Interstate 40 Broadband Flagstaff to New Mexico
Installation of high-speed/capacity fiber optic backbone to interconnect Intelligent Transportation System (ITS) devices within the existing Interstate 40 right-of-way. Includes trenching, conduit and pull box installation, and vegetation trimming.
Location Summary
Located within the Interstate 40 ROW, on the eastbound side. FRom the Country Club Drive Interchange east to the Forest boundary and continuing to the New Mexico state boundary.
District: Flagstaff Ranger District
Project Milestones
| Milestone | Date |
|---|---|
| Scoping Start | 04/08/2025 |
| Comment Period | N/A |
| Objection Period Start | N/A |
| Decision | 05/07/2025 |
| Implementation | 06/2025 (Estimated) |
Project Documents
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public