Merit Network Fiber Optic Cable

EA -- Installation of a buried and overhead fiber optic cable along the existing road right-of-ways for approximately 24 miles.

Location Summary

The fiber optic corridor runs the length of the Forest on US Highway 2 from Rapid River to St. Ignace.

Districts: Rapid River Ranger District, Manistique Ranger District, St. Ignace Ranger District

Project Documents