Central New Mexico Electric Coop Capilla Transmission Line

Proposal to convert existing aerial transmission line to sub-surface. Includes removal of 33 power poles and installation of approximately 4,224 feet of sub-surface line along the existing right-of-way adjacent to CR B067.

Location Summary

Along the existing right-of-way near CR B067, Capilla Peak Road from the NFS boundary to Capilla Peak

District: Mountainair Ranger District

Project Milestones

MilestoneDate
Scoping Start08/28/2024
Comment PeriodN/A
Objection Period StartN/A
Decision09/19/2025
Implementation09/2025 (Estimated)

Project Documents

Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.

If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.

Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public