Jump River Electric Cooperative 2024-2027 Construction Workplan Project Codes 323-324-325
About 6.6 miles of two-phase 6A CW overhead powerline will be replaced with single-phase 1/o AL underground powerline for a total of 1.76 acres of disturbance. Aging facilities will be replaced allowing for new load balancing in the area.
Location Summary
Project Code 323 - 2.8 miles south and west of Lost Land Lake. Project Code 324 - 2.4 miles north of STH 77 between Lost Land and Teal Lakes. Project Code 325 - 1.4 miles east of Teal Lake.
District: Great Divide Ranger District
Project Milestones
Milestone | Date |
---|---|
Scoping Start | 04/10/2024 |
Comment Period | N/A |
Objection Period Start | N/A |
Decision | 07/03/2024 |
Implementation | 07/2024 (Estimated) |
Project Documents
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public