Water Control Structure Replacements

This project would replace the deteriorating or failing water control structures at 8 ponds with new functional water control structures and associated plumbing. The ponds would then be dredged to reduce sediment levels.

Location Summary

Towns of Lodi and Hector.

District: Hector Ranger District

Project Milestones

MilestoneDate
Scoping Start01/03/2022
Comment PeriodN/A
Objection Period StartN/A
Decision01/14/2022
Implementation04/2022 (Estimated)

Project Documents

Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.

If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.

Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public