2024 Highway 78 Fiber Project Special Use
Placement of buried (2) 1.50-inch duct containing 288ct fiber optic cable via plow and directional bore at a depth of 36 inches and a crossing at a depth of 48 inches with handhole placements.
Location Summary
Project is located along Highway 78 T16S R9E Sec 12 and T16S R10E Sec 7.
District: Shoal Creek Ranger District
Project Milestones
Milestone | Date |
---|---|
Scoping Start | 01/28/2025 |
Comment Period | N/A |
Objection Period Start | N/A |
Decision | 05/29/2025 |
Implementation | 06/2025 (Estimated) |
Project Documents
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public