Status of Forest Projects

This page lists forest projects in different stages of analyses.  You may also find past projects, their objectives, and their results. If you are seeking information about a specific project or other project not listed, contact the appropriate NEPA Specialist or Kaibab NF Office.

Schedule of Proposed Actions (SOPA)/Appeals/Objections

SOPA - Kaibab NF


Forest Projects


Most recent projects are displayed first for the (22) projects listed

Sort By Project:    Name    Status    Management Unit    Purpose 

Developing Proposal

Kane Ranch Allotment Management Environmental Assessment (EA)

Forest Service project to re-evaluate and re-align the Allotment Management Plan for Kane Ranch operations on the Kaibab National Forest to address changes in vegetative conditions and provide adaptive, flexible grazing rotations for 10 to 20 years.

Status: Developing Proposal

Management Unit: North Kaibab Ranger District

Purpose: Grazing management


Nankoweap Trail Closure (CE)

Closure of up-to four (4) miles of existing, low-usage trail within the Saddle Mountain Wilderness Area.

Status: Developing Proposal

Management Unit: North Kaibab Ranger District

Purpose: Recreation management


Goshawk Demonstration Plot(s) (CE)

Demonstration Plot(s) on approximately 65 acres to improve timber stand and vegetative structure for wildlife habitat, within the ponderosa pine forest.

Status: Developing Proposal

Management Unit: North Kaibab Ranger District

Purpose: Research and Development, Vegetation management (other than forest products), Fuels management, Wildlife, Fish, Rare plants, Forest products


Recreation/Interpretation Trail between Stone and Steel Dams (CE)

The proposal is to make a connecting trail from Stone Dam parking area to Steel Dam. The trail would be about 0.35 miles in length and would be a standard/terra trail for non-motorized use. There would be one or two interpretation areas with kiosks.

Status: Developing Proposal

Management Unit: Williams Ranger District

Purpose: Recreation management, Heritage resource management


Under Analysis

X Fire Reforestation (2011) (CE)

The Tusayan Ranger District proposes to plant ponderosa pine seedlings on up to 876 acres encompassing the moderate to high severity burned area of the X Fire. Where necessary, seedlings will be protected from browsing.

Status: Under Analysis

Management Unit: Tusayan Ranger District

Purpose: Vegetation management (other than forest products)


North Kaibab Travel Management Project (EA)

Identify and establish a motorized road system on the North Kaibab Ranger District and publish a motorized vehicle use map

Status: Under Analysis

Management Unit: North Kaibab Ranger District

Purpose: Road management


Plateau Facility Fire Protection Project (EA)

Fuels reduction project at multiple sites on the North Kaibab Plateau

Status: Under Analysis

Management Unit: North Kaibab Ranger District

Purpose: Fuels management


Rainbow Rim Extension (CE)

Conversion of up-to seven (7) miles of unimproved road (i.e., old unused timber road) to a hiking and biking trail.

Status: Under Analysis

Management Unit: North Kaibab Ranger District

Purpose: Recreation management


Bill Williams Mountain Restoration Project (EIS)

The purpose of the project is to improve the health and sustainability of forested conditions on and surrounding Bill Williams Mountain by reducing hazardous fuels and moving vegetative conditions in the project area toward desired conditions.

Status: Under Analysis

Management Unit: Williams Ranger District

Purpose: Forest products, Vegetation management (other than forest products), Fuels management, Watershed management


McCracken Project (EA)

Vegetation Management and Fuels Reduction Project

Status: Under Analysis

Management Unit: Williams Ranger District

Purpose: Forest products, Fuels management


Analysis Completed

Jacob-Ryan Vegetation Management Project (EA)

The Jacob-Ryan Vegetation Management project proposes management within the ponderosa pine cover type, to improve northern goshawk habitat and to strive towards a restoration of the desired ecological condition at the landscape level (i.e., and un-even aged forest which is sustainable) as directed by the Kaibab National Forest Land Management Plan (April 1988 - as amended), otherwise commonly referred to as the Forest Plan. The JR Project Area lies within the North central portion of North Kaibab Ranger District.

Status: Analysis Completed

Management Unit: North Kaibab Ranger District

Purpose: Vegetation management (other than forest products), Wildlife, Fish, Rare plants, Land management planning, Fuels management


Aspen Restoration Project (CE)

Protect and restore aspen stands by thinning competing conifers and protecting regenerating aspen from ungulate browsing.

Status: Analysis Completed

Management Unit: Williams Ranger District

Purpose: Vegetation management (other than forest products)


Russell Vegetation Management Project (EA)

Non-commercial thinning and burning on appox. 8,000 acres.

Status: Analysis Completed

Management Unit: Tusayan Ranger District

Purpose: Vegetation management (other than forest products), Fuels management


Carlow Investors, LLC Sandstone Quarry Operations (CE)

Carlow Investors, LLC's Plan of Operations for the quarrying of sandstone.

Status: Analysis Completed

Management Unit: Williams Ranger District

Purpose: Minerals and Geology


Highway 64/180 Wireless Communication Sites Project (EA)

Const. a self-supported tower, up to 150' tall, at the existing Tusayan Comm. Site. Const. a 150' tall tower on the east side of Hwy 64 six miles south of Tusayan in T29N, R2E Section 24. Modify the KNF Forest Plan to designate the two Comm Sites.

Status: Analysis Completed

Management Unit: Tusayan Ranger District

Purpose: Special use management


Irishman Dam Allotment Environmental Assessment (EA)

Allotment analaysis for Irishman Dam Allotment

Status: Analysis Completed

Management Unit: Kaibab National Forest All Units

Purpose: Grazing management


Greenway Trail and Parking Lot (CE)

Allow the Park Service to construct and maintain a parking lot and trailhead on FS lands at the north end of Tusayan. Construction would also include building approx.1 mile of non-motorized trail from the new trailhead to Grand Canyon National Park.

Status: Analysis Completed

Management Unit: Tusayan Ranger District

Purpose: Recreation management


Tusayan Travel Management (EA)

Evaluate the transportation system for the Tusayan Ranger District in conjunction with the Travel Management Rule

Status: Analysis Completed

Management Unit: Tusayan Ranger District

Purpose: Road management, Watershed management, Recreation management, Wildlife, Fish, Rare plants


On Hold

Cancoop Vegetation Management & Wildlife Habitat Improvement Project (CE)

Prescribed burning on approximately 6230 acres to improve timber stand and vegetative structure.

Status: On Hold

Management Unit: North Kaibab Ranger District

Purpose: Wildlife, Fish, Rare plants, Fuels management, Vegetation management (other than forest products), Recreation management


VANE Minerals Uranium Exploratory Drilling Project (EIS)

The project proposal would conduct exploratory drilling at 24 different sites

Status: On Hold

Management Unit: Kaibab National Forest All Units

Purpose: Minerals and Geology


Cancelled

DIR Uranium Exploratory Drilling Project (EA)

DIR Exploration, Inc. proposes to drill a maximum of 20 separate exploratory drill holes distributed over 7 different claims, or project areas.

Status: Cancelled

Management Unit: Tusayan Ranger District

Purpose: Minerals and Geology


Highway Hazard Tree Removal (CE)

Remove dead and dying trees along Highways 67 and 89A that are outside of the ADOT right-of-way, but will fall into the roadway.

Status: Cancelled

Management Unit: North Kaibab Ranger District

Purpose: Road management