Closed for construction Baño de Oro Trail • Vereda Baño de Oro bajo construcción
Alert
Date(s): Jul 20, 2023
On July 10, construction will begin on Baño de Oro trail, located on the PR191 recreational corridor, in Río Grande. This trail was damaged by past storms and will have the damaged asphalt removed and trail repaired and filled with a new stone base. The work will last about 20 days. During this period the trail will remain closed to visitors for safety reasons.
This project is part of the Emergency Relief for Federally Owned Roads (ERFO) program, which is making repairs to roads affected by Hurricane Maria.
---
A partir del 10 de julio de 2023, comenzarán los trabajos de construcción en la vereda Baño de Oro, ubicada en el corredor recreativo de la PR191, en Río Grande. Las obras se extenderán alrededor de 20 días, en los que se eliminará el asfalto dañado del sendero y se rellenará con una nueva base de piedra. Durante este periodo, el sendero, que ha sido deteriorado por las recientes tormentas, permanecerá cerrado a los visitantes por motivos de seguridad.
Este proyecto es parte del programa de Alivio de Emergencia de Carreteras de Propiedad Federal (ERFO, en inglés), que realiza reparaciones en las vías afectadas por el huracán María.