GAOA Crazy Woman Road (NFSR 33) Phase II Repairs
Construct a new bridge at mile post 1.7 on Crazy Woman Road (NFSR #33). Replace culvert with bridge at mile post 4.52. Construct gabion retaining walls between mile 4.52 and 4.9 in 3 narrow areas to provide slope stability.
Location Summary
Located along NFSR #33. Bridge sites at Mile 1.7, Mile 4.1 and the large culvert at Mile 4.52. There are also several retaining walls between 4.1 and 4.9.%u200B
District: Powder River Ranger District
Project Milestones
Milestone | Date |
---|---|
Scoping Start | 04/19/2023 |
Comment Period | N/A |
Objection Period Start | N/A |
Decision | 08/22/2024 |
Implementation | 06/2025 (Estimated) |
Project Documents
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public