U. S. Geological Survey (USGS) Monitoring Project

RSS FeedSubscribe to this feed

USGS is requesting an amendment to their existing special use permit to include installation of equipment to monitor surface flow (runoff) downslope of the Canyon Mine. Up to 5 water-detection instruments and 1 game camera will be deployed.

Location Summary

The project will occur downslope from the Canyon Mine uranium mine. In the area downslope from Canyon Mine identified as being most likely to experience runoff.

District: Tusayan Ranger District

Project Documents

Please click on the tabs below to navigate to additional documents.

https://www.fs.usda.gov/project/?project=58227
https://www.fs.usda.gov/project/?project=58227