PowerSouth Transmission Line SUP

PowerSouth has applied for a special use permit to install an overhead 115v power transmission line from their substation. The proposal is to widen the road right-of-way by 37 feet on the north side of Highway 186. Approximately 2.7 miles (12 acres).

Location Summary

Highway 80 east of the Tuskegee Ranger District along Highway 186 to the new industrial park adjacent to Interstate 85 (I-85).

District: Tuskegee Ranger District

Project Milestones

MilestoneDate
Scoping Start07/2025 (Estimated)
Comment Period08/2025 (Estimated)
Objection Period StartN/A
Decision11/2025 (Estimated)
Implementation12/2025 (Estimated)

Project Documents

Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.

If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.

Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public