Winter Sports Road Electric Line Burial

RSS FeedSubscribe to this feed

This is a proposal by Clark Electric Cooperative to convert about 4 1/4 miles of overhead electric line to underground electric wires within their existing utility corridor in order to provide a safer and more reliable electric service.

Location Summary

Project is located in the Town of Grover (T32N, R2W) along Winter Sports Road (FR 119)starting at Spruce Lake Road going north to Beaver Creek Road (FR 121) and then a short distance east.

District: Medford-Park Falls Ranger District