State: Colorado | | | | | | | | | | | |
Timber Volumes Planned for Offer within Inventoried Roadless Areas (IRAs). Note: Total Timber Volume includes salvage and biomass. | | |
The following table summarizes, by fiscal year TIMBER VOLUMES PLANNED FOR OFFER within Inventoried Roadless Areas. The following abbreviations are used: FY = Fiscal Year, MMBF = Million Board Feet | | List total planned MMBF and road miles for unroaded and roaded portions of IRAs | | Planned offer in unroaded portion of IRA that does not require road construction or reconstruction by sale type and logging system |
Timber Harvest Volume | FY '00 | FY '01 | FY '02 | FY '03 | FY '04 | Total Planned thru FY '04 | Possible Reduction thru FY '04 | Total Road Mileage | | Unroaded IRA portion totals | Roaded IRA portion totals | | | Stewardship sale MMBF | Commodity sale MMBF | Sub total MMBF |
COLORADO | | | |
Total planned offered within IRAs MMBF | 7.68 | 1.75 | 1.80 | 7.30 | 2.00 | 20.53 | | | | 14.44 | 6.09 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 6.18 | 1.25 | 1.20 | 4.29 | 2.00 | | 14.92 | | | 12.63 | 2.29 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.30 | 1.90 | 0.00 | 4.50 | 0.00 | | | 6.70 | | 6.10 | 0.60 | | Ground based logging | 0.81 | 1.00 | 1.81 |
How many miles of classified road must be reconstructed? | 2.05 | 0.10 | 0.00 | 3.00 | 0.00 | | | 5.15 | | 0.25 | 4.90 | | Total MMBF | 0.81 | 1.00 | 1.81 |
How many miles of temporary road construction will be required? | 4.40 | 0.90 | 3.30 | 3.50 | 1.00 | | | 13.10 | | 10.40 | 2.70 | | |
APRAPHO-ROOSEVELT | | | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.10 | 1.90 | 0.00 | 2.00 | | | | 0.81 | 1.19 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.29 | 0.00 | | 0.29 | | | 0.00 | 0.29 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.81 | 0.00 | 0.81 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 3.00 | 0.00 | | | 3.00 | | 0.00 | 3.00 | | Total MMBF | 0.81 | 0.00 | 0.81 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.30 | 2.50 | 0.00 | | | 2.80 | | 1.30 | 1.50 | | |
GMUG | | | |
Total planned offered within IRAs MMBF | 2.50 | 1.00 | 0.00 | 0.00 | 0.00 | 3.50 | | | | 2.00 | 1.50 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 1.50 | 1.00 | 0.00 | 0.00 | 0.00 | | 2.50 | | | 1.00 | 1.50 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 1.60 | 0.00 | 0.00 | 0.00 | | | 1.60 | | 1.60 | 0.00 | | Ground based logging | 0.00 | 1.00 | 1.00 |
How many miles of classified road must be reconstructed? | 1.70 | 0.00 | 0.00 | 0.00 | 0.00 | | | 1.70 | | 0.00 | 1.70 | | Total MMBF | 0.00 | 1.00 | 1.00 |
How many miles of temporary road construction will be required? | 3.90 | 0.90 | 0.00 | 0.00 | 0.00 | | | 4.80 | | 3.60 | 1.20 | | |
MEDICINE BOW-ROUTT | | | | | |
Total planned offered within IRAs MMBF | 1.88 | 0.00 | 0.00 | 0.00 | 0.00 | 1.88 | | | | 1.88 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 1.88 | 0.00 | 0.00 | 0.00 | 0.00 | | 1.88 | | | 1.88 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.25 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.25 | | 0.25 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
RIO GRANDE | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 1.40 | 0.00 | 1.40 | | | | 0.00 | 1.40 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
SAN JUAN | |
Total planned offered within IRAs MMBF | 0.75 | 0.75 | 0.50 | 0.00 | 0.00 | 2.00 | | | | 0.00 | 2.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.25 | 0.25 | 0.00 | 0.00 | 0.00 | | 0.50 | | | 0.00 | 0.50 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.30 | 0.30 | 0.00 | 0.00 | 0.00 | | | 0.60 | | 0.00 | 0.60 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.10 | 0.10 | 0.00 | 0.00 | 0.00 | | | 0.20 | | 0.00 | 0.20 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
WHITE RIVER | |
Total planned offered within IRAs MMBF | 2.55 | 0.00 | 1.20 | 4.00 | 2.00 | 9.75 | | | | 9.75 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 2.55 | 0.00 | 1.20 | 4.00 | 2.00 | | 9.75 | | | 9.75 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 4.50 | 0.00 | | | 4.50 | | 4.50 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.50 | 0.00 | 3.00 | 1.00 | 1.00 | | | 5.50 | | 5.50 | 0.00 | | |
MANTI-LASAL | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | 0.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
|
| | | | | | | | | | | | | | | | |