Mt. Hood National Forest Current and Recent Projects

Sort By:    Name    Status    Management Unit    Purpose    Type

Bull Run Land Exchange

The Mt. Hood National Forest would convey 2,890 acres of land to the City of Portland, and acquire 2,440 acres of city land, all in the Bull Run Watershed Management Unit.

Dog River Pipeline Replacement

The existing Dog River pipeline, which is an important component of The Dalles' public drinking water supply, is deteriorating, leaking from tree damage, and exhibiting corrosion. This project proposes to replace the existing pipeline.

Forest Plan Amendment to Update the Bull Run Watershed Management Unit Land Use Allocation

Change all Land Use Allocations to DA-1 (Bull Run Watershed)and DA-3 (Research Natural Area) and update the Plan Standards & Guidlines to comply with Omnibus Parks & Public Lands Management and Little Sandy River Watershed Protection Acts.

Goat Mountain Thin

Thinning second-growth stands on approximately 2,800 acres of mid-aged stands ranging in age from 30 to 60 years old in parts of the Middle Clackamas, Lower Clackamas, and Lower Molalla River Watersheds.

Grove Thin

Thinning of second-growth stands in the Oak Grove and Middle Clackamas Watersheds

Indian Henry Campground

Assessment of options to deal with removing hazard trees caused by root diseases in Indian Henry Campground and modernization of facilities. Most of campground is closed at this time due to hazard.

Lava Restoration

Improve forest health in West, East & Middle Fork of Hood River subwatersheds. Treatments include plantation thinning, firewood removal & huckleberry enhancement, plus decommissioning 2.1 miles and closing (year round & seasonal) 22.3 miles of roads.

Lemiti Fuels Reduction Project

Fuels reduction and salvage of bug killed lodgepole pine on approximately 2,300 acres. Fuel treatments would include a mix of actions such as harvesting and removing trees, precommercial thinning, pruning, slash piling and pile burning.

Mazama Lodge Parking Area Expansion

The Mazamas are proposing to expand an existing 3-4 stall parking area located south of the Mazama Lodge on NFSR 2600530 into approximately 66 parking stalls and one bus pull-out, to mitigate a long-standing visitor safety issue.

Mt. Hood Meadows Parking Improvements EIS

This project builds the Twilight Parking Lot to expand parking and constructs a new, upgraded maintenance shop. All alternatives include installing utilities lines, building access roads, constructing turn lanes, and constructing Nordic ski trails.

North Fork Mill Creek Revised

Analyze changed conditions resulting from the Government Flats fire and assess how this impacts existing contractual obligations on two stewardship sales. The proposed treatments include restoration thinning, hazard tree treatments and reforestation.

Off-Highway Vehicle (OHV) Management Plan

To comply with Final Travel Managemet Rule [FR, Vol 70, No. 216 (2005)] for Off-highway vehicles. Designation of roads & trails open to OHV use by vehicle class. To amend the Forest Plan to change current policy closed to OHV unless designated open.

Pioneer Bridle Trail CE

The Pioneer Bridle trail will need to be relocated and reconstructed in sections where the ODOT highway expansion project will effect the trail location. Aproximately 1/2 mile of trail over a 2-mile stretch will be relocated.

Polallie Cooper Hazardous Fuels Reduction

Reduce fuels loading in fire adapted plant communities in the Cooper Spur Wildland Urban Interface located in the East Fork of Hood River watershed. Treatments may include plantation thinning, firewood removal, fuel break & natural stand thinning.

Portland General Electric (PGE) Buried Line Replacement near Summit Ski Area CE

In order to provide safe and reliable power, PGE has proposed to replace a current buried powerline that is failing due to aging. This new line (about 1,300 feet in length) will be installed adjacent to the existing line, which will remain in ground.

Portland General Electric (PGE) Regulator Replacement at Mt. Hood Meadows Ski Area CE

Because of low voltage problems caused by above ground regulators, PGE has proposed to replace the existing pole mounted regulator with a more reliable, in-ground vault.

Restoration 2015

Formerly called Restoration 2014. Fish habitat, watershed restoration, & water quality restoration projects. Projects include instream log & boulder placement, side channel creation, road closure, decommissioning & repair of vehicle damage.

Road Decommissioning for Habitat Restoration, Increment #3 (Barlow and Hood River Ranger Districts)

Decommissioning roads to improve hydrologic function and reduce adverse impacts to aquatic habitat on the Barlow and Hood River Ranger Districts.

Sandy River Trail Reconstruction

Portions of the Sandy River Trail would be reconstructed by installing drainage structures including drain dips, waterbars, rock armoring and check dams.

Skibowl Mountain Bike Trail Addition

Construct an additional 2 miles of downhill mountain bike trails within the Mt. Hood SkiBowl permit boundary. The proposed trail would go from the Upper Bowl Chairlift to Lower Bowl Chair area. Some of the trail would be within existing roads.

USGS Volcanic Monitoring Stations in the Mt. Hood Wilderness

Four monitoring stations would be installed in Mt. Hood Wilderness. They would be assembled and maintained by U.S. Geological Survey. The data would assess volcanic activity and assist in communications regarding volcanic hazards and public safety.

Project Archive

Some of our older projects can be accessed in our Project Archive.