Basic Form for Web Viewing
| Facility Condition Assessment Form - Basic Buildings |
| Unit:_________________________________(RRFFDD) |
| Site Name:____________________________________ |
Bldg. Cat.:___________________________ |
Inspector Name:__________________________________ |
Entered During Inspection |
| Bldg ID #:_____________________________________ |
Bldg. Sub Cat:_______________________ |
Inspection Date:__________________________________ |
Entered During Inspection |
| Bldg Name:___________________________________ |
Maint Level: _________________________ |
Estimated Travel Time (Hours): _____________________ |
Entered During Inspection |
| Size (GSF):___________________________________ |
Date of Last Inspection: _______________ |
|
|
| CRV: ________________________________________ |
Historic Status: ______________________ |
|
|
| Year Constructed: _____________________________ |
Master Plan: ________________________ |
|
|
| Real Property Inventory Required: Yes/No |
| Work Item # |
1st Level |
Work Items |
Typical Life Cycle (Yrs) |
Measurements |
|
|
Cost Factors |
Maintenance Cost |
Reason 1 -Resource 2 -Mission 3 - H&S |
Date Needed (mm/dd/yyyy) |
Critical (If yes, check box) |
| |
Quantity |
Units |
Cost/unit |
|
|
|
|
|
| 01001 |
Other |
Building Replacement, Complete |
N/A |
|
LS |
|
|
|
|
|
|
| 02001 |
Site Improvements |
Parking Lot, Repair and Seal Coating |
5 |
|
10 MSF |
|
|
|
|
|
|
| 02002 |
Site Improvements |
Parking Lot, Repair and Resurface: |
10 |
|
MSF |
|
|
|
|
|
|
| 02003 |
Site Improvements |
Concrete, Sidewalk or Curb, Remove/Replace |
25 |
|
LF |
|
|
|
|
|
|
| 03001 |
Foundation |
Concrete Slab or Stem Wall, Minor Repair Spalls & Cracks |
15 |
|
SF |
|
|
|
|
|
|
| 04001 |
Roofing |
Basic Roof, Fiberglass Shingles, Removal and Replacement |
20 |
|
SQ |
|
|
|
|
|
|
| 04002 |
Roofing |
Premium Roof, Metal/Membrane/Shakes, Removal and Replacement |
30 |
|
SQ |
|
|
|
|
|
|
| 04003 |
Roofing |
Skylight, Remove/Replace |
30 |
|
EA |
|
|
|
|
|
|
| 04004 |
Roofing |
Gutters/Downspouts, Remove/Replace |
15 |
|
LF |
|
|
|
|
|
|
| 05001 |
Superstructure |
Steps, Exterior, Remove/Replace |
20 |
|
STEP, EA |
|
|
|
|
|
|
| 06001 |
Exterior Closure |
Siding, All Types, Remove/Replace |
25 |
|
CSF |
|
|
|
|
|
|
| 06002 |
Exterior Closure |
Door, Exterior, Remove/Replace |
20 |
|
EA |
|
|
|
|
|
|
| 06003 |
Exterior Closure |
Door, Garage, Overhead Door, Remove/Replace |
20 |
|
EA |
|
|
|
|
|
|
| 06004 |
Exterior Closure |
Painting, Exterior, Includes prep, prime and on coat paint |
5 |
|
SF |
|
|
|
|
|
|
| 07006 |
Interior Construction |
Window, Remove/Replace |
30 |
|
EA |
|
|
|
|
|
|
| 09001 |
Interior Finishes |
Painting, Interior Walls/Ceiling, Includes prep, prime, one coat paint |
5 |
|
SF |
|
|
|
|
|
|
|