The Mt. Hatten Project
Mt Hatten Project is a radio repeater installation project, the system operates in the VHF band, power output is rated at 8 watts and is supplied by two solar panels and storage batteries. Ground disturbance will be the placement of 4 concrete pads.
Location Summary
6th Principal Meridian, Colorado T.12S., R.92W., sec 4 NW1/4NW1/4 Chalk Mountain Quad, Grand Mesa National Forest
District: Grand Valley Ranger District
Project Milestones
Milestone | Date |
---|---|
Scoping Start | 06/15/2020 |
Comment Period | N/A |
Objection Period Start | N/A |
Decision | 10/2021 (Estimated) |
Implementation | 10/2021 (Estimated) |
Project Documents
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public