State: Wyoming | | | | | | | | | | | |
Timber Volumes Planned for Offer within Inventoried Roadless Areas (IRAs). Note: Total Timber Volume includes salvage and biomass. | | |
The following table summarizes, by fiscal year TIMBER VOLUMES PLANNED FOR OFFER within Inventoried Roadless Areas. The following abbreviations are used: FY = Fiscal Year, MMBF = Million Board Feet | | List total planned MMBF and road miles for unroaded and roaded portions of IRAs | | Planned offer in unroaded portion of IRA that does not require road construction or reconstruction by sale type and logging system |
Timber Harvest Volume | FY '00 | FY '01 | FY '02 | FY '03 | FY '04 | Total Planned thru FY '04 | Possible Reduction thru FY '04 | Total Road Mileage | | Unroaded IRA portion totals | Roaded IRA portion totals | | | Stewardship sale MMBF | Commodity sale MMBF | Sub total MMBF |
WYOMING | | | |
Total planned offered within IRAs MMBF | 1.81 | 0.60 | 13.30 | 2.50 | 8.50 | 26.71 | | | | 16.06 | 10.65 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 1.75 | 0.60 | 8.30 | 2.00 | 8.30 | | 20.95 | | | 14.80 | 6.15 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 3.20 | 1.00 | 2.00 | 1.00 | 6.70 | | | 13.90 | | 13.70 | 0.20 | | Ground based logging | 0.04 | 1.22 | 1.26 |
How many miles of classified road must be reconstructed? | 0.40 | 0.10 | 7.80 | 1.50 | 9.70 | | | 19.50 | | 13.70 | 5.80 | | Total MMBF | 0.04 | 1.22 | 1.26 |
How many miles of temporary road construction will be required? | 0.70 | 0.50 | 2.90 | 0.70 | 2.40 | | | 7.20 | | 4.50 | 2.70 | | |
BIGHORN | | | |
Total planned offered within IRAs MMBF | 0.06 | 0.00 | 0.00 | 0.00 | 3.00 | 3.06 | | | | 3.06 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 2.80 | | 2.80 | | | 2.80 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 2.70 | | | 2.70 | | 2.70 | 0.00 | | Ground based logging | 0.04 | 0.22 | 0.26 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 7.70 | | | 7.70 | | 7.70 | 0.00 | | Total MMBF | 0.04 | 0.22 | 0.26 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 1.00 | | | 1.00 | | 1.00 | 0.00 | | |
BLACK HILLS | | | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | 0.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
MEDICINE BOW-ROUTT | | | | | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 10.00 | 0.00 | 0.00 | 10.00 | | | | 0.00 | 10.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 5.00 | 0.00 | 0.00 | | 5.00 | | | 0.00 | 5.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 5.00 | 0.00 | 0.00 | | | 5.00 | | 0.00 | 5.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 2.00 | 0.00 | 0.00 | | | 2.00 | | 0.00 | 2.00 | | |
SHOSHONE | |
Total planned offered within IRAs MMBF | 0.75 | 0.10 | 2.80 | 2.00 | 5.00 | 10.65 | | | | 10.00 | 0.65 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.75 | 0.10 | 2.80 | 1.50 | 5.00 | | 10.15 | | | 9.00 | 1.15 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 2.20 | 0.00 | 1.00 | 0.00 | 3.00 | | | 6.20 | | 6.00 | 0.20 | | Ground based logging | 0.00 | 1.00 | 1.00 |
How many miles of classified road must be reconstructed? | 0.40 | 0.10 | 2.80 | 1.50 | 2.00 | | | 6.80 | | 6.00 | 0.80 | | Total MMBF | 0.00 | 1.00 | 1.00 |
How many miles of temporary road construction will be required? | 0.20 | 0.00 | 0.40 | 0.20 | 0.90 | | | 1.70 | | 1.00 | 0.70 | | |
ASHLEY | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | 0.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
BRIDGER-TETON | |
Total planned offered within IRAs MMBF | 1.00 | 0.50 | 0.50 | 0.50 | 0.50 | 3.00 | | | | 3.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 1.00 | 0.50 | 0.50 | 0.50 | 0.50 | | 3.00 | | | 3.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 1.00 | 1.00 | 1.00 | 1.00 | 1.00 | | | 5.00 | | 5.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.50 | 0.50 | 0.50 | 0.50 | 0.50 | | | 2.50 | | 2.50 | 0.00 | | |
CARIBOU | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | 0.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
TARGHEE | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | 0.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
WASATCH-CACHE | |
Total planned offered within IRAs MMBF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | | 0.00 | 0.00 | | Helicopter | 0.00 | 0.00 | 0.00 |
Of the above, how much requires road (re)construction (MMBF)? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | 0.00 | | | 0.00 | 0.00 | | Cable logging system | 0.00 | 0.00 | 0.00 |
How many miles of classified road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Ground based logging | 0.00 | 0.00 | 0.00 |
How many miles of classified road must be reconstructed? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | Total MMBF | 0.00 | 0.00 | 0.00 |
How many miles of temporary road construction will be required? | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | | | 0.00 | | 0.00 | 0.00 | | |
|
| | | | | | | | | | | | | | | | |