Revised Duchesne Roosevelt District Wide Range Improvement Project

RSS FeedSubscribe to this feed

The Ashley NF proposes to modify the Sowers Canyon portion of the Duchesne Roosevelt District Wide Range Improvement Project. The project includes an additional 4 miles pipeline, 5 additional trough locations and two 10,000 gal storage tanks.

Location Summary

The project location is approximately 25 miles Southwest of Duchesne, Utah

District: Roosevelt Ranger District

Project Documents

Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool. Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public

https://www.fs.usda.gov/project/?project=56463&exp=overview
https://www.fs.usda.gov/project/?project=56463&exp=overview