Olympic National Forest Current and Recent Projects

Note: Not all projects may appear on map. See list below for complete list of projects with more information or documentation.
Sort By:    Name    Status    Management Unit    Purpose    Type

Olympic National Forest All Units

Grays Harbor Public Utilities District Neilton Point Maintenance Special Use Permit Modification

Modify Grays Harbor County Public Utilities District existing Special Use Permit to remove or top up to six trees that are interfering with transmission from the Neilton Point electronic site.

Precommercial Thinning (PCT) Fiscal Year (FY) 2016-2020

Precommercially thin up to 1,000 acres per year of 17 to 39 year-old trees during the next five years (FY2016-2020). Stands will be thinned generally to spacings of 12 to 20 feet (300 to 100 trees per acre, respectively).

Precommercial Thinning (PCT) Fiscal Year (FY) 2016-2020

Precommercially thin up to 800 acres per year of 17 to 39 year-old trees during the next five years (FY2016-2020). Stands will be thinned generally to spacings of 12 to 20 feet (300 to 100 trees per acre, respectively).

Rayonier Fahnestock Access

Permit Rayonier to reconstruct approximately 400 ft of road and construct another 800 ft to access private timber land. Total right-of-way length would be 1292 ft by 60 ft in width. Total acreage would be 1.7 acres.

Rocky Brook Hydroelectric Facilities Special Use Permit Reissuance

Reissue Special Use Permit for the Rocky Brook Hydroelectric facilities located on National Forest System lands.

Washington State Department of Fish and Wildlife Boat Launch Special Use Permit Reissuance

Reissue a 30-year term Special Use Permit for the use and associated maintenance of a boat launch on the Hoh River.

Hood Canal Ranger District

Dungeness Large Wood Enhancement Project

Partner with the Jamestown Sklallam tribe to construct 15 large wood jams and stabilize 3 naturally occurring wood jams in the Grey Wolf and Dungeness Rivers.

Emergency Relief for Federally Owned Roads (ERFO), FY16, Hood Canal Ranger District

Road maintenance within the right-of-way prism for FS-2610 (crossing at Case Creek), FS-2620 (repair culvert & washout), and FS-2650 (pipe replacement)

Lower Skokomish Vegetation Management Project

Conduct vegetation management (timber harvest) and restoration treatments on about 4,500 acres to improve and restore late successional forest habitat conditions for wildlife and watershed health and to contribute to local economies.

Pacific Ranger District South

Calawah OHV Project

Develop Off-Highway Vehicle (OHV) trail system and staging area in the Bonidu area within the North Fork Calawah watershed. The proposal would provide about 21.1 miles of interlinking trails.

Dedmore Private Road Reissuance

Reissue 20-year Special Use Permit for 500 feet of private road.

Dedmore Waterline Reissuance

Reissue 20-year Special Use Permit for a waterline (1000 ft. of 1 1/2 in. pipe) and associated improvements.

Emergency Relief for Federally Owned Roads (ERFO), Fiscal Year 2016, Pacific Ranger District

Road maintenance within the right-of-way prism at Newberry Creek

Hendricksen Waterline Reissue

Reissue waterline Special Use Permit that has been in use since the 1930's. No changes to the existing footprint are proposed.

Humptulips Thinning

Commercially variable density thin (thinning, heavy thinning, gaps up to two acres in size, and skips) up to 70 harvest acres, to be achieved through a timber sale/stewardship contract (uneven-aged harvesting).

Lake Quinault Chevron Permit Reissuance

Reissue 20-year Special Use Permit to Rain Forest Resort, Inc. for operation and maintenance of the Lake Quinault Chevron gas station and garage.

Norwood Conveyance

Sell property that is surplus to Forest Service needs. The property contains a number of structures\improvements, including but not limited to two residences.

Queets Vegetation Management

Commercially variable-density thin approximately 5,000 acres. The purpose of the project is to restore and improve late-successional habitat conditions, generate economic activity, and provide jobs in the local area.

Quinault Campgrounds Water Line Replacement

This project would design and replace the existing water distribution systems in Falls Creek Campground and Willaby Campground near Lake Quinault.

Quinault National Recreation Trail Repair and Reconstruction

Repair and reconstruct approximately 6.2 miles of trail, including some tread relocation and minor reconstruction, replacement of gravel surfacing, and drainage structure repair.

Schoemake Waterline Permit Reissue

Reissue waterline Special Use Permit, in use since the 1930's. No changes to the existing footprint.

Washington Dept. of Fish and Wildlife Bogachiel Fish Habitat Enhancement Structure Permit Reissuance

WA Dept. of Fish and Wildlife has held a special use permit for construction and maintenance of fish habitat enhancement structures near the Bogachiel River. The permit has expired, and reissuance of a new 10-year permit is proposed.

West Fork Humptulips River Trail Construction

Convert about 2.5 miles of decommissioned road to trail status and construct two ½ mile trail segments to create a 6-mile loop trail.

Quilcene Ranger District

Rocky Brook Hydroelectric Permit Renewal

Rocky Brook Hydroelectric Limited Partnership is seeking a new 20-year special use permit for their existing facilities. The project diverts up to 40 cubic feet per second (cfs) from Rocky Brook, with a minimum in-stream flow of 5 cfs.

Trapper Creek Aquatic Organism Passage

The existing culvert on Forest Road 2850 at the Trapper Creek crossing (MP 0.8), would be replaced with a structure designed to allow passage for all aquatic organisms. Structures made of rock and wood may be incorporated in the design.

Soleduck Ranger District

H to Z Thinning

Commercially variable density thin (thinning, heavy thinning, gaps up to two acres in size, and skips) up to 70 harvest acres, through a timber sale and/or stewardship contract (uneven-aged harvesting).

North Fork Calawah Vegetation Management Project

Conduct vegetation management (timber harvest) and restoration treatments on 4,000 acres to accelerate development of late-successional forest habitat conditions for wildlife and watershed health, and to contribute to local economies.

Pacific Northwest Electronic Warfare Range Environmental Assessment

Navy is proposing training electronic warfare range consisting of the movement and operation of mobile emitters. This EA is tiered from previous EIS. Several sites are on Forest Service Roads. Navy documents at: http://go.usa.gov/36s35

Project Archive

Some of our older projects can be accessed in our Project Archive.