Central New Mexico Electric Coop Capilla Transmission Line
Proposal to convert existing aerial transmission line to sub-surface. Includes removal of 33 power poles and installation of approximately 4,224 feet of sub-surface line along the existing right-of-way adjacent to CR B067.
Location Summary
Along the existing right-of-way near CR B067, Capilla Peak Road from the NFS boundary to Capilla Peak
District: Mountainair Ranger District
Project Milestones
Milestone | Date |
---|---|
Scoping Start | 08/28/2024 |
Comment Period | N/A |
Objection Period Start | N/A |
Decision | 09/19/2025 |
Implementation | 09/2025 (Estimated) |
Project Documents
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public