Notice: The Forest Service is accepting public comments on the Spirit Lake Outflow Safety Improvement Project during the scoping process from September 30 to November 15, 2024. Submit comments or objections and learn more about the project here.  

The Gifford Pinchot National Forest is responsible for operating, maintaining, and repairing the 1.6 mile Spirit Lake tunnel and the engineered channels at Castle and Coldwater Lakes. Constructed in 1985, the tunnel provides the only outflow for Spirit Lake. To address annual tunnel operation in this dynamic volcanic landscape and to contribute to geologic hazard risk reduction to downstream communities, the Forest Service works with federal, state, and local partners.

The Forest Service is currently developing a collaborative strategy to create more sustainable and safer options for long term management of Spirit Lake Outflow to achieve ecological, economic and public safety needs.

Sign up for email updates on the Spirit Lake Outflow Project

  • Current System

    A placeholder image

    Learn about the Spirit Lake outflow tunnel that was built for public safety after the Mount St. Helens eruption in 1980.

  • Intake Gate Replacement & Geotechnical Drilling

    A placeholder image

    Intake gate replacement work is underway and is anticipated to continue through 2027. Geotechnical drilling is tentatively scheduled to begin in 2025.

  • Spirit Lake Outflow Safety Improvement Project

    View of Spirit Lake with a mountain range in background

    Gifford Pinchot National Forest is conducting stakeholder engagement and environemntal analysis to identify a long-term Spirit Lake outflow solution.

  • Science, Maps, Data

    A placeholder image

    Review current scientific reports, data, and information about proposed scientific studies at Mount St Helens. Review background studies and the current decision frameworks.

  • Multimedia

    A placeholder image

    Browse Spirit Lake Outflow Safety Improvement Project photos.