NORA 69 KV Line Upgrade and Permit Renewal
The proposed action is to increase the right-of-way to 50 feet from the centerline of the existing utility infrastructure and allow for the replacement of approximately 10.5 miles of 69 kilovolt (kV).
Location Summary
The project would occur on the Canjilon Ranger District within the current existing right-of-way, which parallels U.S. Highway 84 from Cebolla to Ghost Ranch.
District: Canjilon Ranger District
Project Milestones
Milestone | Date |
---|---|
Scoping Start | 09/27/2021 |
Comment Period | N/A |
Objection Period Start | N/A |
Decision | 01/19/2022 |
Implementation | 02/2022 (Estimated) |
Project Documents
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public