Enbridge Line 5 Pipeline Inspection and Maintenance Project

To issue a special use permit for the excavation, inspection, and repair of the Enbridge petroleum pipeline at two sites. The sites were identified during inline integrity testing and are within the Sturgeon Wild and Scenic River Corridor. Additional sites have been added and the project documentation for this project has changed from a categorical exclusion to an environmental assessment, therefore, a second 30-day comment period has been initiated in December 2012.

Location Summary

Approximately 3 miles north of US 2 at Nahma Junction, along FH13, just north of Flowing Well Campground. Access to the work area would be along the pipeline easement approx. 1/4 mile east of FH13.

District: Rapid River Ranger District

Project Documents

  • Analysis

    • EA (PDF 494kb)