Timber Volumes Planned for Offer within Inventoried Roadless Areas (IRAs). Note: Total Timber Volume includes salvage and biomass. | | | | | | | | |
The following table summarizes, by fiscal year TIMBER VOLUMES PLANNED FOR OFFER within Inventoried Roadless Areas. The following abbreviations are used: FY = Fiscal Year, MMBF = Million Board Feet | | List total planned MMBF and road miles for unroaded and roaded portions of IRAs | | Planned offer in unroaded portion of IRA that does not require road construction or reconstruction by sale type and logging system |
Timber Harvest Volume | FY '00 | FY '01 | FY '02 | FY '03 | FY '04 | Total Planned thru FY '04 | Possible Reduction thru FY '04 | Total Road Mileage | | Unroaded IRA portion totals | Roaded IRA portion totals | | | Stewardship sale MMBF | Commodity sale MMBF | Sub total MMBF |
ALASKA | | | | | | |
Total planned offered within IRAs MMBF | 113.00 | 113.00 | 92.00 | 96.00 | 125.00 | 539.00 | | | | 515.00 | 24.00 | | Helicopter | 0.00 | 27.00 | 27.00 |
Of the above, how much requires road (re)construction (MMBF)? | 108.00 | 107.00 | 87.00 | 91.00 | 119.00 | | 512.00 | | | 488.00 | 24.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 45.00 | 45.00 | 36.00 | 38.00 | 50.00 | | | 214.00 | | 204.00 | 10.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 27.00 | 27.00 |
How many miles of temporary road construction will be required? | 16.00 | 16.00 | 13.00 | 14.00 | 18.00 | | | 77.00 | | 74.00 | 3.00 | | |
ALABAMA | | | | | | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | 0.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
ARKANSAS | | | | | | |
Total planned offered within IRAs MMBF | 4.50 | 5.00 | 2.50 | 0.00 | 5.80 | 17.80 | | | | 1.30 | 16.50 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 1.10 | 4.00 | 1.50 | 0.00 | 3.80 | | 10.40 | | | 0.70 | 9.70 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.05 | 0.05 | 0.03 | 0.00 | 0.06 | | | 0.19 | | 0.00 | 0.19 | | Ground based logging | 0.00 | 0.60 | 0.60 |
How many miles of classified road must be reconstructed? | 2.79 | 3.10 | 1.55 | 0.00 | 3.62 | | | 11.06 | | 0.81 | 10.25 | | Total MMBF | 0.00 | 0.60 | 0.60 |
How many miles of temporary road construction will be required? | 0.05 | 0.05 | 0.03 | 0.00 | 0.06 | | | 0.19 | | 0.01 | 0.18 | | |
ARIZONA | | | | | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 1.00 | 0.00 | 0.00 | 1.00 | | | | 0.00 | 1.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 1.00 | 0.00 | 0.00 | | 1.00 | | | 0.00 | 1.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.50 | 0.00 | 0.00 | | | 0.50 | | 0.00 | 0.50 | | |
CALIFORNIA | |
Total planned offered within IRAs MMBF | 4.20 | 6.20 | 2.30 | 16.70 | 5.90 | 35.30 | | | | 23.30 | 12.00 | | Helicopter | 3.20 | 9.10 | 12.30 |
Of the above, how much requires road (re)construction (MMBF)? | 1.00 | 0.50 | 0.00 | 7.00 | 0.00 | | 8.50 | | | 3.00 | 5.50 | | Cable logging system | 1.00 | 4.00 | 5.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 4.00 | 0.00 | | | 4.00 | | 3.00 | 1.00 | | Ground based logging | 2.00 | 1.00 | 3.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 3.25 | 0.00 | | | 3.25 | | 2.25 | 1.00 | | Total MMBF | 6.20 | 14.10 | 20.30 |
How many miles of temporary road construction will be required? | 1.00 | 0.50 | 0.00 | 3.25 | 0.00 | | | 4.75 | | 3.75 | 1.00 | | |
COLORADO | |
Total planned offered within IRAs MMBF | 7.68 | 1.75 | 1.80 | 7.30 | 2.00 | 20.53 | | | | 14.44 | 6.09 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 6.18 | 1.25 | 1.20 | 4.29 | 2.00 | | 14.92 | | | 12.63 | 2.29 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.30 | 1.90 | 0.00 | 4.50 | 0.00 | | | 6.70 | | 6.10 | 0.60 | | Ground based logging | 0.81 | 1.00 | 1.81 |
How many miles of classified road must be reconstructed? | 2.05 | 0.10 | 0.00 | 3.00 | 0.00 | | | 5.15 | | 0.25 | 4.90 | | Total MMBF | 0.81 | 1.00 | 1.81 |
How many miles of temporary road construction will be required? | 4.40 | 0.90 | 3.30 | 3.50 | 1.00 | | | 13.10 | | 10.40 | 2.70 | | |
CONNECTICUT | | | | | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | 0.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
DISTRICT OF COLUMBIA | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | 0.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
DELAWARE | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | 0.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
FLORIDA | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | 0.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
GEORGIA | |
Total planned offered within IRAs MMBF | 1.15 | 0.00 | 0.00 | 0.00 | 0.00 | 1.15 | | | | 0.00 | 1.15 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
HAWAII | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | 0.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
IOWA | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | 0.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
IDAHO | |
Total planned offered within IRAs MMBF | 15.92 | 24.90 | 43.73 | 46.10 | 28.00 | 158.65 | | | | 144.75 | 13.90 | | Helicopter | 63.09 | 5.20 | 68.29 |
Of the above, how much requires road (re)construction (MMBF)? | 4.00 | 2.20 | 21.00 | 23.90 | 21.00 | | 72.10 | | | 61.00 | 11.10 | | Cable logging system | 2.90 | 0.50 | 3.40 |
How many miles of classified road construction will be required? | 0.00 | 0.50 | 8.60 | 15.00 | 8.50 | | | 32.60 | | 29.60 | 3.00 | | Ground based logging | 10.06 | 2.00 | 12.06 |
How many miles of classified road must be reconstructed? | 0.50 | 6.00 | 12.00 | 16.00 | 4.50 | | | 39.00 | | 4.00 | 35.00 | | Total MMBF | 76.05 | 7.70 | 83.75 |
How many miles of temporary road construction will be required? | 0.10 | 1.70 | 1.50 | 3.80 | 3.20 | | | 10.30 | | 7.20 | 3.10 | | |
ILLINOIS | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | 0.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
INDIANA | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | 0.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
KANSAS | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | 0.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
KENTUCKY | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | 0.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
LOUISIANA | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | 0.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
MASSACHUSETTS | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | 0.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
MARYLAND | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | 0.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
MAINE | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | 0.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
MICHIGAN | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 1.00 | 1.00 | | | | 1.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.20 | | 0.20 | | | 0.20 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.50 | | | 0.50 | | 0.50 | 0.00 | | Ground based logging | 0.10 | 0.70 | 0.80 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.50 | | | 0.50 | | 0.50 | 0.00 | | Total MMBF | 0.10 | 0.70 | 0.80 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
MINNESOTA | |
Total planned offered within IRAs MMBF | 0.00 | 4.20 | 16.20 | 5.70 | 0.00 | 26.10 | | | | 26.10 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 4.20 | 16.20 | 5.70 | 0.00 | | 26.10 | | | 26.10 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.50 | 0.00 | 0.00 | | | 0.50 | | 0.50 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 4.00 | 16.00 | 6.00 | 0.00 | | | 26.00 | | 26.00 | 0.00 | | |
MISSOURI | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | 0.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
MISSISSIPPI | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 3.00 | 0.00 | 0.00 | 3.00 | | | | 0.00 | 3.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 2.50 | 0.00 | 0.00 | | 2.50 | | | 0.00 | 2.50 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 2.50 | 0.00 | 0.00 | | | 2.50 | | 0.00 | 2.50 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
MONTANA | |
Total planned offered within IRAs MMBF | 4.21 | 7.77 | 4.37 | 0.37 | 0.37 | 17.09 | | | | 6.20 | 10.89 | | Helicopter | 3.90 | 0.00 | 3.90 |
Of the above, how much requires road (re)construction (MMBF)? | 0.10 | 2.90 | 0.80 | 0.00 | 0.00 | | 3.80 | | | 2.30 | 1.50 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 3.90 | 0.00 | 3.90 |
How many miles of temporary road construction will be required? | 1.25 | 3.70 | 0.30 | 0.00 | 0.00 | | | 5.25 | | 1.50 | 3.75 | | |
NORTH CAROLINA | |
Total planned offered within IRAs MMBF | 0.20 | 0.00 | 0.87 | 0.00 | 0.00 | 1.07 | | | | 0.65 | 0.42 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.67 | 0.00 | 0.00 | | 0.67 | | | 0.32 | 0.35 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.75 | 0.00 | 0.00 | | | 0.75 | | 0.75 | 0.00 | | Ground based logging | 0.33 | 0.00 | 0.33 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 2.25 | 0.00 | 0.00 | | | 2.25 | | 0.00 | 2.25 | | Total MMBF | 0.33 | 0.00 | 0.33 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.50 | 0.00 | 0.00 | | | 0.50 | | 0.00 | 0.50 | | |
NORTH DAKOTA | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | 0.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
NEBRASKA | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | 0.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
NEW HAMPSHIRE | |
Total planned offered within IRAs MMBF | 0.00 | 4.00 | 2.00 | 1.00 | 1.00 | 8.00 | | | | 7.00 | 1.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 1.00 | 0.50 | | 1.50 | | | 1.50 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.50 | 0.00 | | | 0.50 | | 0.50 | 0.00 | | Ground based logging | 4.00 | 1.50 | 5.50 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.50 | | | 0.50 | | 0.00 | 0.50 | | Total MMBF | 4.00 | 1.50 | 5.50 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
NEW JERSEY | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | 0.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
NEW MEXICO | |
Total planned offered within IRAs MMBF | 0.23 | 0.30 | 0.30 | 0.45 | 0.35 | 1.63 | | | | 0.00 | 1.63 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.13 | 0.13 | 0.25 | 0.25 | | 0.76 | | | 0.00 | 0.76 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 1.00 | 0.00 | 1.00 | 0.00 | | | 2.00 | | 0.00 | 2.00 | | |
NEVADA | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | 0.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
NEW YORK | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | 0.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
OHIO | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | 0.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
OKLAHOMA | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | 0.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
OREGON | |
Total planned offered within IRAs MMBF | 13.01 | 5.30 | 8.40 | 12.20 | 16.00 | 54.91 | | | | 35.41 | 19.50 | | Helicopter | 6.10 | 12.20 | 18.30 |
Of the above, how much requires road (re)construction (MMBF)? | 2.20 | 2.20 | 7.00 | 2.00 | 4.00 | | 17.40 | | | 12.75 | 4.65 | | Cable logging system | 2.90 | 1.00 | 3.90 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 2.50 | 0.70 | 1.00 | | | 4.20 | | 3.30 | 0.90 | | Ground based logging | 0.46 | 0.00 | 0.46 |
How many miles of classified road must be reconstructed? | 0.00 | 1.00 | 0.00 | 0.00 | 0.00 | | | 1.00 | | 0.00 | 1.00 | | Total MMBF | 9.46 | 13.20 | 22.66 |
How many miles of temporary road construction will be required? | 0.00 | 0.20 | 0.00 | 0.00 | 0.00 | | | 0.20 | | 0.00 | 0.20 | | |
PENNSYLVANIA | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 0.28 | 0.28 | | | | 0.28 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.28 | 0.28 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.28 | 0.28 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
PUERTO RICO | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | 0.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
RHODE ISLAND | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | 0.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
SOUTH CAROLINA | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | 0.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
SOUTH DAKOTA | |
Total planned offered within IRAs MMBF | 3.60 | 0.00 | 0.00 | 0.00 | 0.00 | 3.60 | | | | 3.60 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 3.60 | 3.60 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 3.60 | 3.60 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
TENNESSEE | |
Total planned offered within IRAs MMBF | 0.00 | 1.60 | 0.00 | 0.00 | 0.00 | 1.60 | | | | 1.60 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.40 | 0.00 | 0.00 | 0.00 | | 0.40 | | | 0.40 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 1.20 | 0.00 | 1.20 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 1.20 | 0.00 | 1.20 |
How many miles of temporary road construction will be required? | 0.00 | 1.35 | 0.00 | 0.00 | 0.00 | | | 1.35 | | 1.35 | 0.00 | | |
TEXAS | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | 0.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
UTAH | |
Total planned offered within IRAs MMBF | 18.89 | 15.27 | 35.37 | 13.99 | 24.69 | 108.21 | | | | 78.86 | 29.35 | | Helicopter | 5.80 | 0.00 | 5.80 |
Of the above, how much requires road (re)construction (MMBF)? | 13.27 | 10.04 | 30.94 | 10.10 | 22.00 | | 86.35 | | | 63.75 | 22.60 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 5.85 | 4.20 | 15.66 | 5.00 | 18.30 | | | 49.01 | | 39.91 | 9.10 | | Ground based logging | 4.31 | 5.00 | 9.31 |
How many miles of classified road must be reconstructed? | 1.60 | 1.75 | 3.30 | 1.00 | 2.70 | | | 10.35 | | 0.60 | 9.75 | | Total MMBF | 10.11 | 5.00 | 15.11 |
How many miles of temporary road construction will be required? | 1.60 | 4.95 | 6.40 | 2.20 | 2.90 | | | 18.05 | | 8.15 | 9.90 | | |
VIRGINIA | |
Total planned offered within IRAs MMBF | 0.76 | 0.00 | 3.45 | 0.00 | 0.00 | 4.21 | | | | 4.21 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 2.85 | 0.00 | 0.00 | | 2.85 | | | 2.85 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 3.20 | 0.00 | 0.00 | | | 3.20 | | 3.20 | 0.00 | | Ground based logging | 1.36 | 0.00 | 1.36 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.50 | 0.00 | 0.00 | | | 0.50 | | 0.50 | 0.00 | | Total MMBF | 1.36 | 0.00 | 1.36 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 1.70 | 0.00 | 0.00 | | | 1.70 | | 1.70 | 0.00 | | |
VERMONT | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 1.00 | 1.00 | | | | 1.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 1.00 | 0.00 | 1.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 1.00 | 0.00 | 1.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
WASHINGTON | |
Total planned offered within IRAs MMBF | 0.26 | 4.24 | 12.84 | 9.50 | 5.00 | 31.84 | | | | 26.61 | 5.23 | | Helicopter | 13.26 | 0.00 | 13.26 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 1.13 | 12.27 | 0.00 | 0.00 | | 13.40 | | | 12.28 | 1.12 | | Cable logging system | 0.50 | 0.15 | 0.65 |
How many miles of classified road construction will be required? | 0.00 | 0.50 | 11.00 | 0.00 | 0.00 | | | 11.50 | | 11.50 | 0.00 | | Ground based logging | 0.42 | 0.00 | 0.42 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 14.18 | 0.15 | 14.33 |
How many miles of temporary road construction will be required? | 0.00 | 0.60 | 1.00 | 0.00 | 0.00 | | | 1.60 | | 1.00 | 0.60 | | |
WISCONSIN | |
Total planned offered within IRAs MMBF | 3.86 | 9.90 | 3.24 | 3.00 | 4.10 | 24.10 | | | | 16.30 | 7.80 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 3.86 | 5.00 | 0.85 | 0.00 | 0.00 | | 9.71 | | | 5.83 | 3.88 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.20 | 0.00 | 0.00 | | | 0.20 | | 0.10 | 0.10 | | Ground based logging | 5.47 | 5.00 | 10.47 |
How many miles of classified road must be reconstructed? | 0.00 | 3.70 | 1.70 | 0.00 | 0.00 | | | 5.40 | | 2.00 | 3.40 | | Total MMBF | 5.47 | 5.00 | 10.47 |
How many miles of temporary road construction will be required? | 3.40 | 2.65 | 0.00 | 0.50 | 0.00 | | | 6.55 | | 3.94 | 2.61 | | |
WEST VIRGINIA | |
Total planned offered within IRAs MMBF | 0.24 | 9.00 | 2.55 | 2.00 | 2.00 | 15.79 | | | | 8.79 | 7.00 | | Helicopter | 0.50 | 5.50 | 6.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.15 | 0.00 | 2.00 | | 2.15 | | | 2.15 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 1.00 | 0.00 | 4.00 | | | 5.00 | | 5.00 | 0.00 | | Ground based logging | 0.64 | 0.00 | 0.64 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 1.14 | 5.50 | 6.64 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.40 | 0.00 | 2.50 | | | 2.90 | | 2.90 | 0.00 | | |
WYOMING | |
Total planned offered within IRAs MMBF | 1.81 | 0.60 | 13.30 | 2.50 | 8.50 | 26.71 | | | | 16.06 | 10.65 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 1.75 | 0.60 | 8.30 | 2.00 | 8.30 | | 20.95 | | | 14.80 | 6.15 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 3.20 | 1.00 | 2.00 | 1.00 | 6.70 | | | 13.90 | | 13.70 | 0.20 | | Ground based logging | 0.04 | 1.22 | 1.26 |
How many miles of classified road must be reconstructed? | 0.40 | 0.10 | 7.80 | 1.50 | 9.70 | | | 19.50 | | 13.70 | 5.80 | | Total MMBF | 0.04 | 1.22 | 1.26 |
How many miles of temporary road construction will be required? | 0.70 | 0.50 | 2.90 | 0.70 | 2.40 | | | 7.20 | | 4.50 | 2.70 | | |
|
Timber Volumes Planned for Offer within Inventoried Roadless Areas (IRAs). Note: Total Timber Volume includes salvage and biomass. | | |
The following table summarizes, by fiscal year TIMBER VOLUMES PLANNED FOR OFFER within Inventoried Roadless Areas. The following abbreviations are used: FY = Fiscal Year, MMBF = Million Board Feet | | List total planned MMBF and road miles for unroaded and roaded portions of IRAs | | Planned offer in unroaded portion of IRA that does not require road construction or reconstruction by sale type and logging system |
Timber Harvest Volume | FY '00 | FY '01 | FY '02 | FY '03 | FY '04 | Total Planned thru FY '04 | Possible Reduction thru FY '04 | Total Road Mileage | | Unroaded IRA portion totals | Roaded IRA portion totals | | | Stewardship sale MMBF | Commodity sale MMBF | Sub total MMBF |
AK - NE SUMMARY | |
Total planned offered within IRAs MMBF | 150.86 | 162.82 | 167.77 | 172.17 | 168.07 | 821.69 | | | | 732.74 | 88.95 | | Helicopter | 70.19 | 41.30 | 111.49 |
Of the above, how much requires road (re)construction (MMBF)? | 120.38 | 122.05 | 131.87 | 131.89 | 146.00 | | 652.19 | | | 594.25 | 57.94 | | Cable logging system | 3.90 | 4.50 | 8.40 |
How many miles of classified road construction will be required? | 45.35 | 47.45 | 45.88 | 61.50 | 59.06 | | | 259.24 | | 244.45 | 14.79 | | Ground based logging | 13.30 | 5.30 | 18.60 |
How many miles of classified road must be reconstructed? | 5.34 | 9.20 | 18.30 | 22.25 | 8.62 | | | 63.71 | | 7.81 | 55.90 | | Total MMBF | 87.39 | 51.10 | 138.49 |
How many miles of temporary road construction will be required? | 22.80 | 26.85 | 35.13 | 30.55 | 22.26 | | | 137.59 | | 122.86 | 14.73 | | |
NH - WY SUMMARY | |
Total planned offered within IRAs MMBF | 42.66 | 50.21 | 81.45 | 44.64 | 62.92 | 281.88 | | | | 199.72 | 82.16 | | Helicopter | 25.66 | 17.70 | 43.36 |
Of the above, how much requires road (re)construction (MMBF)? | 21.08 | 19.50 | 62.49 | 15.35 | 37.05 | | 155.47 | | | 116.31 | 39.16 | | Cable logging system | 3.40 | 1.15 | 4.55 |
How many miles of classified road construction will be required? | 9.05 | 5.70 | 35.56 | 7.20 | 30.00 | | | 87.51 | | 77.21 | 10.30 | | Ground based logging | 18.90 | 16.60 | 35.50 |
How many miles of classified road must be reconstructed? | 2.00 | 6.55 | 13.30 | 2.50 | 12.90 | | | 37.25 | | 16.80 | 20.45 | | Total MMBF | 47.96 | 35.45 | 83.41 |
How many miles of temporary road construction will be required? | 5.70 | 11.25 | 12.40 | 4.40 | 7.80 | | | 41.55 | | 23.54 | 18.01 | | |
| | | | | |
Timber Volumes Planned for Offer within Inventoried Roadless Areas (IRAs). Note: Total Timber Volume includes salvage and biomass. | | |
The following table summarizes, by fiscal year TIMBER VOLUMES PLANNED FOR OFFER within Inventoried Roadless Areas. The following abbreviations are used: FY = Fiscal Year, MMBF = Million Board Feet | | List total planned MMBF and road miles for unroaded and roaded portions of IRAs | | Planned offer in unroaded portion of IRA that does not require road construction or reconstruction by sale type and logging system |
Timber Harvest Volume | FY '00 | FY '01 | FY '02 | FY '03 | FY '04 | Total Planned thru FY '04 | Possible Reduction thru FY '04 | Total Road Mileage | | Unroaded IRA portion totals | Roaded IRA portion totals | | | Stewardship sale MMBF | Commodity sale MMBF | Sub total MMBF |
STATE SUMMARY | |
Total planned offered within IRAs MMBF | 193.52 | 213.03 | 249.22 | 216.81 | 230.99 | 1103.57 | | | | 932.46 | 171.11 | | Helicopter | 95.85 | 59.00 | 154.85 |
Of the above, how much requires road (re)construction (MMBF)? | 141.46 | 141.55 | 194.36 | 147.24 | 183.05 | | 807.66 | | | 710.56 | 97.10 | | Cable logging system | 7.30 | 5.65 | 12.95 |
How many miles of classified road construction will be required? | 54.40 | 53.15 | 81.44 | 68.70 | 89.06 | | | 346.75 | | 321.66 | 25.09 | | Ground based logging | 32.20 | 21.90 | 54.10 |
How many miles of classified road must be reconstructed? | 7.34 | 15.75 | 31.60 | 24.75 | 21.52 | | | 100.96 | | 24.61 | 76.35 | | Total MMBF | 135.35 | 86.55 | 221.90 |
How many miles of temporary road construction will be required? | 28.50 | 38.10 | 47.53 | 34.95 | 30.06 | | | 179.14 | | 146.40 | 32.74 | | |
| | | | | | | | | | | | | | | | |