State: Idaho | | | | | | | | | | | |
Timber Volumes Planned for Offer within Inventoried Roadless Areas (IRAs). Note: Total Timber Volume includes salvage and biomass. | | |
The following table summarizes, by fiscal year TIMBER VOLUMES PLANNED FOR OFFER within Inventoried Roadless Areas. The following abbreviations are used: FY = Fiscal Year, MMBF = Million Board Feet | | List total planned MMBF and road miles for unroaded and roaded portions of IRAs | | Planned offer in unroaded portion of IRA that does not require road construction or reconstruction by sale type and logging system |
Timber Harvest Volume | FY '00 | FY '01 | FY '02 | FY '03 | FY '04 | Total Planned thru FY '04 | Possible Reduction thru FY '04 | Total Road Mileage | | Unroaded IRA portion totals | Roaded IRA portion totals | | | Stewardship sale MMBF | Commodity sale MMBF | Sub total MMBF |
IDAHO | | | |
Total planned offered within IRAs MMBF | 15.92 | 24.90 | 43.73 | 46.10 | 28.00 | 158.65 | | | | 144.75 | 13.90 | | Helicopter | 63.09 | 5.20 | 68.29 |
Of the above, how much requires road (re)construction (MMBF)? | 4.00 | 2.20 | 21.00 | 23.90 | 21.00 | | 72.10 | | | 61.00 | 11.10 | | Cable logging system | 2.90 | 0.50 | 3.40 |
How many miles of classified road construction will be required? | 0.00 | 0.50 | 8.60 | 15.00 | 8.50 | | | 32.60 | | 29.60 | 3.00 | | Ground based logging | 10.06 | 2.00 | 12.06 |
How many miles of classified road must be reconstructed? | 0.50 | 6.00 | 12.00 | 16.00 | 4.50 | | | 39.00 | | 4.00 | 35.00 | | Total MMBF | 76.05 | 7.70 | 83.75 |
How many miles of temporary road construction will be required? | 0.10 | 1.70 | 1.50 | 3.80 | 3.20 | | | 10.30 | | 7.20 | 3.10 | | |
BITTERROOT | | | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | 0.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
CLEARWATER | | | |
Total planned offered within IRAs MMBF | 0.00 | 1.20 | 3.50 | 10.00 | 0.00 | 14.70 | | | | 14.70 | 0.00 | | Helicopter | 9.50 | 1.20 | 10.70 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 4.00 | 0.00 | | 4.00 | | | 4.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 4.00 | 0.00 | | | 4.00 | | 4.00 | 0.00 | | Total MMBF | 9.50 | 1.20 | 10.70 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.30 | 0.00 | | | 0.30 | | 0.30 | 0.00 | | |
IDAHO PANHANDLE | | | | | |
Total planned offered within IRAs MMBF | 6.92 | 1.50 | 17.73 | 14.00 | 3.00 | 43.15 | | | | 32.35 | 10.80 | | Helicopter | 15.45 | 0.00 | 15.45 |
Of the above, how much requires road (re)construction (MMBF)? | 4.00 | 1.50 | 8.00 | 5.50 | 3.00 | | 22.00 | | | 14.00 | 8.00 | | Cable logging system | 2.90 | 0.00 | 2.90 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 3.00 | 6.00 | 3.00 | | | 12.00 | | 12.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.50 | 3.50 | 12.00 | 10.00 | 3.00 | | | 29.00 | | 0.00 | 29.00 | | Total MMBF | 18.35 | 0.00 | 18.35 |
How many miles of temporary road construction will be required? | 0.10 | 0.20 | 0.50 | 0.50 | 0.20 | | | 1.50 | | 1.40 | 0.10 | | |
KOOTENAI | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | 0.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
NEZ PERCE | |
Total planned offered within IRAs MMBF | 0.00 | 10.00 | 0.00 | 0.00 | 0.00 | 10.00 | | | | 10.00 | 0.00 | | Helicopter | 10.00 | 0.00 | 10.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 10.00 | 0.00 | 10.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
BOISE | |
Total planned offered within IRAs MMBF | 5.00 | 4.20 | 2.50 | 4.00 | 5.00 | 20.70 | | | | 20.70 | 0.00 | | Helicopter | 16.20 | 0.00 | 16.20 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 2.00 | 0.00 | | 2.00 | | | 2.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 1.00 | 0.00 | | | 1.00 | | 1.00 | 0.00 | | Ground based logging | 2.50 | 0.00 | 2.50 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 18.70 | 0.00 | 18.70 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
CARIBOU | |
Total planned offered within IRAs MMBF | 1.50 | 1.00 | 2.00 | 4.10 | 2.00 | 10.60 | | | | 7.50 | 3.10 | | Helicopter | 2.50 | 0.00 | 2.50 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.70 | 0.00 | 2.40 | 2.00 | | 5.10 | | | 2.00 | 3.10 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.50 | 0.00 | 5.00 | 1.50 | | | 7.00 | | 4.00 | 3.00 | | Ground based logging | 1.00 | 2.00 | 3.00 |
How many miles of classified road must be reconstructed? | 0.00 | 2.50 | 0.00 | 2.00 | 1.50 | | | 6.00 | | 0.00 | 6.00 | | Total MMBF | 3.50 | 2.00 | 5.50 |
How many miles of temporary road construction will be required? | 0.00 | 1.50 | 0.00 | 2.00 | 2.00 | | | 5.50 | | 2.50 | 3.00 | | |
PAYETTE | |
Total planned offered within IRAs MMBF | 2.50 | 2.00 | 18.00 | 14.00 | 18.00 | 54.50 | | | | 54.50 | 0.00 | | Helicopter | 6.00 | 4.00 | 10.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 13.00 | 10.00 | 16.00 | | 39.00 | | | 39.00 | 0.00 | | Cable logging system | 0.00 | 0.50 | 0.50 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 5.60 | 3.00 | 4.00 | | | 12.60 | | 12.60 | 0.00 | | Ground based logging | 5.00 | 0.00 | 5.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 11.00 | 4.50 | 15.50 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 1.00 | 1.00 | 1.00 | | | 3.00 | | 3.00 | 0.00 | | |
TARGHEE | |
Total planned offered within IRAs MMBF | 0.00 | 5.00 | 0.00 | 0.00 | 0.00 | 5.00 | | | | 5.00 | 0.00 | | Helicopter | 3.44 | 0.00 | 3.44 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 1.56 | 0.00 | 1.56 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 5.00 | 0.00 | 5.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
WALLOWA-WHITMAN | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | 0.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
WASATCH-CACHE | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | 0.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
| | | | | | | | | | | | | | | | |