Bridge Bay Resort Storm Water Filtration System Installation

RSS FeedSubscribe to this feed

Authorize installation of storm water filtration system, including a 4 feet deep x 5 feet wide x 40 feet long filtration basin, at Bridge Bay Resort in location where storm water discharges to Shasta Lake from the south boat ramp paved parking lot.

Location Summary

Shasta Unit of the Whiskeytown-Shasta-Trinity National Recreation Ares. Bridge Bay Resort, 10300 Bridge Bay Road, Redding, CA

District: Shasta Lake Ranger District

Project Documents

Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool. Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public

https://www.fs.usda.gov/project/?project=59312