State: Utah    
Timber Volumes Planned for Offer within Inventoried Roadless Areas (IRAs).  Note: Total Timber Volume includes salvage and biomass.
The following table summarizes, by fiscal year TIMBER VOLUMES PLANNED FOR OFFER within Inventoried Roadless Areas. The following abbreviations are used: FY = Fiscal Year, MMBF = Million Board Feet List total planned MMBF and road miles for unroaded and roaded portions of IRAs Planned offer in unroaded portion of IRA that does not require road construction or reconstruction by sale type and logging system
Timber Harvest Volume FY '00 FY '01 FY '02 FY '03 FY '04 Total Planned thru FY '04 Possible Reduction thru FY '04 Total Road Mileage Unroaded IRA portion totals Roaded IRA portion totals   Stewardship sale MMBF Commodity sale MMBF Sub total  MMBF
UTAH
Total planned offered within IRAs MMBF 18.89 15.27 35.37 13.99 24.69 108.21     78.86 29.35 Helicopter 5.80 0.00 5.80
Of the above, how much requires road (re)construction (MMBF)? 13.27 10.04 30.94 10.10 22.00   86.35   63.75 22.60 Cable logging system 0.00 0.00 0.00
How many miles of classified road construction will be required? 5.85 4.20 15.66 5.00 18.30     49.01 39.91 9.10 Ground based logging 4.31 5.00 9.31
How many miles of classified road must be reconstructed? 1.60 1.75 3.30 1.00 2.70     10.35 0.60 9.75 Total MMBF 10.11 5.00 15.11
How many miles of temporary  road construction will be required? 1.60 4.95 6.40 2.20 2.90     18.05 8.15 9.90
ASHLEY
Total planned offered within IRAs MMBF 1.00 1.00 1.00 1.00 1.00 5.00     5.00 0.00 Helicopter 0.00 0.00 0.00
Of the above, how much requires road (re)construction (MMBF)? 0.00 0.00 0.00 0.00 0.00   0.00   0.00 0.00 Cable logging system 0.00 0.00 0.00
How many miles of classified road construction will be required? 0.00 0.00 0.00 0.00 0.00     0.00 0.00 0.00 Ground based logging 0.00 5.00 5.00
How many miles of classified road must be reconstructed? 0.00 0.00 0.00 0.00 0.00     0.00 0.00 0.00 Total MMBF 0.00 5.00 5.00
How many miles of temporary  road construction will be required? 0.00 0.00 0.00 0.00 0.00     0.00 0.00 0.00
CARIBOU
Total planned offered within IRAs MMBF 0.00 0.00 0.00 0.00 0.00 0.00     0.00 0.00 Helicopter 0.00 0.00 0.00
Of the above, how much requires road (re)construction (MMBF)? 0.00 0.00 0.00 0.00 0.00   0.00   0.00 0.00 Cable logging system 0.00 0.00 0.00
How many miles of classified road construction will be required? 0.00 0.00 0.00 0.00 0.00     0.00 0.00 0.00 Ground based logging 0.00 0.00 0.00
How many miles of classified road must be reconstructed? 0.00 0.00 0.00 0.00 0.00     0.00 0.00 0.00 Total MMBF 0.00 0.00 0.00
How many miles of temporary  road construction will be required? 0.00 0.00 0.00 0.00 0.00     0.00 0.00 0.00
DIXIE
Total planned offered within IRAs MMBF 3.70 4.48 17.48 1.00 14.90 41.56     41.56 0.00 Helicopter 0.00 0.00 0.00
Of the above, how much requires road (re)construction (MMBF)? 3.17 3.84 16.84 0.70 14.90   39.45   39.45 0.00 Cable logging system 0.00 0.00 0.00
How many miles of classified road construction will be required? 1.75 3.50 9.66 0.00 16.80     31.71 31.71 0.00 Ground based logging 2.11 0.00 2.11
How many miles of classified road must be reconstructed? 0.00 0.00 0.00 0.00 0.00     0.00 0.00 0.00 Total MMBF 2.11 0.00 2.11
How many miles of temporary  road construction will be required? 0.00 1.00 1.00 0.00 0.00     2.00 2.00 0.00
FISHLAKE
Total planned offered within IRAs MMBF 3.10 2.20 7.50 3.50 4.00 20.30     0.00 20.30 Helicopter 0.00 0.00 0.00
Of the above, how much requires road (re)construction (MMBF)? 3.10 2.20 7.50 3.50 4.00   20.30   0.00 20.30 Cable logging system 0.00 0.00 0.00
How many miles of classified road construction will be required? 3.00 0.00 2.50 2.00 0.50     8.00 0.00 8.00 Ground based logging 0.00 0.00 0.00
How many miles of classified road must be reconstructed? 0.00 0.00 0.00 0.00 0.00     0.00 0.00 0.00 Total MMBF 0.00 0.00 0.00
How many miles of temporary  road construction will be required? 1.30 1.20 2.60 1.70 1.50     8.30 0.00 8.30
MANTI-LASAL
Total planned offered within IRAs MMBF 11.00 5.00 5.70 8.30 3.10 33.10     25.30 7.80 Helicopter 5.80 0.00 5.80
Of the above, how much requires road (re)construction (MMBF)? 7.00 1.50 4.00 5.80 1.50   19.80   17.80 2.00 Cable logging system 0.00 0.00 0.00
How many miles of classified road construction will be required? 1.10 0.70 2.00 3.00 1.00     7.80 6.80 1.00 Ground based logging 1.70 0.00 1.70
How many miles of classified road must be reconstructed? 1.60 1.75 2.30 1.00 2.10     8.75 0.00 8.75 Total MMBF 7.50 0.00 7.50
How many miles of temporary  road construction will be required? 0.30 0.25 0.70 0.50 0.40     2.15 1.05 1.10
UINTA
Total planned offered within IRAs MMBF 0.09 2.59 0.19 0.19 1.69 4.75     4.00 0.75 Helicopter 0.00 0.00 0.00
Of the above, how much requires road (re)construction (MMBF)? 0.00 2.50 0.10 0.10 1.60   4.30   4.00 0.30 Cable logging system 0.00 0.00 0.00
How many miles of classified road construction will be required? 0.00 0.00 0.00 0.00 0.00     0.00 0.00 0.00 Ground based logging 0.00 0.00 0.00
How many miles of classified road must be reconstructed? 0.00 0.00 0.00 0.00 0.60     0.60 0.60 0.00 Total MMBF 0.00 0.00 0.00
How many miles of temporary  road construction will be required? 0.00 2.50 0.10 0.00 1.00     3.60 3.60 0.00
WASATCH-CACHE
Total planned offered within IRAs MMBF 0.00 0.00 3.50 0.00 0.00 3.50     3.00 0.50 Helicopter 0.00 0.00 0.00
Of the above, how much requires road (re)construction (MMBF)? 0.00 0.00 2.50 0.00 0.00   2.50   2.50 0.00 Cable logging system 0.00 0.00 0.00
How many miles of classified road construction will be required? 0.00 0.00 1.50 0.00 0.00     1.50 1.40 0.10 Ground based logging 0.50 0.00 0.50
How many miles of classified road must be reconstructed? 0.00 0.00 1.00 0.00 0.00     1.00 0.00 1.00 Total MMBF 0.50 0.00 0.50
How many miles of temporary  road construction will be required? 0.00 0.00 2.00 0.00 0.00     2.00 1.50 0.50