Forest Projects
Projects(23) Sorted alphabetically by name:
| Project Name |
Project Description |
|
1
of 1
|
|
Abandoned Mine Lands Project(CE)
|
The closing of 36 abandoned mine features (including adits, shafts, trenches and structures) using a combination of sealing and/or backfilling or bat friendly grates.
Status: Developing Proposal
Management Unit: Tusayan Ranger District
Purpose: Minerals and Geology
|
|
Bill Williams Cap Fuels Reduction Project(EA)
|
Reduce hazardous fuels on 10 acres at the top of Bill Williams Mountain to protect the electronic site. Note: This Project was formerly published as "Bill Williams Mountain Electronic Site Hazardous Fuels Reduction Project"
Status: Analysis Completed
Management Unit: Williams Ranger District
Purpose: Fuels management
|
|
Community Tank Grassland Restoration Project(EA)
|
Improve meadow/ open savannah conditions by reducing pine stocking to stimulate grass and forb development. Work will include slash disposal and prescribed burning to maintain open conditions. Work will enhance antelope habitat.
Status: Analysis Completed
Management Unit: Williams Ranger District
Purpose: Fuels management, Wildlife, Fish, Rare plants, Vegetation management (other than forest products)
|
|
Corva Allotment(EA)
|
AMP Update
Status: Analysis Completed
Management Unit: Williams Ranger District
Purpose: Grazing management
|
|
DIR Uranium Exploratory Drilling Project(EA)
|
DIR Exploration, Inc. proposes to drill a maximum of 20 separate exploratory drill holes distributed over 7 different claims, or project areas.
Status: Cancelled
Management Unit: Tusayan Ranger District
Purpose: Minerals and Geology
|
|
Double A Grazing Allotment Project(EA)
|
Reauthorize grazing on the Double A Allotments
Status: Analysis Completed
Management Unit: Williams Ranger District
Purpose: Grazing management
|
|
Greenway Trail and Parking Lot(CE)
|
Allow the Park Service to construct and maintain a parking lot and trailhead on FS lands at the north end of Tusayan. Construction would also include building approx.1 mile of non-motorized trail from the new trailhead to Grand Canyon National Park.
Status: Under Analysis
Management Unit: Tusayan Ranger District
Purpose: Recreation management
|
|
Hat Allotment(EA)
|
Reauthorize grazing on the Hat Allotment Project.
Status: Under Analysis
Management Unit: Williams Ranger District
Purpose: Grazing management
|
|
Highway 64/180 Wireless Communication Sites Project(EA)
|
Proposal to construct a 150' high tower and support facility on the east side of the HWY 64/180 corridor to provide improved wireless communications services in area and modify the KNF Forest Plan to designate existing communication site in Tusayan.
Status: Developing Proposal
Management Unit: Tusayan Ranger District
Purpose: Special use management
|
|
Highway Hazard Tree Removal(CE)
|
Remove dead and dying trees along Highways 67 and 89A that are outside of the ADOT right-of-way, but will fall into the roadway.
Status: Cancelled
Management Unit: North Kaibab Ranger District
Purpose: Road management
|
|
Jacob-Ryan Vegetation Management Project(EA)
|
North central portion of North Kaibab Ranger District
Status: Under Analysis
Management Unit: North Kaibab Ranger District
Purpose: Land management planning
|
|
Lost Canyon Adult Guest Lodge Special Use Permit(EA)
|
Construction of a 5000 sq. ft. lodge, and 5000 sq. ft. deck and 2000 sq. ft. parking lot on approximately 2 acres of National Forest Lands.
Status: Developing Proposal
Management Unit: Kaibab National Forest All Units
Purpose: Special use management
|
|
McCracken Project(EA)
|
Vegetation Management and Fuels Reduction Project
Status: Under Analysis
Management Unit: Williams Ranger District
Purpose: Fuels management, Forest products
|
|
North Kaibab Inter-agency Office Complex(EA)
|
Develop and construct a new inter-agency office complex 3/4 mile south of the existing admin facility. Construction would include a new office building and a new storage facility for vehicles, equipment and supplies.
Status: Analysis Completed
Management Unit: North Kaibab Ranger District
Purpose: Facility management
|
|
North Kaibab Travel Management Project(EA)
|
Identify and establish a motorized road system on the North Kaibab Ranger District and publish a motorized vehicle use map
Status: Under Analysis
Management Unit: North Kaibab Ranger District
Purpose: Road management
|
|
Plateau Facility Fire Protection Project(EA)
|
Fuels reduction project at multiple sites on the North Kaibab Plateau
Status: Developing Proposal
Management Unit: North Kaibab Ranger District
Purpose: Fuels management
|
|
Russell Vegetation Management Project(EA)
|
Non-commercial thinning and burning on appox. 8,000 acres.
Status: Under Analysis
Management Unit: Tusayan Ranger District
Purpose: Vegetation management (other than forest products), Fuels management
|
|
Tater Canyon Pipeline Replacement Project(EA)
|
Remove existing non-functional pipeline and replace with new in same footprint
Status: Under Analysis
Management Unit: North Kaibab Ranger District
Purpose: Grazing management, Land management planning
|
|
Tusayan Travel Management(EA)
|
Evaluate the transportation system for the Tusayan Ranger District in conjunction with the Travel Management Rule
Status: Under Analysis
Management Unit: Tusayan Ranger District
Purpose: Road management, Recreation management, Wildlife, Fish, Rare plants, Watershed management
|
|
VANE Minerals Uranium Exploratory Drilling Project(EIS)
|
The project proposal would conduct exploratory drilling at 24 different sites
Status: On Hold
Management Unit: Kaibab National Forest All Units
Purpose: Minerals and Geology
|
|
Warm Fire Recovery project(EIS)
|
Recover the economic value from burned timber; reforest burned conifer stands and move toward longer-term desired conditions; breakl up fuel continuity in the burned area.
Status: Under Analysis
Management Unit: North Kaibab Ranger District
Purpose: Fuels management, Forest products
|
|
Williams Travel Management(EA)
|
Identification and designation of a transportation system that provides safe and efficient forest access in compliance with 36 CFR 212.
Status: Analysis Completed
Management Unit: Williams Ranger District
Purpose: Wildlife, Fish, Rare plants, Road management, Watershed management, Heritage resource management, Recreation management
|
|
X-Fire Planting(CE)
|
Planting up to 20 acres of ponderosa pine in areas that burned at high severity in the X Fire. Fences will be constructed around the planted areas to protect regeneration from ungulate browsing; dead trees near the fences will be felled.
Status: Under Analysis
Management Unit: Tusayan Ranger District
Purpose: Vegetation management (other than forest products)
|
Developing Proposal
Projects(4) Sorted alphabetically by name:
| Project Name |
Project Description |
|
Abandoned Mine Lands Project(CE)
|
The closing of 36 abandoned mine features (including adits, shafts, trenches and structures) using a combination of sealing and/or backfilling or bat friendly grates.
Status: Developing Proposal
Management Unit: Tusayan Ranger District
Purpose: Minerals and Geology
|
|
Highway 64/180 Wireless Communication Sites Project(EA)
|
Proposal to construct a 150' high tower and support facility on the east side of the HWY 64/180 corridor to provide improved wireless communications services in area and modify the KNF Forest Plan to designate existing communication site in Tusayan.
Status: Developing Proposal
Management Unit: Tusayan Ranger District
Purpose: Special use management
|
|
Lost Canyon Adult Guest Lodge Special Use Permit(EA)
|
Construction of a 5000 sq. ft. lodge, and 5000 sq. ft. deck and 2000 sq. ft. parking lot on approximately 2 acres of National Forest Lands.
Status: Developing Proposal
Management Unit: Kaibab National Forest All Units
Purpose: Special use management
|
|
Plateau Facility Fire Protection Project(EA)
|
Fuels reduction project at multiple sites on the North Kaibab Plateau
Status: Developing Proposal
Management Unit: North Kaibab Ranger District
Purpose: Fuels management
|
Under Analysis
Projects(10) Sorted alphabetically by name:
| Project Name |
Project Description |
|
Greenway Trail and Parking Lot(CE)
|
Allow the Park Service to construct and maintain a parking lot and trailhead on FS lands at the north end of Tusayan. Construction would also include building approx.1 mile of non-motorized trail from the new trailhead to Grand Canyon National Park.
Status: Under Analysis
Management Unit: Tusayan Ranger District
Purpose: Recreation management
|
|
Hat Allotment(EA)
|
Reauthorize grazing on the Hat Allotment Project.
Status: Under Analysis
Management Unit: Williams Ranger District
Purpose: Grazing management
|
|
Jacob-Ryan Vegetation Management Project(EA)
|
North central portion of North Kaibab Ranger District
Status: Under Analysis
Management Unit: North Kaibab Ranger District
Purpose: Land management planning
|
|
McCracken Project(EA)
|
Vegetation Management and Fuels Reduction Project
Status: Under Analysis
Management Unit: Williams Ranger District
Purpose: Fuels management, Forest products
|
|
North Kaibab Travel Management Project(EA)
|
Identify and establish a motorized road system on the North Kaibab Ranger District and publish a motorized vehicle use map
Status: Under Analysis
Management Unit: North Kaibab Ranger District
Purpose: Road management
|
|
Russell Vegetation Management Project(EA)
|
Non-commercial thinning and burning on appox. 8,000 acres.
Status: Under Analysis
Management Unit: Tusayan Ranger District
Purpose: Vegetation management (other than forest products), Fuels management
|
|
Tater Canyon Pipeline Replacement Project(EA)
|
Remove existing non-functional pipeline and replace with new in same footprint
Status: Under Analysis
Management Unit: North Kaibab Ranger District
Purpose: Grazing management, Land management planning
|
|
Tusayan Travel Management(EA)
|
Evaluate the transportation system for the Tusayan Ranger District in conjunction with the Travel Management Rule
Status: Under Analysis
Management Unit: Tusayan Ranger District
Purpose: Road management, Recreation management, Wildlife, Fish, Rare plants, Watershed management
|
|
Warm Fire Recovery project(EIS)
|
Recover the economic value from burned timber; reforest burned conifer stands and move toward longer-term desired conditions; breakl up fuel continuity in the burned area.
Status: Under Analysis
Management Unit: North Kaibab Ranger District
Purpose: Fuels management, Forest products
|
|
X-Fire Planting(CE)
|
Planting up to 20 acres of ponderosa pine in areas that burned at high severity in the X Fire. Fences will be constructed around the planted areas to protect regeneration from ungulate browsing; dead trees near the fences will be felled.
Status: Under Analysis
Management Unit: Tusayan Ranger District
Purpose: Vegetation management (other than forest products)
|
Analysis Completed
Projects(6) Sorted alphabetically by name:
| Project Name |
Project Description |
|
Bill Williams Cap Fuels Reduction Project(EA)
|
Reduce hazardous fuels on 10 acres at the top of Bill Williams Mountain to protect the electronic site. Note: This Project was formerly published as "Bill Williams Mountain Electronic Site Hazardous Fuels Reduction Project"
Status: Analysis Completed
Management Unit: Williams Ranger District
Purpose: Fuels management
|
|
Community Tank Grassland Restoration Project(EA)
|
Improve meadow/ open savannah conditions by reducing pine stocking to stimulate grass and forb development. Work will include slash disposal and prescribed burning to maintain open conditions. Work will enhance antelope habitat.
Status: Analysis Completed
Management Unit: Williams Ranger District
Purpose: Fuels management, Wildlife, Fish, Rare plants, Vegetation management (other than forest products)
|
|
Corva Allotment(EA)
|
AMP Update
Status: Analysis Completed
Management Unit: Williams Ranger District
Purpose: Grazing management
|
|
Double A Grazing Allotment Project(EA)
|
Reauthorize grazing on the Double A Allotments
Status: Analysis Completed
Management Unit: Williams Ranger District
Purpose: Grazing management
|
|
North Kaibab Inter-agency Office Complex(EA)
|
Develop and construct a new inter-agency office complex 3/4 mile south of the existing admin facility. Construction would include a new office building and a new storage facility for vehicles, equipment and supplies.
Status: Analysis Completed
Management Unit: North Kaibab Ranger District
Purpose: Facility management
|
|
Williams Travel Management(EA)
|
Identification and designation of a transportation system that provides safe and efficient forest access in compliance with 36 CFR 212.
Status: Analysis Completed
Management Unit: Williams Ranger District
Purpose: Wildlife, Fish, Rare plants, Road management, Watershed management, Heritage resource management, Recreation management
|
On Hold
Projects(1) Sorted alphabetically by name:
| Project Name |
Project Description |
|
VANE Minerals Uranium Exploratory Drilling Project(EIS)
|
The project proposal would conduct exploratory drilling at 24 different sites
Status: On Hold
Management Unit: Kaibab National Forest All Units
Purpose: Minerals and Geology
|
Cancelled
Projects(2) Sorted alphabetically by name:
| Project Name |
Project Description |
|
DIR Uranium Exploratory Drilling Project(EA)
|
DIR Exploration, Inc. proposes to drill a maximum of 20 separate exploratory drill holes distributed over 7 different claims, or project areas.
Status: Cancelled
Management Unit: Tusayan Ranger District
Purpose: Minerals and Geology
|
|
Highway Hazard Tree Removal(CE)
|
Remove dead and dying trees along Highways 67 and 89A that are outside of the ADOT right-of-way, but will fall into the roadway.
Status: Cancelled
Management Unit: North Kaibab Ranger District
Purpose: Road management
|
Note: Projects with multiple Project Purposes will appear multiple times.
Facility management
Projects(1) Sorted alphabetically by name:
| Project Name |
Project Description |
|
North Kaibab Inter-agency Office Complex(EA)
|
Develop and construct a new inter-agency office complex 3/4 mile south of the existing admin facility. Construction would include a new office building and a new storage facility for vehicles, equipment and supplies.
Status: Analysis Completed
Management Unit: North Kaibab Ranger District
Purpose: Facility management
|
Forest products
Projects(2) Sorted alphabetically by name:
| Project Name |
Project Description |
|
McCracken Project(EA)
|
Vegetation Management and Fuels Reduction Project
Status: Under Analysis
Management Unit: Williams Ranger District
Purpose: Fuels management, Forest products
|
|
Warm Fire Recovery project(EIS)
|
Recover the economic value from burned timber; reforest burned conifer stands and move toward longer-term desired conditions; breakl up fuel continuity in the burned area.
Status: Under Analysis
Management Unit: North Kaibab Ranger District
Purpose: Fuels management, Forest products
|
Fuels management
Projects(6) Sorted alphabetically by name:
| Project Name |
Project Description |
|
Bill Williams Cap Fuels Reduction Project(EA)
|
Reduce hazardous fuels on 10 acres at the top of Bill Williams Mountain to protect the electronic site. Note: This Project was formerly published as "Bill Williams Mountain Electronic Site Hazardous Fuels Reduction Project"
Status: Analysis Completed
Management Unit: Williams Ranger District
Purpose: Fuels management
|
|
Community Tank Grassland Restoration Project(EA)
|
Improve meadow/ open savannah conditions by reducing pine stocking to stimulate grass and forb development. Work will include slash disposal and prescribed burning to maintain open conditions. Work will enhance antelope habitat.
Status: Analysis Completed
Management Unit: Williams Ranger District
Purpose: Fuels management, Wildlife, Fish, Rare plants, Vegetation management (other than forest products)
|
|
McCracken Project(EA)
|
Vegetation Management and Fuels Reduction Project
Status: Under Analysis
Management Unit: Williams Ranger District
Purpose: Fuels management, Forest products
|
|
Plateau Facility Fire Protection Project(EA)
|
Fuels reduction project at multiple sites on the North Kaibab Plateau
Status: Developing Proposal
Management Unit: North Kaibab Ranger District
Purpose: Fuels management
|
|
Russell Vegetation Management Project(EA)
|
Non-commercial thinning and burning on appox. 8,000 acres.
Status: Under Analysis
Management Unit: Tusayan Ranger District
Purpose: Vegetation management (other than forest products), Fuels management
|
|
Warm Fire Recovery project(EIS)
|
Recover the economic value from burned timber; reforest burned conifer stands and move toward longer-term desired conditions; breakl up fuel continuity in the burned area.
Status: Under Analysis
Management Unit: North Kaibab Ranger District
Purpose: Fuels management, Forest products
|
Grazing management
Projects(4) Sorted alphabetically by name:
| Project Name |
Project Description |
|
Corva Allotment(EA)
|
AMP Update
Status: Analysis Completed
Management Unit: Williams Ranger District
Purpose: Grazing management
|
|
Double A Grazing Allotment Project(EA)
|
Reauthorize grazing on the Double A Allotments
Status: Analysis Completed
Management Unit: Williams Ranger District
Purpose: Grazing management
|
|
Hat Allotment(EA)
|
Reauthorize grazing on the Hat Allotment Project.
Status: Under Analysis
Management Unit: Williams Ranger District
Purpose: Grazing management
|
|
Tater Canyon Pipeline Replacement Project(EA)
|
Remove existing non-functional pipeline and replace with new in same footprint
Status: Under Analysis
Management Unit: North Kaibab Ranger District
Purpose: Grazing management, Land management planning
|
Heritage resource management
Projects(1) Sorted alphabetically by name:
| Project Name |
Project Description |
|
Williams Travel Management(EA)
|
Identification and designation of a transportation system that provides safe and efficient forest access in compliance with 36 CFR 212.
Status: Analysis Completed
Management Unit: Williams Ranger District
Purpose: Wildlife, Fish, Rare plants, Road management, Watershed management, Heritage resource management, Recreation management
|
Land management planning
Projects(2) Sorted alphabetically by name:
| Project Name |
Project Description |
|
Jacob-Ryan Vegetation Management Project(EA)
|
North central portion of North Kaibab Ranger District
Status: Under Analysis
Management Unit: North Kaibab Ranger District
Purpose: Land management planning
|
|
Tater Canyon Pipeline Replacement Project(EA)
|
Remove existing non-functional pipeline and replace with new in same footprint
Status: Under Analysis
Management Unit: North Kaibab Ranger District
Purpose: Grazing management, Land management planning
|
Minerals and Geology
Projects(3) Sorted alphabetically by name:
| Project Name |
Project Description |
|
Abandoned Mine Lands Project(CE)
|
The closing of 36 abandoned mine features (including adits, shafts, trenches and structures) using a combination of sealing and/or backfilling or bat friendly grates.
Status: Developing Proposal
Management Unit: Tusayan Ranger District
Purpose: Minerals and Geology
|
|
DIR Uranium Exploratory Drilling Project(EA)
|
DIR Exploration, Inc. proposes to drill a maximum of 20 separate exploratory drill holes distributed over 7 different claims, or project areas.
Status: Cancelled
Management Unit: Tusayan Ranger District
Purpose: Minerals and Geology
|
|
VANE Minerals Uranium Exploratory Drilling Project(EIS)
|
The project proposal would conduct exploratory drilling at 24 different sites
Status: On Hold
Management Unit: Kaibab National Forest All Units
Purpose: Minerals and Geology
|
Recreation management
Projects(3) Sorted alphabetically by name:
| Project Name |
Project Description |
|
Greenway Trail and Parking Lot(CE)
|
Allow the Park Service to construct and maintain a parking lot and trailhead on FS lands at the north end of Tusayan. Construction would also include building approx.1 mile of non-motorized trail from the new trailhead to Grand Canyon National Park.
Status: Under Analysis
Management Unit: Tusayan Ranger District
Purpose: Recreation management
|
|
Tusayan Travel Management(EA)
|
Evaluate the transportation system for the Tusayan Ranger District in conjunction with the Travel Management Rule
Status: Under Analysis
Management Unit: Tusayan Ranger District
Purpose: Road management, Recreation management, Wildlife, Fish, Rare plants, Watershed management
|
|
Williams Travel Management(EA)
|
Identification and designation of a transportation system that provides safe and efficient forest access in compliance with 36 CFR 212.
Status: Analysis Completed
Management Unit: Williams Ranger District
Purpose: Wildlife, Fish, Rare plants, Road management, Watershed management, Heritage resource management, Recreation management
|
Road management
Projects(4) Sorted alphabetically by name:
| Project Name |
Project Description |
|
Highway Hazard Tree Removal(CE)
|
Remove dead and dying trees along Highways 67 and 89A that are outside of the ADOT right-of-way, but will fall into the roadway.
Status: Cancelled
Management Unit: North Kaibab Ranger District
Purpose: Road management
|
|
North Kaibab Travel Management Project(EA)
|
Identify and establish a motorized road system on the North Kaibab Ranger District and publish a motorized vehicle use map
Status: Under Analysis
Management Unit: North Kaibab Ranger District
Purpose: Road management
|
|
Tusayan Travel Management(EA)
|
Evaluate the transportation system for the Tusayan Ranger District in conjunction with the Travel Management Rule
Status: Under Analysis
Management Unit: Tusayan Ranger District
Purpose: Road management, Recreation management, Wildlife, Fish, Rare plants, Watershed management
|
|
Williams Travel Management(EA)
|
Identification and designation of a transportation system that provides safe and efficient forest access in compliance with 36 CFR 212.
Status: Analysis Completed
Management Unit: Williams Ranger District
Purpose: Wildlife, Fish, Rare plants, Road management, Watershed management, Heritage resource management, Recreation management
|
Special use management
Projects(2) Sorted alphabetically by name:
| Project Name |
Project Description |
|
Highway 64/180 Wireless Communication Sites Project(EA)
|
Proposal to construct a 150' high tower and support facility on the east side of the HWY 64/180 corridor to provide improved wireless communications services in area and modify the KNF Forest Plan to designate existing communication site in Tusayan.
Status: Developing Proposal
Management Unit: Tusayan Ranger District
Purpose: Special use management
|
|
Lost Canyon Adult Guest Lodge Special Use Permit(EA)
|
Construction of a 5000 sq. ft. lodge, and 5000 sq. ft. deck and 2000 sq. ft. parking lot on approximately 2 acres of National Forest Lands.
Status: Developing Proposal
Management Unit: Kaibab National Forest All Units
Purpose: Special use management
|
Vegetation management (other than forest products)
Projects(3) Sorted alphabetically by name:
| Project Name |
Project Description |
|
Community Tank Grassland Restoration Project(EA)
|
Improve meadow/ open savannah conditions by reducing pine stocking to stimulate grass and forb development. Work will include slash disposal and prescribed burning to maintain open conditions. Work will enhance antelope habitat.
Status: Analysis Completed
Management Unit: Williams Ranger District
Purpose: Fuels management, Wildlife, Fish, Rare plants, Vegetation management (other than forest products)
|
|
Russell Vegetation Management Project(EA)
|
Non-commercial thinning and burning on appox. 8,000 acres.
Status: Under Analysis
Management Unit: Tusayan Ranger District
Purpose: Vegetation management (other than forest products), Fuels management
|
|
X-Fire Planting(CE)
|
Planting up to 20 acres of ponderosa pine in areas that burned at high severity in the X Fire. Fences will be constructed around the planted areas to protect regeneration from ungulate browsing; dead trees near the fences will be felled.
Status: Under Analysis
Management Unit: Tusayan Ranger District
Purpose: Vegetation management (other than forest products)
|
Watershed management
Projects(2) Sorted alphabetically by name:
| Project Name |
Project Description |
|
Tusayan Travel Management(EA)
|
Evaluate the transportation system for the Tusayan Ranger District in conjunction with the Travel Management Rule
Status: Under Analysis
Management Unit: Tusayan Ranger District
Purpose: Road management, Recreation management, Wildlife, Fish, Rare plants, Watershed management
|
|
Williams Travel Management(EA)
|
Identification and designation of a transportation system that provides safe and efficient forest access in compliance with 36 CFR 212.
Status: Analysis Completed
Management Unit: Williams Ranger District
Purpose: Wildlife, Fish, Rare plants, Road management, Watershed management, Heritage resource management, Recreation management
|
Wildlife, Fish, Rare plants
Projects(3) Sorted alphabetically by name:
| Project Name |
Project Description |
|
Community Tank Grassland Restoration Project(EA)
|
Improve meadow/ open savannah conditions by reducing pine stocking to stimulate grass and forb development. Work will include slash disposal and prescribed burning to maintain open conditions. Work will enhance antelope habitat.
Status: Analysis Completed
Management Unit: Williams Ranger District
Purpose: Fuels management, Wildlife, Fish, Rare plants, Vegetation management (other than forest products)
|
|
Tusayan Travel Management(EA)
|
Evaluate the transportation system for the Tusayan Ranger District in conjunction with the Travel Management Rule
Status: Under Analysis
Management Unit: Tusayan Ranger District
Purpose: Road management, Recreation management, Wildlife, Fish, Rare plants, Watershed management
|
|
Williams Travel Management(EA)
|
Identification and designation of a transportation system that provides safe and efficient forest access in compliance with 36 CFR 212.
Status: Analysis Completed
Management Unit: Williams Ranger District
Purpose: Wildlife, Fish, Rare plants, Road management, Watershed management, Heritage resource management, Recreation management
|
Kaibab National Forest All Units
Projects(2) Sorted alphabetically by name:
| Project Name |
Project Description |
|
Lost Canyon Adult Guest Lodge Special Use Permit(EA)
|
Construction of a 5000 sq. ft. lodge, and 5000 sq. ft. deck and 2000 sq. ft. parking lot on approximately 2 acres of National Forest Lands.
Status: Developing Proposal
Management Unit: Kaibab National Forest All Units
Purpose: Special use management
|
|
VANE Minerals Uranium Exploratory Drilling Project(EIS)
|
The project proposal would conduct exploratory drilling at 24 different sites
Status: On Hold
Management Unit: Kaibab National Forest All Units
Purpose: Minerals and Geology
|
North Kaibab Ranger District
Projects(7) Sorted alphabetically by name:
| Project Name |
Project Description |
|
Highway Hazard Tree Removal(CE)
|
Remove dead and dying trees along Highways 67 and 89A that are outside of the ADOT right-of-way, but will fall into the roadway.
Status: Cancelled
Management Unit: North Kaibab Ranger District
Purpose: Road management
|
|
Jacob-Ryan Vegetation Management Project(EA)
|
North central portion of North Kaibab Ranger District
Status: Under Analysis
Management Unit: North Kaibab Ranger District
Purpose: Land management planning
|
|
North Kaibab Inter-agency Office Complex(EA)
|
Develop and construct a new inter-agency office complex 3/4 mile south of the existing admin facility. Construction would include a new office building and a new storage facility for vehicles, equipment and supplies.
Status: Analysis Completed
Management Unit: North Kaibab Ranger District
Purpose: Facility management
|
|
North Kaibab Travel Management Project(EA)
|
Identify and establish a motorized road system on the North Kaibab Ranger District and publish a motorized vehicle use map
Status: Under Analysis
Management Unit: North Kaibab Ranger District
Purpose: Road management
|
|
Plateau Facility Fire Protection Project(EA)
|
Fuels reduction project at multiple sites on the North Kaibab Plateau
Status: Developing Proposal
Management Unit: North Kaibab Ranger District
Purpose: Fuels management
|
|
Tater Canyon Pipeline Replacement Project(EA)
|
Remove existing non-functional pipeline and replace with new in same footprint
Status: Under Analysis
Management Unit: North Kaibab Ranger District
Purpose: Grazing management, Land management planning
|
|
Warm Fire Recovery project(EIS)
|
Recover the economic value from burned timber; reforest burned conifer stands and move toward longer-term desired conditions; breakl up fuel continuity in the burned area.
Status: Under Analysis
Management Unit: North Kaibab Ranger District
Purpose: Fuels management, Forest products
|
Tusayan Ranger District
Projects(7) Sorted alphabetically by name:
| Project Name |
Project Description |
|
Abandoned Mine Lands Project(CE)
|
The closing of 36 abandoned mine features (including adits, shafts, trenches and structures) using a combination of sealing and/or backfilling or bat friendly grates.
Status: Developing Proposal
Management Unit: Tusayan Ranger District
Purpose: Minerals and Geology
|
|
DIR Uranium Exploratory Drilling Project(EA)
|
DIR Exploration, Inc. proposes to drill a maximum of 20 separate exploratory drill holes distributed over 7 different claims, or project areas.
Status: Cancelled
Management Unit: Tusayan Ranger District
Purpose: Minerals and Geology
|
|
Greenway Trail and Parking Lot(CE)
|
Allow the Park Service to construct and maintain a parking lot and trailhead on FS lands at the north end of Tusayan. Construction would also include building approx.1 mile of non-motorized trail from the new trailhead to Grand Canyon National Park.
Status: Under Analysis
Management Unit: Tusayan Ranger District
Purpose: Recreation management
|
|
Highway 64/180 Wireless Communication Sites Project(EA)
|
Proposal to construct a 150' high tower and support facility on the east side of the HWY 64/180 corridor to provide improved wireless communications services in area and modify the KNF Forest Plan to designate existing communication site in Tusayan.
Status: Developing Proposal
Management Unit: Tusayan Ranger District
Purpose: Special use management
|
|
Russell Vegetation Management Project(EA)
|
Non-commercial thinning and burning on appox. 8,000 acres.
Status: Under Analysis
Management Unit: Tusayan Ranger District
Purpose: Vegetation management (other than forest products), Fuels management
|
|
Tusayan Travel Management(EA)
|
Evaluate the transportation system for the Tusayan Ranger District in conjunction with the Travel Management Rule
Status: Under Analysis
Management Unit: Tusayan Ranger District
Purpose: Road management, Recreation management, Wildlife, Fish, Rare plants, Watershed management
|
|
X-Fire Planting(CE)
|
Planting up to 20 acres of ponderosa pine in areas that burned at high severity in the X Fire. Fences will be constructed around the planted areas to protect regeneration from ungulate browsing; dead trees near the fences will be felled.
Status: Under Analysis
Management Unit: Tusayan Ranger District
Purpose: Vegetation management (other than forest products)
|
Williams Ranger District
Projects(7) Sorted alphabetically by name:
| Project Name |
Project Description |
|
Bill Williams Cap Fuels Reduction Project(EA)
|
Reduce hazardous fuels on 10 acres at the top of Bill Williams Mountain to protect the electronic site. Note: This Project was formerly published as "Bill Williams Mountain Electronic Site Hazardous Fuels Reduction Project"
Status: Analysis Completed
Management Unit: Williams Ranger District
Purpose: Fuels management
|
|
Community Tank Grassland Restoration Project(EA)
|
Improve meadow/ open savannah conditions by reducing pine stocking to stimulate grass and forb development. Work will include slash disposal and prescribed burning to maintain open conditions. Work will enhance antelope habitat.
Status: Analysis Completed
Management Unit: Williams Ranger District
Purpose: Fuels management, Wildlife, Fish, Rare plants, Vegetation management (other than forest products)
|
|
Corva Allotment(EA)
|
AMP Update
Status: Analysis Completed
Management Unit: Williams Ranger District
Purpose: Grazing management
|
|
Double A Grazing Allotment Project(EA)
|
Reauthorize grazing on the Double A Allotments
Status: Analysis Completed
Management Unit: Williams Ranger District
Purpose: Grazing management
|
|
Hat Allotment(EA)
|
Reauthorize grazing on the Hat Allotment Project.
Status: Under Analysis
Management Unit: Williams Ranger District
Purpose: Grazing management
|
|
McCracken Project(EA)
|
Vegetation Management and Fuels Reduction Project
Status: Under Analysis
Management Unit: Williams Ranger District
Purpose: Fuels management, Forest products
|
|
Williams Travel Management(EA)
|
Identification and designation of a transportation system that provides safe and efficient forest access in compliance with 36 CFR 212.
Status: Analysis Completed
Management Unit: Williams Ranger District
Purpose: Wildlife, Fish, Rare plants, Road management, Watershed management, Heritage resource management, Recreation management
|
|
|
|
|
|
|