Uinta National Forest Revised Forest Plan

Uinta National Forest Plan and Environmental Impact Statement

2003 Forest Plan and Final Environmental Impact Statement, May 2003. Includes Record of Decision (.pdf - 117 Kb). Version 5.0 or newer of Acrobat Reader may be necessary to view these files.


Forest Plan Amendments

1.  Winter Motorized Use Forest Plan Amendment and Travel Management, August 2007

2.  Wild and Scenic River Suitability Study for National Forest Sytem Lands in Utah, November 2008

3. Western Wide Energy Corridor

4.  Uinta Oil and Gas Leasing

5. Forest Plan Monitoring Realignment

 

 

 

 

 


Updates
Proposed update due to acquired land and law changes

 

Corrections to the Uinta National Forest Revised Forest Plan

  • Correction No. 1:  Standard ROS-2 (November 2004)
  • Correction No. 2:  Rangeland Capability Water Criterion, FEIS Appendix B-50 (November 2006)
  • Correction No. 3:  Standard M&E-10 regarding withdrawal of developed recreation and administrative sites from locatable mineral entry (November 2006)
  • Correction No. 4:  Guidelines WL&F-6 and Veg-7, Table 3-4, and Standard Graze-4 regarding dates for sage grouse (November 2006)
  • Correction No. 5:  Objective 3-2 regarding timber sale quantities (November 2006)
  • Correction No. 6:  Standard Timber-15 regarding timber harvest opening size (June 2010)
  • Correction No. 7:  Riparian Habitat Conservation Areas, Appendix D, Table D-1 (September 2010)
  • Correction No. 8:  Oil and Gas Leases (Amendment No.4) March 2012
  • Correction No. 9:  Table D-1 RHCA criteria corrected and Guideling Timber-14"

Winter Motorized Vehicle Use Opportunities

The Travel Management Rule (TMR) of 2005 required each Forest Service unit to designate roads, trails and area open to motor vehicle use.


Forest Plan Monitoring