State: Oregon | | | | | | | | | | | |
Timber Volumes Planned for Offer within Inventoried Roadless Areas (IRAs). Note: Total Timber Volume includes salvage and biomass. | | |
The following table summarizes, by fiscal year TIMBER VOLUMES PLANNED FOR OFFER within Inventoried Roadless Areas. The following abbreviations are used: FY = Fiscal Year, MMBF = Million Board Feet | | List total planned MMBF and road miles for unroaded and roaded portions of IRAs | | Planned offer in unroaded portion of IRA that does not require road construction or reconstruction by sale type and logging system |
Timber Harvest Volume | FY '00 | FY '01 | FY '02 | FY '03 | FY '04 | Total Planned thru FY '04 | Possible Reduction thru FY '04 | Total Road Mileage | | Unroaded IRA portion totals | Roaded IRA portion totals | | | Stewardship sale MMBF | Commodity sale MMBF | Sub total MMBF |
OREGON | | | |
Total planned offered within IRAs MMBF | 13.01 | 5.30 | 8.40 | 12.20 | 16.00 | 54.91 | | | | 35.41 | 19.50 | | Helicopter | 6.10 | 12.20 | 18.30 |
Of the above, how much requires road (re)construction (MMBF)? | 2.20 | 2.20 | 7.00 | 2.00 | 4.00 | | 17.40 | | | 12.75 | 4.65 | | Cable logging system | 2.90 | 1.00 | 3.90 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 2.50 | 0.70 | 1.00 | | | 4.20 | | 3.30 | 0.90 | | Ground based logging | 0.46 | 0.00 | 0.46 |
How many miles of classified road must be reconstructed? | 0.00 | 1.00 | 0.00 | 0.00 | 0.00 | | | 1.00 | | 0.00 | 1.00 | | Total MMBF | 9.46 | 13.20 | 22.66 |
How many miles of temporary road construction will be required? | 0.00 | 0.20 | 0.00 | 0.00 | 0.00 | | | 0.20 | | 0.00 | 0.20 | | |
KLAMATH | | | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | 0.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
ROGUE RIVER | | | |
Total planned offered within IRAs MMBF | 0.00 | 0.60 | 8.00 | 3.00 | 5.00 | 16.60 | | | | 15.85 | 0.75 | | Helicopter | 3.10 | 0.00 | 3.10 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 7.00 | 2.00 | 4.00 | | 13.00 | | | 12.75 | 0.25 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 2.50 | 0.70 | 1.00 | | | 4.20 | | 3.30 | 0.90 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 3.10 | 0.00 | 3.10 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
SISKIYOU | | | | | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 4.00 | 1.00 | 5.00 | | | | 5.00 | 0.00 | | Helicopter | 0.00 | 3.00 | 3.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 1.00 | 1.00 | 2.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 1.00 | 4.00 | 5.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
SIUSLAW | |
Total planned offered within IRAs MMBF | 0.00 | 2.00 | 0.00 | 0.00 | 0.00 | 2.00 | | | | 1.00 | 1.00 | | Helicopter | 0.50 | 0.00 | 0.50 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.40 | 0.00 | 0.00 | 0.00 | | 0.40 | | | 0.00 | 0.40 | | Cable logging system | 0.50 | 0.00 | 0.50 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 1.00 | 0.00 | 0.00 | 0.00 | | | 1.00 | | 0.00 | 1.00 | | Total MMBF | 1.00 | 0.00 | 1.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.20 | 0.00 | 0.00 | 0.00 | | | 0.20 | | 0.00 | 0.20 | | |
UMATILLA | |
Total planned offered within IRAs MMBF | 0.31 | 0.00 | 0.00 | 0.00 | 0.00 | 0.31 | | | | 0.06 | 0.25 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.06 | 0.00 | 0.06 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.06 | 0.00 | 0.06 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
UMPQUA | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.30 | 0.00 | 0.00 | 0.30 | | | | 0.30 | 0.00 | | Helicopter | 0.30 | 0.00 | 0.30 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.30 | 0.00 | 0.30 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
WILLAMETTE | |
Total planned offered within IRAs MMBF | 10.50 | 0.90 | 0.10 | 5.20 | 10.00 | 26.70 | | | | 9.20 | 17.50 | | Helicopter | 0.00 | 9.20 | 9.20 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 9.20 | 9.20 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
WALLOWA-WHITMAN | |
Total planned offered within IRAs MMBF | 2.20 | 1.80 | 0.00 | 0.00 | 0.00 | 4.00 | | | | 4.00 | 0.00 | | Helicopter | 2.20 | 0.00 | 2.20 |
Of the above, how much requires road (re)construction (MMBF)? | 2.20 | 1.80 | 0.00 | 0.00 | 0.00 | | 4.00 | | | 0.00 | 4.00 | | Cable logging system | 1.40 | 0.00 | 1.40 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.40 | 0.00 | 0.40 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 4.00 | 0.00 | 4.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
|
| | | | | | | | | | | | | | | | |