Water Transmission Line Permit - Whitetail Ventures LLC Rhem Tunnel

Operation and maintenance of a water pipeline that carries water from the Rhem adit to private property. Current pipeline is constructed of 2.5 inch PVC aboveground approximately 2,500 feet in length with 10 feet wide right of way.

Location Summary

East Whitetail Canyon, Rhem Tunnel

District: Douglas Ranger District

Project Milestones

MilestoneDate
Scoping Start10/25/2024
Comment PeriodN/A
Objection Period StartN/A
Decision10/30/2024
Implementation11/2024 (Estimated)

Project Documents

Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.

If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.

Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public