Holy Cross Energy (HCE) Avon-to-Gilman Electric (115-kV) Transmission Line
Holy Cross Electric Association, Inc.,(HCE) proposes to construct a new 115-kV transmission line between the existing Gilman and Avon Substations. The proposed route is 8.9 miles and would cross approximately 3.4 miles of National Forest System Lands
Location Summary
The right-of-way would run southeasterly from the substation in the Avon / Eagle-Vail area, through the town of Minturn, and terminate at the substation just above Gilman.
District: East Zone/Holy Cross Ranger District
Project Milestones
Milestone | Date |
---|---|
Scoping Start | 11/19/2019 |
Comment Period | 09/03/2021 |
Objection Period Start | 11/01/2024 (Estimated) |
Decision | 02/01/2025 (Estimated) |
Implementation | 06/01/2025 (Estimated) |
Project Documents
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public