

Mint Stewardship Integrated Resource Contract Re-advertisement

May 14, 2013

There were (4) offers submitted for the Mint Stewardship Contract. 

High Cascade, Inc. has been determined to be the Best Value Bidder.

The value of Included Timber: $884,073.27

The value of the (3) mandatory stewardship projects: $221,150.00

 


2012

Raft Timber Sale

 Bids were due by 09:00 a.m., September 10, 2012, for the Raft Timber Sale.
We received (2) bids:
High bidder was High Cascade, Inc., for $507,393.43 with a weighted average

bid of $32.22/ccf.
Second high bidder was Dodge Logging, Inc. for $325,448.23 with a weighted

average bid of $21.81/ccf. 
 

.................................................................................................................

Pie Thin Stewardship Contract

August 30, 2012
There were (2) offers submitted for the Pie Thin Stewardship Contract.

Quicksilver Contracting Co. has been determined to be the Best Value Bidder.
The value of Included Timber: $118,251.00
Value of the (1) mandatory project: $54,486.00
The value of the (3) optional projects: $6,025.00

.................................................................................................................

Draw Creek Bough Sale

August 23, 2012
There were (2) bids submitted for the Draw Creek Bough Sale.

MPC Landscape Maintenance is the high bidder.
The weighted average bid is $421.00/TON. 

.................................................................................................................

Jelly Thin Stewardship Integrated Resource Timber Contract

August 22, 2012
There were (2) offers submitted for the Jelly Thin Stewardship Contract.

Dodge Logging, Inc. has been determined to be the Best Value Bidder.
The value of Included Timber: $107,496.96
Value of the (1) mandatory project: $56,498.75
The value of the (3) optional projects: $6,125.00

.................................................................................................................

Crane Timber Sale

Crane Timber Sale—this sale previously has received no bids. A bidder has

come forward to buy the sale at the previously advertised rate, $18.42 minimum

acceptable weighted average rate.

The apparent high bidder is Quicksilver Contracting, Inc.

.................................................................................................................

Star Salvage Timber Sale

Bids were due by 10:00 a.m., June 12, 2012 for the Star Salvage sale.
There were 3 bidders.
High bidder was WYEast Forestry Management, LLC for $997.36.
The weighted average price bid was $35 per ccf.
Second high bidder was Dodge Logging, Inc. for $617.68.
The weighted average price bid was $22.06 per ccf.
Third high bidder was KIS Consulting for $448.28.
The weighted average price bid was $16.01

.................................................................................................................

Jam Thin Integrated Resource Timber Contract

April 11, 2012
There were (4) offers submitted for the Jam Thin Stewardship Contract.

Dodge Logging, Inc. has been determined to be the Best Value Bidder.
The value of Included Timber: $200,049.40.
Value of the (1) mandatory project: $39,558.75.
The value of the combined mandatory project and (3) optional projects

is $45,638.75.