Holy Cross Energy (HCE) Broad Band Fiber Optic Cable Installation and Communication Lease
Holy Cross Energy is proposing to install, own and maintain a broadband fiber optic cable on existing HCE-owned electric transmission line utility poles for customer use. No ground disturbance or additional utility poles are required.
Location Summary
The fiber would be attached to existing utility poles for Holy Cross Energy's electrical transmission line that crosses a portion NFS land 1,000ft N. of I-70 and 1 mile E. of Avon, CO.
District: East Zone/Holy Cross Ranger District
Project Milestones
Milestone | Date |
---|---|
Scoping Start | 08/16/2023 |
Comment Period | N/A |
Objection Period Start | N/A |
Decision | 05/17/2024 |
Implementation | 06/2024 (Estimated) |
Project Documents
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public