Humboldt-Toiyabe National Forest Current and Recent Projects

Note: Not all projects may appear on map. See list below for complete list of projects with more information or documentation.
Sort By:    Name    Status    Management Unit    Purpose    Type

2013 Range Rescission Implementation

Project would build key fences to better control and rotate livestock, reducing impacts on riparian areas, one of which is an LCT stream (SF Indian Creek), heritage sites, etc...

Antelope Restoration Project

USFS proposal to restore stand health, reduce wildfire severity, and promote understory regeneration in sage-steppe, mtn shrub communities . Prescribed fire and mechanical treatments would be applied within approximately 65,000 acre project boundary

Bear Creek No.1 Hazardous Fuels Project

1. Thinning corridor, along the Charleston - Jarbidge road. 2. Fuel break along the FS Rd #58277. 3. Prescribed burn for 230 acres in the Bear Creek Watershed.

Big Springs Gold Mine Project

Anova Metals USA LLC proposes surface and underground mining operations at the Big Springs Mining area.

Black Jack Project

The exploration project will utilize three drill sites from which multiple drill holes will be drilled. The use of existing roads and approximately 3,500 feet of road maintenance will be required.

Blackbird Fence Project

Construct a fence to protect the Blackbird Ditch, a permitted water development, and supporting infrastructure provided it can be constructed in a way that avoids adverse effects to cultural resources, boundary management, and wildlife resources.

Bordertown to California 120kV Transmission Line

Construct 120kV transmission line connecting the Bordertown and California substations.

Buffalo-Everson Exploration

Drill boreholes using reverse-circulation or core methods to expected depths of 500-1,500 ft at up to 15 sites and construct up to 5,000 ft of new, temporary road. The drill pads and new roads would be recontoured and seeded upon project completion.

California Integrated Weed Management

The proposed action includes the development and implementation of an Integrated Weed Management System (IWMS) to treat noxious and invasive weeds on Humboldt-Toiyabe National Forest System Lands in California.

Cottonwood Dam #1 J-81 Breach Project

After breeching the dam trash will be removed from the pool area. A stable flow path for spring runoff through the reservoir will be established and the native plant community will be restored.

Currant-Ellison Watershed Restoration Project

The purpose of this project is to restore and maintain healthy and resilient watersheds, vegetation communities, wildlife habitats and to reduce fuels and wildfire risks particularly near private lands, structures and other critical resources.

DAP Mineral Exploration Project

Drill mineral exploration boreholes at 3 sites, with no new road construction.

Eastern Sierra ATV & UTV Jamboree

This is a ATV & UTV motorcycle touring type of ride on National Forest System lands. It will take place on approved motor vehicle routes as identified in the approved Motor Vehicle Use Maps

Figueroa Landscape Rock Acquisition

The proposal is to allow Figueroa Masonry to extract up to 500 tons of rock annually over a three-year period.

Fort McDermitt Cooperative Domestic Horse Removal Project

The project will remove domestic horses from National Forest System land in cooperation with Fort McDermitt Paiute-Shoshone Tribal government.

Golden Brew Exploration

Drill one or more boreholes at 4 sites and construct about 600 feet of new temporary road. Existing roads and 5,000 feet of overland travel will provide access.

Goldwedge 2014 Exploration Project CE

Proposal is for gold-silver minerals exploration drilling at up to 49 drill sites & construction of approx. 2,800-ft. of new temp. access roads,use of existing roads and overland travel on USFS administered federal lands totally approx. 3.2 acres.

Greater Sage Grouse Bi-State Distinct Population Segment Forest Plan Amendment

The FS is proposing to amend the Toiyabe National Forest LRMP and the BLM is proposing to amend the affected RMPs. The DEIS Public Comment Period has been extended form 12/27/2013 to 01/17/2014.

Hickison Wild Burro Territory Appropriate Management Levels and Management Actions Project

Project proposes to establish appropriate wild burro herd management levels, authorize population management actions, and approve reconstruction of water developments.

Humboldt - Toiyabe NF Wilderness Plans

Development of Wilderness Management Plans for Santa Rosa - Paradise Peak, Alta Toquima, Arc Dome and Table Mountain Wilderness areas and amendments to Humboldt National Forest LRMP and Toiyabe National Forest LRMP.

Humboldt-Toiyabe National Forest Plan Monitoring Transition

The new plan monitoring rule requires that monitoring plans include monitoring questions and associated indicators that inform the management of the plan resources in the area and whether management is being effective in maintaining and achieving progress toward desired conditions or objectives for the plan area. Monitoring questions and associated indicators are based on one or more desired condition, objective, or other plan component. Not every plan component needs to have a corresponding monitoring question. The responsible official should consider the series of questions in the draft LMP directive FSH 1909.12 Chapter 30, section 32.11 to identify which components require monitoring questions in order to effectively inform the Land and Resource Management Plan. To meet the minimum requirements of the 2012 Planning Rule, monitoring plans must address eight specific items identified in (36 CFR 219.12(a)(5).

Leviathan-Loope Rangeland Project

Reauthorize grazing on the Leviathan and Campbell-Loope Sheep and Goat allotments and close 3 vacant cattle and horse allotments: Mud Lake, Barber, and Double Springs.

Long Valley Creek Fence Exclosure Project

This project proposes to construct an exclosure to protect a cultural site. The fence will be constructed to Forest Service standards. It will be a 4 strand fence. Project was originally part of the 2013 Range Rescission Implementation project.

Manzanita Fuels Reduction and Ecosystem Management Project

Reduce Fuels and enhance wildlife habitat on approximately 700 acres within the wildland urban interface in Alpine County Clifornia near the town of Woodfords. The project area is within the old Acron Fire of 1987.

Monte Cristo Territory Management Plan pdate

The Forest Service will update the Monte Cristo Wild Horse and Burro Territory Management Plan to include strategies to maintain the herd into the future at AML and to compliment the BLM's management of the Pancake Wild Horse and Burro Complex.

Mount Moriah Cave Gate Project

A gate would be installed in the entrance of a cave located in the north Snake Range in eastern Nevada. The gate would be designed to allow for normal passage for bats and airflow and other small wildlife species that may use the cave for shelter.

Mountain Warfare Training Center Communications Infrastructure Upgrades Environmental Assesment

Completing Supplemental Analysis to authorize upgraded to two existing sites and one new site all three are on NFS lands

Mountain Warfare Training Center Operations Training Project

Under the Proposed Action a full complement of new vehicles, weapons systems/ordnance, engineer systems, aircraft, and equipment would be employed to augment the current set of training exercises.

Mt. Charleston Wilderness Management Plan

FS will prepare a Wilderness Management Plan for the Mt. Charleston Wilderness Area in cooperation with the Bureau of Land Management.

Mt. Rose Ski Tahoe - Atoma Area Project

The Forest Service proposes to amend the Mt. Rose Ski Tahoe special use permit to authorize commercial downhill skiing in the Atoma area and construction of a snowmaking water impoundment on the westernmost portion of the permit boundary

Nexus Walker Ridge Mineral Exploration Project

Nexus Gold Corp proposes a small scale drilling program (less than one year) at their Walker Ridge Project site in Elko County, NV. The program is anticipated to create approximately 4 acres of surface disturbance.

North Fork Little Humboldt River Meadow Headcut Repair Project

Project is to repair and stabilize headcuts and eroded areas within meadows and adjacent ephemeral stream channel segments within several portions of the headwaters of the North Fork Little Humboldt River.

Ollie Won Exploration Project

Excavation of exploration pits to collect subsurface samples for resource evaluation at up to 5 discreet sites within the project area. The proposed exploration pits will each have a working area with dimensions of approximately 8 ft. by 12 ft

Pine Grove - Lincoln Gold Project

Project involves drilling of 5 ground water monitoring wells, 9 condemnation drill holes, 6 geotechnical augur holes, and excavation of 9 test pits to determine soil properties.

PMMR Clay Mine Expansion

Proponent proposes to expand the existing clay mine. One pit would be expanded and one new pit developed. clay would be trucked off forest to a rail siding in Wabuska.

Reese River Diversion Stabilization Project

This project would replace an existing non-functional diversion structure with a new structure that will function as a diversion for irrigation. The proposal would also close an existing access road that enters the Arc Dome Wilderness.

Sierra Trail Dogs 250 Dual Sport

This is a motorcyle touring type of ride on National Forest System Lands. It will take place on approved motor vehicle routes as identified in the approved Motor Vehicle Use Maps

Spring Mountains Wild Horse & Burro Complex Project

Analyze appropriate managment levels and horse gathers on the Spring Mountains NRA and the Southern NV BLM District.

Swauger Creek Fuels Reduction Project

The purpose for this project is to restore stand health, reduce wildfire severity, promote under story regeneration in sage-steppe, mountain shrub, mixed conifer, and aspen communities and imrpove wildlife habitat and help create defensiable space.

Virginia Lake Pack Outfit and Leavitt Meadows Pack Station Permit Renewals

USFS proposal to issue new term permit to replace expired permits for both Virginia Lake Pack Outfit and Leavitt Meadows Pack Station Permits. Project on hold while Forest Service conducts a needs assessment.

Ward Mt Interagency Landscape Restoration and Fuels Reduction Project

Reduce the ecological departure from the reference conditions by reducing Fire Regime Condition Class (FRCC) and reduce the threat of wildfire to City of Ely and surrounding area, and improve wildlife habitat. Using a variety of treatment methods.

Project Archive

Some of our older projects can be accessed in our Project Archive.