Replacement chair lift in the same alignment as the existing Chair 2. Chair 2 replacement lift would begin in the same location as existing Chair 2.
Location Summary
Township 21N, Range 19E., W.M. section 26
District: Wenatchee River Ranger District
Project Documents
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool. Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public