Applications for Permit to Drill (APD's) in the Sespe Oil Field

Carbon California is requesting to drill 8 oil and gas wells at 4 existing well pads, installation of 7,960 feet of new pipeline, a 400 barrel emergency tank, a transfer pump, three pressure vessels, and 2 master headers in the Sespe Oil Field.

Location Summary

The 4-proposed pads to be drilled are about 5 miles north of Fillmore in the Sespe oil field. All located in Sec.29, T.5N, R.19W, SBBM.

District: Ojai Ranger District

Project Milestones

MilestoneDate
Scoping Start05/08/2014
Comment Period11/15/2021
Objection Period Start08/2021 (Estimated)
Decision10/2021 (Estimated)
Implementation12/2021 (Estimated)

Project Documents

Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.

If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.

Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public