Sprucedale Road Repairs and Bank Stabalization

Engineering crews are proposing to repair the road and stabilize the bank on the Sprucedale Road after high water events during the 2023 spring eroded the bank encroaching into the road.

Location Summary

Sprucedale road (FSR565)is located off the FSR24 which can be reached though the US-191 from Alpine or Springervile then turning to the NFSR 26 and following it for 9.8 miles before turning onto FSR24

District: Alpine Ranger District

Project Milestones

MilestoneDate
Scoping Start09/29/2023
Comment PeriodN/A
Objection Period StartN/A
Decision03/29/2024
Implementation04/2024 (Estimated)

Project Documents

Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.

If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.

Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public