The Southern California Edison Co. is proposing to replace 385 wood poles with light weight steel poles; replace, remove and install 200 anchors and down guys; and re-conductor the overhead 33kV line along the Doble Circuit.
Location Summary
The proposed project is located west of Highway 18 in Lucerne Valley between the Cottonwood substation to the north and the Gold Hill substation to the south, in San Bernardino County, California.
District: Big Bear Ranger District
Project Documents
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool. Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public