State: Wisconsin | | | | | | | | | | | |
Timber Volumes Planned for Offer within Inventoried Roadless Areas (IRAs). Note: Total Timber Volume includes salvage and biomass. | | |
The following table summarizes, by fiscal year TIMBER VOLUMES PLANNED FOR OFFER within Inventoried Roadless Areas. The following abbreviations are used: FY = Fiscal Year, MMBF = Million Board Feet | | List total planned MMBF and road miles for unroaded and roaded portions of IRAs | | Planned offer in unroaded portion of IRA that does not require road construction or reconstruction by sale type and logging system |
Timber Harvest Volume | FY '00 | FY '01 | FY '02 | FY '03 | FY '04 | Total Planned thru FY '04 | Possible Reduction thru FY '04 | Total Road Mileage | | Unroaded IRA portion totals | Roaded IRA portion totals | | | Stewardship sale MMBF | Commodity sale MMBF | Sub total MMBF |
WISCONSIN | | | |
Total planned offered within IRAs MMBF | 3.86 | 9.90 | 3.24 | 3.00 | 4.10 | 24.10 | | | | 16.30 | 7.80 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 3.86 | 5.00 | 0.85 | 0.00 | 0.00 | | 9.71 | | | 5.83 | 3.88 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.20 | 0.00 | 0.00 | | | 0.20 | | 0.10 | 0.10 | | Ground based logging | 5.47 | 5.00 | 10.47 |
How many miles of classified road must be reconstructed? | 0.00 | 3.70 | 1.70 | 0.00 | 0.00 | | | 5.40 | | 2.00 | 3.40 | | Total MMBF | 5.47 | 5.00 | 10.47 |
How many miles of temporary road construction will be required? | 3.40 | 2.65 | 0.00 | 0.50 | 0.00 | | | 6.55 | | 3.94 | 2.61 | | |
CHEQUAMEGON-NICOLET | | | |
Total planned offered within IRAs MMBF | 3.86 | 9.90 | 3.24 | 3.00 | 4.10 | 24.10 | | | | 16.30 | 7.80 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 3.86 | 5.00 | 0.85 | 0.00 | 0.00 | | 9.71 | | | 5.83 | 3.88 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.20 | 0.00 | 0.00 | | | 0.20 | | 0.10 | 0.10 | | Ground based logging | 5.47 | 5.00 | 10.47 |
How many miles of classified road must be reconstructed? | 0.00 | 3.70 | 1.70 | 0.00 | 0.00 | | | 5.40 | | 2.00 | 3.40 | | Total MMBF | 5.47 | 5.00 | 10.47 |
How many miles of temporary road construction will be required? | 3.40 | 2.65 | 0.00 | 0.50 | 0.00 | | | 6.55 | | 3.94 | 2.61 | | |
| | |
| | | | | | | | | | | | | | | | |