American Transmission Company (ATC) - 6904/6905 Powerline Rebuild

EA -- Rebuild and upgrade the existing powerline from St. Ignace, MI to Rudyard, MI. The upgrade would increase the voltage from a 69 KV to a 138 KV transmission line.

Location Summary

Powerline corridor is found on the Eastside of the Hiawatha National Forest. The 6904/6905 Line Corridor is from St. Ignace, MI to Rudyard, MI.

Districts: Sault Ste. Marie Ranger District, St. Ignace Ranger District

Project Documents

  • Decision

    • Decision Notice and FONSI (PDF 16420kb)
      DN/FONSI and Appendix A (Response to Comments) signed Apr 13, 2012. Also includes a cover letter signed Apr 20, 2012.