DCP Douglas, LLC Natural Gas Pipeline to EOG Well

DCP will construct two 4inch natural gas pipelines; one high pressure steel line, one low pressure poly pipe, to the EOG-Arbalest 53-33H well to tie into their existing 4inch high pressure line. Less than 5 acres of NFS lands.

Location Summary

Approximately 6 miles north of the Jenny Trail Hwy 59 Junction then approximately 3 miles east of Hwy 59.

District: Douglas and Thunder Basin Ranger District