Projects & Plans
Schedule of Proposed Actions
The Forest publishes a Schedule of Proposed Actions (SOPA) four times a year: January, April, July and October. To view the current and past SOPAs, visit the Forest Service SOPA page for the Idaho Panhandle National Forests.
Environmental Appeal Responses
An Environmental Appeal is a formal request to an agency higher authority for review of an environmental planning (NEPA) decision. The public's rights to file an appeal are defined in specific appeal regulations. Usually, all administrative processes must be exhausted before a person can bring a court action (litigation) against with a NEPA decision. This usually includes the filing of a formal appeal. The following links provide access to recent and historical appeal decisions related to the Idaho Panhandle National Forests:
Pre-Decisional Objection Responses
Objections are written documents submitted by an individual or organization seeking a pre-decisional administrative review of a proposed hazardous fuel reduction project authorized by the Healthy Forests Restoration Act of 2003 (HFRA). The public may file objections after an environmental assessment or final environmental impact statement is completed and before a decision document is signed for a project under HFRA. The following link provides access to objection responses related to the Idaho Panhandle National Forests:
|
|
Forest Projects
Projects
2011 Precommercial Thinning & Pruning
(CE)
Approximately 6,300 acres of precommercial thinning with white pine pruning in some areas to be completed in the next five to ten years. Only hand-held tools would be used.
Status: Under Analysis
Management Unit: Avery Ranger District
Purpose: Vegetation management (other than forest products)
Bussel 484 Supplemental
(EIS)
Supplement the Bussel 484 EIS. Maintain or improve vegetation resiliency, provide wood products, work toward full support of designated beneficial uses, and manage access. 2012 ROD signed on 1/6/2012.
Legal notice of decision beginning appeal period published 1/27/2012.
Status: Under Analysis
Management Unit: St. Maries Ranger District
Purpose: Forest products, Recreation management, Road management, Watershed management
Charlie Preston
(EA)
Timber harvest, Rx burn, system road construction, temp road construction, road reconstruction, road decommissioning, road storage,riparian planting, LWD placement, culvert replacements, fuel treatment, planting
Status: Under Analysis
Management Unit: St. Maries Ranger District
Purpose: Watershed management, Fuels management, Vegetation management (other than forest products), Forest products, Wildlife, Fish, Rare plants, Road management
East Fork Meadow Creek
(EA)
Reduce the hazardous fuels and the risk of high severity fires; create a comprehensive road system that provides access to the area for vegetation management and fire suppression needs; maintain and improve aquatic habitat and watershed health.
Status: Analysis Completed
Management Unit: Bonners Ferry Ranger District
Purpose: Road management, Fuels management, Forest products, Vegetation management (other than forest products)
Equity in Potosi
(CE)
Excavate 140 sq. ft. panel to bedrock and haul pay gravel offsite (private) to process for gold
Status: Under Analysis
Management Unit: Wallace Ranger District
Purpose: Minerals and Geology
Fern Hardy HFRA Project
(EA)
Focus on fuels reduction and stand improvement in and around the Wildland Urban Interface, with possible watershed restoration or wildlife habitat improvement activities.
Status: Analysis Completed
Management Unit: Fernan Ranger District
Purpose: Fuels management, Vegetation management (other than forest products)
Green Slate
(CE)
70 acres of commercial thin to improve the health and vigor of the timber stand and to provide timber products. The project would maintain western larch and western white pine by reducing competition from grand fir, douglas-fir, and lodgepole pine. Mountain pine beetle activity is present in the lodgepole pine.
Status: Analysis Completed
Management Unit: Avery Ranger District
Purpose: Forest products
Hope Sagle Land Exchange
(EA)
The Idaho Panhandle National Forests and Stimson Lumber company propose to exchange lands within Bonner County, Idaho
Status: Analysis Completed
Management Unit: Sandpoint Ranger District
Purpose: Land ownership management
Idaho Panhandle and Kootenai National Forest, Forest Plan Revision
(EIS)
Forest Plan Revision
Status: Under Analysis
Management Unit: Idaho Panhandle National Forest All Units
Purpose: Land management planning
Lakeview-Reeder HFRA Project
(EIS)
The goals of the project are to reduce hazardous forest fuels within the project area, to decrease the risk of a wildfire negatively impacting communities, and to improve forest health and reduce the threats from stand replacing wildfires and insect and disease infestations.
Status: Under Analysis
Management Unit: Priest Lake Ranger District
Purpose: Fuels management
Leonia
(EA)
Vegetation and fire regime restoration
Status: Under Analysis
Management Unit: Bonners Ferry Ranger District
Purpose: Forest products
Moose Drool
(EA)
Watershed Restoration project aimed to improve water quality and stream habitat across 21,600 acres in the upper Little North Fork of the Coeur d'Alene River. Watershed improvement activities include road, riparian area, and in-stream activities.
Status: Under Analysis
Management Unit: Fernan Ranger District
Purpose: Wildlife, Fish, Rare plants, Watershed management
North Zone Juvenile Tree Thinning and White Pine Pruning
(CE)
Thin and/or prune approximately 5,200 acres of juvenile sapling sized stands that were established through planting and natural reforestation means on the Bonners Ferry, Priest Lake and Sandpoint Ranger Districts.
Status: Analysis Completed
Management Unit: Sandpoint Ranger District
Purpose: Vegetation management (other than forest products)
North Zone Roadside Salvage
(EA)
Provide community and economic stability and wood products by salvaging dead standing and down timber from alongside roads. Road maintenance consisting of spot gravel placement, removing vegetation from cut/fill slopes, and improve public safety.
Status: On Hold
Management Unit: Bonners Ferry Ranger District
Purpose: Forest products, Fuels management, Road management
Priest Lake Cattle & Horse Allotment Management Plans Project
(EA)
Livestock grazing
Status: Under Analysis
Management Unit: Priest Lake Ranger District
Purpose: Grazing management
Red Beauty HFRA Project
(EA)
Forest stand management, fuel reduction, road construction, road reconstruction and road decommissioning.
Status: Under Analysis
Management Unit: Fernan Ranger District
Purpose: Vegetation management (other than forest products), Fuels management
Schweitzer HFRA Fuels
(EA)
Fuels treatment, timber harvest, and temporary road construction.
Status: Under Analysis
Management Unit: Sandpoint Ranger District
Purpose: Fuels management
Selkirk Mountain Range Winter Travel Plan
(EIS)
The winter travel plan will better integrate the social and economic aspects of winter recreation uses with the needs of wildlife and other natural resources in the Selkirk Mountain Range.
Status: On Hold
Management Unit: Sandpoint Ranger District
Purpose: Recreation management
St. Joe Travel Management Plan
(EA)
The St. Joe Ranger District of the Idaho Panhandle National Forests is proposing to designate roads and trails for public motorized use by type of vehicle and time of year. Please visit our general information page for details about this project.
Status: Under Analysis
Management Unit: Avery Ranger District
Purpose: Recreation management, Road management
Windy Larch
(CE)
Commercial thin approx. 70 acres using skyline and tractor logging systems
Status: Under Analysis
Management Unit: St. Maries Ranger District
Purpose: Vegetation management (other than forest products), Forest products
Under Analysis
Bussel 484 Supplemental
(EIS)
Supplement the Bussel 484 EIS. Maintain or improve vegetation resiliency, provide wood products, work toward full support of designated beneficial uses, and manage access. 2012 ROD signed on 1/6/2012.
Legal notice of decision beginning appeal period published 1/27/2012.
Status: Under Analysis
Management Unit: St. Maries Ranger District
Purpose: Forest products, Recreation management, Road management, Watershed management
2011 Precommercial Thinning & Pruning
(CE)
Approximately 6,300 acres of precommercial thinning with white pine pruning in some areas to be completed in the next five to ten years. Only hand-held tools would be used.
Status: Under Analysis
Management Unit: Avery Ranger District
Purpose: Vegetation management (other than forest products)
Windy Larch
(CE)
Commercial thin approx. 70 acres using skyline and tractor logging systems
Status: Under Analysis
Management Unit: St. Maries Ranger District
Purpose: Vegetation management (other than forest products), Forest products
Lakeview-Reeder HFRA Project
(EIS)
The goals of the project are to reduce hazardous forest fuels within the project area, to decrease the risk of a wildfire negatively impacting communities, and to improve forest health and reduce the threats from stand replacing wildfires and insect and disease infestations.
Status: Under Analysis
Management Unit: Priest Lake Ranger District
Purpose: Fuels management
Schweitzer HFRA Fuels
(EA)
Fuels treatment, timber harvest, and temporary road construction.
Status: Under Analysis
Management Unit: Sandpoint Ranger District
Purpose: Fuels management
Priest Lake Cattle & Horse Allotment Management Plans Project
(EA)
Livestock grazing
Status: Under Analysis
Management Unit: Priest Lake Ranger District
Purpose: Grazing management
Moose Drool
(EA)
Watershed Restoration project aimed to improve water quality and stream habitat across 21,600 acres in the upper Little North Fork of the Coeur d'Alene River. Watershed improvement activities include road, riparian area, and in-stream activities.
Status: Under Analysis
Management Unit: Fernan Ranger District
Purpose: Wildlife, Fish, Rare plants, Watershed management
Equity in Potosi
(CE)
Excavate 140 sq. ft. panel to bedrock and haul pay gravel offsite (private) to process for gold
Status: Under Analysis
Management Unit: Wallace Ranger District
Purpose: Minerals and Geology
St. Joe Travel Management Plan
(EA)
The St. Joe Ranger District of the Idaho Panhandle National Forests is proposing to designate roads and trails for public motorized use by type of vehicle and time of year. Please visit our general information page for details about this project.
Status: Under Analysis
Management Unit: Avery Ranger District
Purpose: Recreation management, Road management
Charlie Preston
(EA)
Timber harvest, Rx burn, system road construction, temp road construction, road reconstruction, road decommissioning, road storage,riparian planting, LWD placement, culvert replacements, fuel treatment, planting
Status: Under Analysis
Management Unit: St. Maries Ranger District
Purpose: Watershed management, Fuels management, Vegetation management (other than forest products), Forest products, Wildlife, Fish, Rare plants, Road management
Idaho Panhandle and Kootenai National Forest, Forest Plan Revision
(EIS)
Forest Plan Revision
Status: Under Analysis
Management Unit: Idaho Panhandle National Forest All Units
Purpose: Land management planning
Leonia
(EA)
Vegetation and fire regime restoration
Status: Under Analysis
Management Unit: Bonners Ferry Ranger District
Purpose: Forest products
Red Beauty HFRA Project
(EA)
Forest stand management, fuel reduction, road construction, road reconstruction and road decommissioning.
Status: Under Analysis
Management Unit: Fernan Ranger District
Purpose: Vegetation management (other than forest products), Fuels management
Analysis Completed
North Zone Juvenile Tree Thinning and White Pine Pruning
(CE)
Thin and/or prune approximately 5,200 acres of juvenile sapling sized stands that were established through planting and natural reforestation means on the Bonners Ferry, Priest Lake and Sandpoint Ranger Districts.
Status: Analysis Completed
Management Unit: Sandpoint Ranger District
Purpose: Vegetation management (other than forest products)
East Fork Meadow Creek
(EA)
Reduce the hazardous fuels and the risk of high severity fires; create a comprehensive road system that provides access to the area for vegetation management and fire suppression needs; maintain and improve aquatic habitat and watershed health.
Status: Analysis Completed
Management Unit: Bonners Ferry Ranger District
Purpose: Road management, Fuels management, Forest products, Vegetation management (other than forest products)
Green Slate
(CE)
70 acres of commercial thin to improve the health and vigor of the timber stand and to provide timber products. The project would maintain western larch and western white pine by reducing competition from grand fir, douglas-fir, and lodgepole pine. Mountain pine beetle activity is present in the lodgepole pine.
Status: Analysis Completed
Management Unit: Avery Ranger District
Purpose: Forest products
Fern Hardy HFRA Project
(EA)
Focus on fuels reduction and stand improvement in and around the Wildland Urban Interface, with possible watershed restoration or wildlife habitat improvement activities.
Status: Analysis Completed
Management Unit: Fernan Ranger District
Purpose: Fuels management, Vegetation management (other than forest products)
Hope Sagle Land Exchange
(EA)
The Idaho Panhandle National Forests and Stimson Lumber company propose to exchange lands within Bonner County, Idaho
Status: Analysis Completed
Management Unit: Sandpoint Ranger District
Purpose: Land ownership management
On Hold
North Zone Roadside Salvage
(EA)
Provide community and economic stability and wood products by salvaging dead standing and down timber from alongside roads. Road maintenance consisting of spot gravel placement, removing vegetation from cut/fill slopes, and improve public safety.
Status: On Hold
Management Unit: Bonners Ferry Ranger District
Purpose: Forest products, Fuels management, Road management
Selkirk Mountain Range Winter Travel Plan
(EIS)
The winter travel plan will better integrate the social and economic aspects of winter recreation uses with the needs of wildlife and other natural resources in the Selkirk Mountain Range.
Status: On Hold
Management Unit: Sandpoint Ranger District
Purpose: Recreation management
Note: Projects with multiple Project Purposes will appear multiple times.
Forest products
Bussel 484 Supplemental
(EIS)
Supplement the Bussel 484 EIS. Maintain or improve vegetation resiliency, provide wood products, work toward full support of designated beneficial uses, and manage access. 2012 ROD signed on 1/6/2012.
Legal notice of decision beginning appeal period published 1/27/2012.
Status: Under Analysis
Management Unit: St. Maries Ranger District
Purpose: Forest products, Recreation management, Road management, Watershed management
North Zone Roadside Salvage
(EA)
Provide community and economic stability and wood products by salvaging dead standing and down timber from alongside roads. Road maintenance consisting of spot gravel placement, removing vegetation from cut/fill slopes, and improve public safety.
Status: On Hold
Management Unit: Bonners Ferry Ranger District
Purpose: Forest products, Fuels management, Road management
Windy Larch
(CE)
Commercial thin approx. 70 acres using skyline and tractor logging systems
Status: Under Analysis
Management Unit: St. Maries Ranger District
Purpose: Vegetation management (other than forest products), Forest products
East Fork Meadow Creek
(EA)
Reduce the hazardous fuels and the risk of high severity fires; create a comprehensive road system that provides access to the area for vegetation management and fire suppression needs; maintain and improve aquatic habitat and watershed health.
Status: Analysis Completed
Management Unit: Bonners Ferry Ranger District
Purpose: Road management, Fuels management, Forest products, Vegetation management (other than forest products)
Charlie Preston
(EA)
Timber harvest, Rx burn, system road construction, temp road construction, road reconstruction, road decommissioning, road storage,riparian planting, LWD placement, culvert replacements, fuel treatment, planting
Status: Under Analysis
Management Unit: St. Maries Ranger District
Purpose: Watershed management, Fuels management, Vegetation management (other than forest products), Forest products, Wildlife, Fish, Rare plants, Road management
Green Slate
(CE)
70 acres of commercial thin to improve the health and vigor of the timber stand and to provide timber products. The project would maintain western larch and western white pine by reducing competition from grand fir, douglas-fir, and lodgepole pine. Mountain pine beetle activity is present in the lodgepole pine.
Status: Analysis Completed
Management Unit: Avery Ranger District
Purpose: Forest products
Leonia
(EA)
Vegetation and fire regime restoration
Status: Under Analysis
Management Unit: Bonners Ferry Ranger District
Purpose: Forest products
Fuels management
North Zone Roadside Salvage
(EA)
Provide community and economic stability and wood products by salvaging dead standing and down timber from alongside roads. Road maintenance consisting of spot gravel placement, removing vegetation from cut/fill slopes, and improve public safety.
Status: On Hold
Management Unit: Bonners Ferry Ranger District
Purpose: Forest products, Fuels management, Road management
Lakeview-Reeder HFRA Project
(EIS)
The goals of the project are to reduce hazardous forest fuels within the project area, to decrease the risk of a wildfire negatively impacting communities, and to improve forest health and reduce the threats from stand replacing wildfires and insect and disease infestations.
Status: Under Analysis
Management Unit: Priest Lake Ranger District
Purpose: Fuels management
Schweitzer HFRA Fuels
(EA)
Fuels treatment, timber harvest, and temporary road construction.
Status: Under Analysis
Management Unit: Sandpoint Ranger District
Purpose: Fuels management
East Fork Meadow Creek
(EA)
Reduce the hazardous fuels and the risk of high severity fires; create a comprehensive road system that provides access to the area for vegetation management and fire suppression needs; maintain and improve aquatic habitat and watershed health.
Status: Analysis Completed
Management Unit: Bonners Ferry Ranger District
Purpose: Road management, Fuels management, Forest products, Vegetation management (other than forest products)
Charlie Preston
(EA)
Timber harvest, Rx burn, system road construction, temp road construction, road reconstruction, road decommissioning, road storage,riparian planting, LWD placement, culvert replacements, fuel treatment, planting
Status: Under Analysis
Management Unit: St. Maries Ranger District
Purpose: Watershed management, Fuels management, Vegetation management (other than forest products), Forest products, Wildlife, Fish, Rare plants, Road management
Red Beauty HFRA Project
(EA)
Forest stand management, fuel reduction, road construction, road reconstruction and road decommissioning.
Status: Under Analysis
Management Unit: Fernan Ranger District
Purpose: Vegetation management (other than forest products), Fuels management
Fern Hardy HFRA Project
(EA)
Focus on fuels reduction and stand improvement in and around the Wildland Urban Interface, with possible watershed restoration or wildlife habitat improvement activities.
Status: Analysis Completed
Management Unit: Fernan Ranger District
Purpose: Fuels management, Vegetation management (other than forest products)
Grazing management
Land management planning
Land ownership management
Hope Sagle Land Exchange
(EA)
The Idaho Panhandle National Forests and Stimson Lumber company propose to exchange lands within Bonner County, Idaho
Status: Analysis Completed
Management Unit: Sandpoint Ranger District
Purpose: Land ownership management
Minerals and Geology
Equity in Potosi
(CE)
Excavate 140 sq. ft. panel to bedrock and haul pay gravel offsite (private) to process for gold
Status: Under Analysis
Management Unit: Wallace Ranger District
Purpose: Minerals and Geology
Recreation management
Bussel 484 Supplemental
(EIS)
Supplement the Bussel 484 EIS. Maintain or improve vegetation resiliency, provide wood products, work toward full support of designated beneficial uses, and manage access. 2012 ROD signed on 1/6/2012.
Legal notice of decision beginning appeal period published 1/27/2012.
Status: Under Analysis
Management Unit: St. Maries Ranger District
Purpose: Forest products, Recreation management, Road management, Watershed management
Selkirk Mountain Range Winter Travel Plan
(EIS)
The winter travel plan will better integrate the social and economic aspects of winter recreation uses with the needs of wildlife and other natural resources in the Selkirk Mountain Range.
Status: On Hold
Management Unit: Sandpoint Ranger District
Purpose: Recreation management
St. Joe Travel Management Plan
(EA)
The St. Joe Ranger District of the Idaho Panhandle National Forests is proposing to designate roads and trails for public motorized use by type of vehicle and time of year. Please visit our general information page for details about this project.
Status: Under Analysis
Management Unit: Avery Ranger District
Purpose: Recreation management, Road management
Road management
Bussel 484 Supplemental
(EIS)
Supplement the Bussel 484 EIS. Maintain or improve vegetation resiliency, provide wood products, work toward full support of designated beneficial uses, and manage access. 2012 ROD signed on 1/6/2012.
Legal notice of decision beginning appeal period published 1/27/2012.
Status: Under Analysis
Management Unit: St. Maries Ranger District
Purpose: Forest products, Recreation management, Road management, Watershed management
North Zone Roadside Salvage
(EA)
Provide community and economic stability and wood products by salvaging dead standing and down timber from alongside roads. Road maintenance consisting of spot gravel placement, removing vegetation from cut/fill slopes, and improve public safety.
Status: On Hold
Management Unit: Bonners Ferry Ranger District
Purpose: Forest products, Fuels management, Road management
East Fork Meadow Creek
(EA)
Reduce the hazardous fuels and the risk of high severity fires; create a comprehensive road system that provides access to the area for vegetation management and fire suppression needs; maintain and improve aquatic habitat and watershed health.
Status: Analysis Completed
Management Unit: Bonners Ferry Ranger District
Purpose: Road management, Fuels management, Forest products, Vegetation management (other than forest products)
St. Joe Travel Management Plan
(EA)
The St. Joe Ranger District of the Idaho Panhandle National Forests is proposing to designate roads and trails for public motorized use by type of vehicle and time of year. Please visit our general information page for details about this project.
Status: Under Analysis
Management Unit: Avery Ranger District
Purpose: Recreation management, Road management
Charlie Preston
(EA)
Timber harvest, Rx burn, system road construction, temp road construction, road reconstruction, road decommissioning, road storage,riparian planting, LWD placement, culvert replacements, fuel treatment, planting
Status: Under Analysis
Management Unit: St. Maries Ranger District
Purpose: Watershed management, Fuels management, Vegetation management (other than forest products), Forest products, Wildlife, Fish, Rare plants, Road management
Vegetation management (other than forest products)
North Zone Juvenile Tree Thinning and White Pine Pruning
(CE)
Thin and/or prune approximately 5,200 acres of juvenile sapling sized stands that were established through planting and natural reforestation means on the Bonners Ferry, Priest Lake and Sandpoint Ranger Districts.
Status: Analysis Completed
Management Unit: Sandpoint Ranger District
Purpose: Vegetation management (other than forest products)
2011 Precommercial Thinning & Pruning
(CE)
Approximately 6,300 acres of precommercial thinning with white pine pruning in some areas to be completed in the next five to ten years. Only hand-held tools would be used.
Status: Under Analysis
Management Unit: Avery Ranger District
Purpose: Vegetation management (other than forest products)
Windy Larch
(CE)
Commercial thin approx. 70 acres using skyline and tractor logging systems
Status: Under Analysis
Management Unit: St. Maries Ranger District
Purpose: Vegetation management (other than forest products), Forest products
East Fork Meadow Creek
(EA)
Reduce the hazardous fuels and the risk of high severity fires; create a comprehensive road system that provides access to the area for vegetation management and fire suppression needs; maintain and improve aquatic habitat and watershed health.
Status: Analysis Completed
Management Unit: Bonners Ferry Ranger District
Purpose: Road management, Fuels management, Forest products, Vegetation management (other than forest products)
Charlie Preston
(EA)
Timber harvest, Rx burn, system road construction, temp road construction, road reconstruction, road decommissioning, road storage,riparian planting, LWD placement, culvert replacements, fuel treatment, planting
Status: Under Analysis
Management Unit: St. Maries Ranger District
Purpose: Watershed management, Fuels management, Vegetation management (other than forest products), Forest products, Wildlife, Fish, Rare plants, Road management
Red Beauty HFRA Project
(EA)
Forest stand management, fuel reduction, road construction, road reconstruction and road decommissioning.
Status: Under Analysis
Management Unit: Fernan Ranger District
Purpose: Vegetation management (other than forest products), Fuels management
Fern Hardy HFRA Project
(EA)
Focus on fuels reduction and stand improvement in and around the Wildland Urban Interface, with possible watershed restoration or wildlife habitat improvement activities.
Status: Analysis Completed
Management Unit: Fernan Ranger District
Purpose: Fuels management, Vegetation management (other than forest products)
Watershed management
Bussel 484 Supplemental
(EIS)
Supplement the Bussel 484 EIS. Maintain or improve vegetation resiliency, provide wood products, work toward full support of designated beneficial uses, and manage access. 2012 ROD signed on 1/6/2012.
Legal notice of decision beginning appeal period published 1/27/2012.
Status: Under Analysis
Management Unit: St. Maries Ranger District
Purpose: Forest products, Recreation management, Road management, Watershed management
Moose Drool
(EA)
Watershed Restoration project aimed to improve water quality and stream habitat across 21,600 acres in the upper Little North Fork of the Coeur d'Alene River. Watershed improvement activities include road, riparian area, and in-stream activities.
Status: Under Analysis
Management Unit: Fernan Ranger District
Purpose: Wildlife, Fish, Rare plants, Watershed management
Charlie Preston
(EA)
Timber harvest, Rx burn, system road construction, temp road construction, road reconstruction, road decommissioning, road storage,riparian planting, LWD placement, culvert replacements, fuel treatment, planting
Status: Under Analysis
Management Unit: St. Maries Ranger District
Purpose: Watershed management, Fuels management, Vegetation management (other than forest products), Forest products, Wildlife, Fish, Rare plants, Road management
Wildlife, Fish, Rare plants
Moose Drool
(EA)
Watershed Restoration project aimed to improve water quality and stream habitat across 21,600 acres in the upper Little North Fork of the Coeur d'Alene River. Watershed improvement activities include road, riparian area, and in-stream activities.
Status: Under Analysis
Management Unit: Fernan Ranger District
Purpose: Wildlife, Fish, Rare plants, Watershed management
Charlie Preston
(EA)
Timber harvest, Rx burn, system road construction, temp road construction, road reconstruction, road decommissioning, road storage,riparian planting, LWD placement, culvert replacements, fuel treatment, planting
Status: Under Analysis
Management Unit: St. Maries Ranger District
Purpose: Watershed management, Fuels management, Vegetation management (other than forest products), Forest products, Wildlife, Fish, Rare plants, Road management
Idaho Panhandle National Forest All Units
Avery Ranger District
2011 Precommercial Thinning & Pruning
(CE)
Approximately 6,300 acres of precommercial thinning with white pine pruning in some areas to be completed in the next five to ten years. Only hand-held tools would be used.
Status: Under Analysis
Management Unit: Avery Ranger District
Purpose: Vegetation management (other than forest products)
St. Joe Travel Management Plan
(EA)
The St. Joe Ranger District of the Idaho Panhandle National Forests is proposing to designate roads and trails for public motorized use by type of vehicle and time of year. Please visit our general information page for details about this project.
Status: Under Analysis
Management Unit: Avery Ranger District
Purpose: Recreation management, Road management
Green Slate
(CE)
70 acres of commercial thin to improve the health and vigor of the timber stand and to provide timber products. The project would maintain western larch and western white pine by reducing competition from grand fir, douglas-fir, and lodgepole pine. Mountain pine beetle activity is present in the lodgepole pine.
Status: Analysis Completed
Management Unit: Avery Ranger District
Purpose: Forest products
Bonners Ferry Ranger District
North Zone Roadside Salvage
(EA)
Provide community and economic stability and wood products by salvaging dead standing and down timber from alongside roads. Road maintenance consisting of spot gravel placement, removing vegetation from cut/fill slopes, and improve public safety.
Status: On Hold
Management Unit: Bonners Ferry Ranger District
Purpose: Forest products, Fuels management, Road management
East Fork Meadow Creek
(EA)
Reduce the hazardous fuels and the risk of high severity fires; create a comprehensive road system that provides access to the area for vegetation management and fire suppression needs; maintain and improve aquatic habitat and watershed health.
Status: Analysis Completed
Management Unit: Bonners Ferry Ranger District
Purpose: Road management, Fuels management, Forest products, Vegetation management (other than forest products)
Leonia
(EA)
Vegetation and fire regime restoration
Status: Under Analysis
Management Unit: Bonners Ferry Ranger District
Purpose: Forest products
Fernan Ranger District
Moose Drool
(EA)
Watershed Restoration project aimed to improve water quality and stream habitat across 21,600 acres in the upper Little North Fork of the Coeur d'Alene River. Watershed improvement activities include road, riparian area, and in-stream activities.
Status: Under Analysis
Management Unit: Fernan Ranger District
Purpose: Wildlife, Fish, Rare plants, Watershed management
Red Beauty HFRA Project
(EA)
Forest stand management, fuel reduction, road construction, road reconstruction and road decommissioning.
Status: Under Analysis
Management Unit: Fernan Ranger District
Purpose: Vegetation management (other than forest products), Fuels management
Fern Hardy HFRA Project
(EA)
Focus on fuels reduction and stand improvement in and around the Wildland Urban Interface, with possible watershed restoration or wildlife habitat improvement activities.
Status: Analysis Completed
Management Unit: Fernan Ranger District
Purpose: Fuels management, Vegetation management (other than forest products)
Priest Lake Ranger District
Lakeview-Reeder HFRA Project
(EIS)
The goals of the project are to reduce hazardous forest fuels within the project area, to decrease the risk of a wildfire negatively impacting communities, and to improve forest health and reduce the threats from stand replacing wildfires and insect and disease infestations.
Status: Under Analysis
Management Unit: Priest Lake Ranger District
Purpose: Fuels management
Priest Lake Cattle & Horse Allotment Management Plans Project
(EA)
Livestock grazing
Status: Under Analysis
Management Unit: Priest Lake Ranger District
Purpose: Grazing management
Sandpoint Ranger District
North Zone Juvenile Tree Thinning and White Pine Pruning
(CE)
Thin and/or prune approximately 5,200 acres of juvenile sapling sized stands that were established through planting and natural reforestation means on the Bonners Ferry, Priest Lake and Sandpoint Ranger Districts.
Status: Analysis Completed
Management Unit: Sandpoint Ranger District
Purpose: Vegetation management (other than forest products)
Schweitzer HFRA Fuels
(EA)
Fuels treatment, timber harvest, and temporary road construction.
Status: Under Analysis
Management Unit: Sandpoint Ranger District
Purpose: Fuels management
Selkirk Mountain Range Winter Travel Plan
(EIS)
The winter travel plan will better integrate the social and economic aspects of winter recreation uses with the needs of wildlife and other natural resources in the Selkirk Mountain Range.
Status: On Hold
Management Unit: Sandpoint Ranger District
Purpose: Recreation management
Hope Sagle Land Exchange
(EA)
The Idaho Panhandle National Forests and Stimson Lumber company propose to exchange lands within Bonner County, Idaho
Status: Analysis Completed
Management Unit: Sandpoint Ranger District
Purpose: Land ownership management
St. Maries Ranger District
Bussel 484 Supplemental
(EIS)
Supplement the Bussel 484 EIS. Maintain or improve vegetation resiliency, provide wood products, work toward full support of designated beneficial uses, and manage access. 2012 ROD signed on 1/6/2012.
Legal notice of decision beginning appeal period published 1/27/2012.
Status: Under Analysis
Management Unit: St. Maries Ranger District
Purpose: Forest products, Recreation management, Road management, Watershed management
Windy Larch
(CE)
Commercial thin approx. 70 acres using skyline and tractor logging systems
Status: Under Analysis
Management Unit: St. Maries Ranger District
Purpose: Vegetation management (other than forest products), Forest products
Charlie Preston
(EA)
Timber harvest, Rx burn, system road construction, temp road construction, road reconstruction, road decommissioning, road storage,riparian planting, LWD placement, culvert replacements, fuel treatment, planting
Status: Under Analysis
Management Unit: St. Maries Ranger District
Purpose: Watershed management, Fuels management, Vegetation management (other than forest products), Forest products, Wildlife, Fish, Rare plants, Road management
Wallace Ranger District
Equity in Potosi
(CE)
Excavate 140 sq. ft. panel to bedrock and haul pay gravel offsite (private) to process for gold
Status: Under Analysis
Management Unit: Wallace Ranger District
Purpose: Minerals and Geology
|
|
|
|
|
|