Grassland Projects are proposed actions that are analyzed thought the NEPA process (Environmental Impact Statement [EIS], Environmental Analysis [EA], or Categorical Exclusion [CE]) that involve analyzing different alternatives to the proposed action requires public notice and comment, and result in a NEPA decision such as a Record of Decision (ROD), Decision Notice (DN), or a Decision Memo (DM) which is subject to an administrative appeals process, and ultimately is implemented on the ground.

 

Dakota Prairie Grasslands Project Archive

  • 021 Allotment Range Water Project

    water pipeline and 3 stock tanks; and a cross fence

  • 2014 Crested Wheatgrass Utilization and Range Infrastructure Projects

    Construction and use of temporary or permanent fence to create crested wheatgrass pastures. Install two pipelines and tanks. Re-route existing fences. Authorize changes to grazing rotations.

  • 2016 Hay Permit

    Haying on 27 acres of Allotment 045 for the purpose of removing stagnant, non-productive grasses which are affecting production of vegetation. Project canceled due to hay crop ruined by storm.

  • 2020 Range Improvement Projects

    McKenzie Ranger District is seeking public comment on proposed range improvements to be installed on National Grasslands in McKenzie County. These projects include fencing, pipelines, and water tanks.

  • 2021 Range Improvement Projects-Pasture 7, ADP 424 and ADP 510

    McKenzie County Grazing Association has proposed range improvements to be installed on National Forest System lands in McKenzie County. The projects include pipelines, water well drilling, and water tanks.

  • 2023 Pasture 15 GGG Range Improvement Project: MCGA-23-7 Range Water Pipeline, Tanks, and Bore

    The McKenzie Ranger District and McKenzie County Grazing Association propose to install range improvement projects on National Forest System Lands in Pasture 15, McKenzie County, North Dakota.

  • 2023 Pasture 15 GGG Range Improvement Projects: GGG 29, 30, & 37 Range Water Pipelines and Tanks

    The McKenzie Ranger District and McKenzie County Grazing Association propose to install water pipelines and tanks on National Forest System Lands in Pasture 15, McKenzie County, North Dakota.

  • 386 Headquarters Pipeline

    This project will approve the installation of one range water pipeline across the McKenzie Ranger District. The pipeline is 5023 feet in length. This project will include a pipeline a stock tank and reclamation of the contaminated well.

  • A051 Livestock Crossing

    A051 Hardened Livestock Crossing

  • A103X Flowline Replacement

    The existing CMNU A103X flowline will be replaced. The project entails burying a 3-inch spooled fiberspar line for approximately 3,960 feet. It would be constructed within a 30 foot wide right-of-way that follows an existing road corridor.

  • A189 Range Water Pipeline

    Construction of a water pipeline

  • Abandoned Water Well Plugging

    Abandoned water wells will be reclaimed. Reclaiming involves plugging the well bores with concrete and removing any surface structures associated with the well, such as an old windmill, piping, etc.

  • Abraxas Petroleum Corporation Yellowstone NW Central Multi-Well Pad

    Abraxas proposes to construct a multi-well pad (MWP) consisting of seven wells, referred to as the Yellowstone NW Central MWP.

  • Allotment #108 Livestock Pipelines and Tanks Project

    Install two pipelines(one for 1.2 miles and the other for .25 mile) and three tanks

  • Allotment #110

    Install a .75-mile pipeline and two tanks

  • Allotment #170 Pipeline

    Extend water pipelines and install a stock tank.

  • Allotment #266 Range Water Extension

    Construction of a water pipeline and addition of a stock tank.

  • Allotment #270 Water Well

    Construction of a water well including a water line and an electrical line.

  • Allotment 021 Replacement Water Well

    Replacing non-functional water well with new well

  • Allotment 021 Water Pipeline and Stock Tank

    10 miles NE of Amidon, ND

  • Allotment 023 Water Pipeline and Stock Tank

    Livestock water tank and pipeline - remove dugout

  • Allotment 037 Pipeline Extension and Stock Tank

    Attach pipeline to existing well and add a livestock tank due to poor quality water in dam

  • Allotment 037 Range Water Project

    Install a solar water well and stock tank

  • Allotment 046 Stock Tank

    Put tank on existing pipeline and take out dam

  • Allotment 048 Range Water Development

    Drill a range water well and install a range water livestock tank, with an alternate 4,300 feet range water pipeline instead of well to connect livestock tank with existing water source.

  • Allotment 049 Water Pipeline and Stock Tank

    Livestock water tank and pipeline and remove dam

  • Allotment 051 Fence Range Improvement Project

    install a new fence in the NENE of Section 3, T135N, 102W, trending south and ending in SWSW of Section 2

  • Allotment 051 Solar Well and Water System

    The Medora Ranger District has received a proposal to drill a solar powered well, install a storage tank, short pipeline, and a new stock tank in Slope County, North Dakota.

  • Allotment 054 Range Water Pipeline and Stock Tank

    Proposed range water pipeline and livestock tank system to support livestock grazing in Allotment 054 in Slope County, ND.

  • Allotment 059 Water System and Water Lot

    The Medora Ranger District received a proposal to drill a range water well with a solar-powered pump and install a stock tank. A water lot would be built around the well and stock tank to allow cattle from pastures 001, 002 and 003 access to water.

  • Allotment 059 Water System, Water Lot, and Dam Reclaim

    Allotment 059 Water System

  • Allotment 061 Water System Range Improvement Project

    A proposed water system: 2 pipelines, new well, 3 stock tanks

  • Allotment 066 Replacement Range Water Developments

    Move and install livestock tanks to replace reservoirs and dugouts that have been unusable due to poor water quality.

  • Allotment 067 Replacement Range Water Development

    Install a buried range water pipeline connected to an existing water source, and install two range water livestock tanks. After complete, will rehabilitate reservoir.

  • Allotment 076 Range Water Pipeline and Stock Tank

    Proposed range water pipeline and livestock tank system to support livestock grazing in Allotment 076 in Slope County, ND.

  • Allotment 093 Water System and Dam Reclaim

    Range Water System improvements allotment 093

  • Allotment 097

    Allotment 097 Water Pipeline

  • Allotment 097 Range Water System

    Little Missouri Grazing Association proposes to construct a range water pipeline system in Slope County, North Dakota.

  • Allotment 100 Water Well and Tank

    A well will be drilled and a solar-powered pump will be set up. A covered stock tank will be installed. An existing well will be plugged and a windmill and tank will be removed.

  • Allotment 100 Well and Stock Tank

    Medora Ranger District received a proposal to drill a range water well with a solar-powered pump and install a covered stock tank in Slope County, North Dakota.

  • Allotment 106 water system and fence

    A proposed water system and fence to support livestock grazing within Allotment 106 to allow for better grazing rotation and utilization within the allotment.

  • Allotment 128 Pipeline Extension and Stock Tank

    Livestock Water Pipeline and Stock Tank

  • Allotment 146 Range Fence Project

    Approximately 1 mile of fence construction in Allotment 146 to improve cattle rotation

  • Allotment 152 Range Water Pipeline and Stock Tank

    Proposed range water pipeline system to support livestock grazing in Allotment 152 in Billings County, ND.

  • Allotment 153 Power Installation Project

    Installation of electrical power installation to support livestock grazing in Allotment 153 in Golden Valley County, ND.

  • Allotment 166 Range Water System

    Eight pipelines, ten stock tanks, and one well

  • Allotment 169 Water System

    Allotment 169 Water Redrill

  • Allotment 170 Water System

    solar powered well, pipeline, 4 stock tanks

  • Allotment 173 Range Water System

    Range water system proposed to include a storage tank, three stock tanks and a pipeline connected to an existing well

  • Allotment 174 Water System

    Construct water well and pipeline

  • ALLOTMENT 176 RANGE IMPROVEMENT (WATER) PROJECT

    Water pipeline extension and stock tank addition

  • Allotment 180 Range Water Project

    Water pipeline replacement

  • Allotment 182 Range Water Pipeline and Stock Tanks

    Installation of range water pipeline and stock tanks in Golden Valley County, ND.

  • Allotment 188s/189 Range Water System

    Proposed project would install a pipeline from an existing system and two new stock tanks

  • Allotment 196 Range Water System

    Range Water System

  • Allotment 197 Range Water System

    Medora Grazing Association proposes to install a pitless pump system in Billings County, North Dakota.

  • Allotment 197 Water Pipeline

    Medora Grazing Association proposes to install water pipelines to 5 pastures.

  • Allotment 197 Water System

    Allotment 197 Water Pipeline System

  • Allotment 197 Water System

    Water pipeline and tank

  • Allotment 201 Range Water Project

    One pipeline, 3 stock tanks

  • Allotment 204 Water System

    Water pipeline re-route and stock tank installation.

  • Allotment 206 Bock Dam Fence

    Removal and replacement of existing fence for maintenance purposes and wetlands protection.

  • Allotment 233 Range Water Development

    Installing a buried range water pipeline, connecting to an existing water source, and installing a range water livestock tank.

  • Allotment 258 Replacement Water Well

    Replace a non-functional water well

  • Allotment 267 Range Water Project

    A new solar-powered well, two pipelines, and 4 stock tanks

  • Allotment 268 Range Water Development

    Drill a range water well, install a buried range water pipeline, and install two range water livestock tanks.

  • Allotment 270 Fence Project

    The proposed fence would allow for better grazing rotation and utilization of the allotment.

  • Allotment 271 Replacement Range Water Developments

    Install a water pipeline and replace two livestock water tanks with one new tank.

  • Allotment 279 Range Water System

    The project would install 1750 feet of pipeline and a stock tank on Allotment 279

  • Allotment 279/280 Range Water Project

    Install approximately 5900 feet of pipeline and 3 stock tanks

  • Allotment 291 Livestock Pipeline Extension

    Extend a pipeline from private land and replace two existing tanks that were fed by a non-functional spring development

  • Allotment 325 Cross Fence

    The Horse Creek Cooperative Grazing Association has proposed a cross fence to support livestock grazing within Allotment 325 on the Medora Ranger District in Golden Valley and Slope Counties, North Dakota.

  • Allotment 325 Pipeline Project (Pasture 03B)

    New water pipeline and stock tank

  • Allotment 325 Range Improvements

    The Horse Creek Cooperative Grazing Association has proposed to construct two additional range water pipelines with stock tanks coming off of the well located in the NE 1/4 NW 1/4 of Section 2, T134N, R106W.

  • Allotment 325 Water Pipelines (Pastures 01N and 02B)

    Water Pipelines and Crossfence

  • Allotment 361 Fence Line Project

    The project would remove an existing cross fence and construct a 13,700-foot cross fence within Pasture 3 - Allotment 3 (ADP 361).

  • Allotment 372 Fence Line Project

    The project would construct a fence line along County Road 38 in Sections 23, T147N, R103W. Construction includes the installation of a 7,150 foot fence line.

  • Allotment 51 Water System Project

    This project will have a well installed with a solar-powered pump, a storage tank, and a stock tank. A two-foot line connecting the tanks will be buried. A fence will enclose the area of the well and tanks. An old spring will be removed an reclaimed.

  • Allotment 513 Relocating Range Water Developments

    Relocating two existing stock tanks and rerouting approximately 9,000 feet of range water pipeline to an accessible route in allotment 513 of pasture 9

  • Allotments 152 & 202 Water System Range Improvement Projects

    Allotment 152: install 2 range water lines and 3 stock tanks; Allotment 202: install range water line and 2 stock tanks

  • Allotments 164, 187, 198 & 212 Range Improvement Projects

    Allotment 164- range water pipeline and stock tank; Allotment 187- range water pipeline and stock tank; Allotment 198- range water pipeline and 2 stock tanks; Allotment 212- range water pipeline, stock tank, and water lot

  • Antelope 3D Seismic Project

    The Forest Service has received a Notice of Intent from Hess Corporation to conduct oil and gas geophysical data gathering on 2938 acres of National Forest Systems lands.

  • Antelope Master Development Plan

    Master Development plan would authorize agencies to approve ten well pad expansions or new pads and authorize 54 wells to facilitate development of federal and private minerals for Petro-Hunt, Continental Resources and Slawson Exploration Company.

  • Antelope Valley Station to Neset Transmission Project

    Basin Electric Power Cooperative proposes a 345-kV transmission line connecting the existing AVS, Charlie Creek, Williston and Neset substations and the newly proposed Judson and Tande substations. Part of the line crosses the McKenzie RD.

  • Audrey 3526 1H/2H/3H Surface Use Plans of Operations (SUPO's)

    NP Resources, LLC (NP) proposes to construct a single well pad, which would contain three well bores and related production facilities, and construct approximately 255 feet of new road for access onto the well pad.

  • Basin Electric Geotechnical Soil Investigations

    The geotechnical investigation would drill 12 boreholes with a max. borehole diameter of 6 in. and varying from 30-40 ft using an all-terrain rig with a footprint of approx. 210 sq feet. This investigation is needed to determine soil characteristics.

  • Basin Electric Power Cooperative Gap Substation Expansion

    The project consists of constructing two 17.4 MVAR capacitor banks on a roughly rectangular parcel immediately adjacent to the existing Gap Substation. The area permitted for the substation addition is approximately 4.40 acres.

  • BC Energy Flat Top Butte Federal 31-6H and Federal 146101-34-33H wells

    Development of two oil and gas wells

  • BC Energy Sand Creek Federal 4798 43-35H

    Oil and gas well and associated infrastructure

  • Belfield Fiber Optic Phase 2

    Medora Ranger District is proposing to amend an existing special use permit held by Consolidated to include an additional 33,906 feet of fiber optic line.

  • Belfield Fiber Optic Phase 3

    Consolidated Enterprises, Inc. is requesting a SUP amendment to include 31 miles of fiber optic line to provide high-speed internet to rural residents and businesses in Southwestern ND.

  • Belfield Fiber Optic Project

    Consolidated Enterprises, Inc. is proposing the installation of fiber optic cable to expand broadband services in Belfield, ND and Billings, Slope, and Stark Counties.

  • Belle Fourche Pipeline

    Maintenance repair to pipeline by replacing damaged pipe section

  • Black-tailed Prairie Dog Management Project Proposal

    Control of Prairie Dog colonies that encroach on private lands from Federal Lands

  • Bridger Pipeline LLC Crude Oil Pipeline Corridor

    Bridger Pipeline LLC proposes to construct a crude oil pipeline system to transport oil from Bridger's Baker/Sandstone Station near Plevna, MT to Bridger's Johnsons Corner Terminal located near Johnson's Corner, ND.

  • Bridger Pipeline LLC's Little Missouri Loop Pipeline

    Construct approximately 10 miles of 16-inch steel crude pipeline in various sections, T138-140N, R100-103W, Billings and Golden Valley counties, North Dakota.

  • Bridger Pipeline Special-use Application

    Install approximately 3,650 feet of 16-inch steel crude pipeline on National Forest System land in sections 33 and 34 of T140N, R100W.

  • Bridger Pipeline, L.L.C. crude oil gathering pipeline proposals.

    Two 8 inch steel crude oil gathering pipelines.One in Section 22, T148N, R98W, and one in Section 18, T148N, R100W, 5th PM, McKenzie County, North Dakota.

  • Broschat Engineering Road Reclamation

    Reclamation of 5,857 feet of National Forest System Road #734A by Broschat Engineering and Management Services

  • Buffalo Gap Trailhead

    Construction of a trailhead and corresponding spur trail at Buffalo Gap

  • Burlington Resources Aiden 21-25MBH

    The Forest Service proposes to approve the surface use associated with Burlington Resources exercising its Federal lease rights to drill, complete, and produce the proposed Aiden 21-25MBH oil well consistent with applicable requirements.

  • Burlington Resources Ora 21-25H

    The Forest Service proposes to approve surface use associated with Burlington Resources exercising its Federal lease rights to drill, complete, and produce the proposed oil well consistent with current laws and regulations.

  • Burlington Resources Phantom Ship 7 Multi-Well Pad

    Burlington Resources proposes to construct up to 7 oil and gas wells on one pad, including an access road and associated utilities.

  • Burlington Resources Rolla Maxima Multi-well Pad

    Burlington Resources proposes to construct up to 15 wells on one pad, including access roads and associated utilities

  • Burlington Stafford Multi-Well Pad

    Burlington proposes to construct one multi-well pad to drill five oil and gas wells in McKenzie County, North Dakota.

  • CCC Campground Reconstruction

    The proposal would realign campground infrastructure with outdoor recreation demand, accommodate and manage concentrations of use, and provide better access to adjacent wildlands and trail systems.

  • Cherry Creek

    XTO, Burlington and Slawson submitted proposals for new pad development and expansions of existing pads in the Cherry Creek Area. This proposal allows the companies to develop their federal minerals through the development of these wells.

  • Cherry Creek Water, Phase 2

    Cherry Creek Water, LLC proposes to construct a fresh water pipeline across National Forest System Lands.

  • Coal Creek Loop

    Construction of a spur trial near Coal Creek Campground. The Project is designed to connect the Survey Monument Trail to the Maah Dah Hey Trail.

  • Cobra Oil & Gas North Branch Saltwater Pipeline

    Cobra Oil and Gas proposes to construct a saltwater pipeline across National Forest System lands in McKenzie County, North Dakota.

  • Cobra Oil and Gas Haydraw Saltwater Pipeline

    Cobra Oil and Gas proposes to construct a saltwater pipeline across National Forest System lands in McKenzie County, North Dakota.

  • Consolidated Telecom Telephone Line Upgrading

    Construction, operation, and maintenance of approximately 40.13 miles of underground fiber optic cable to replace outdated existing cooper telephone line.

  • Continental Resouces, Inc. Buelingo 2-17H

    The Forest Service is proposing to approve necessary surface use associated with Continental Resources proposal to drill, complete, and produce an oil well on their Federal oil and gas lease consistent with current laws and regulations.

  • Continental Resources Harms 1-32H

    The Forest Service is proposing to approve necessary surface use associated with Continental Resources proposal to drill, complete, and produce an oil well on their Federal oil and gas lease consistent with current laws and regulations.

  • Continental Resources, Inc. Antelope 1-23H

    The Forest Service is proposing to approve necessary surface use associated with Continental Resources proposal to drill, complete, and produce an oil well on their Federal oil and gas lease consistent with current laws and regulations.

  • Continental Resources, Inc. Antelope 2-32H

    The Forest Service is proposing to approve necessary surface use associated with Continental Resources proposal to drill, complete, and produce an oil well on their Federal oil and gas lease consistent with current laws and regulations.

  • Continental Resources, Inc. Bob 1-22H Access Road and Utilities Special Use Permit

    Construction of an access road approximately 130 feet in length and 60 feet wide to the Bob 1-22H well.

  • Continental Resources, Inc. Buelingo 3-17H

    The Forest Service is proposing to approve necessary surface use associated with Continental Resources proposal to drill, complete, and produce an oil well on their Federal oil and gas lease consistent with current laws and regulations.

  • Continental Resources, Inc. Hereford 1-8AH

    The Forest Service is proposing to approve necessary surface use associated with Continental Resources proposal to drill, complete, and produce an oil well on their Federal oil and gas lease consistent with current laws and regulations.

  • Continental Resources, Inc. Hereford 2-8H

    The Forest Service is proposing to approve necessary surface use associated with Continental Resources proposal to drill, complete, and produce an oil well on their Federal oil and gas lease consistent with current laws and regulations.

  • ContinentalResources Inc Harms 2-32H

    The Forest Service proposes to approve the surface use associated with Continental Resources exercising it Federal lease rights to drill, complete, and produce an oil and gas well consistent with current law and regulations.

  • CP 049 Range Water System

    Addition of two water pipelines and two stock tanks to existing water system.

  • Dakota Prairie Grasslands Monitoring Plan Transition

    The DPG has begun a process to realign its LRMP with the 2012 Final Planning Rule (see: 36 Code of Federal Regulations 219). In particular, the DPG will address the purpose of the monitoring plan program set forth in 36 CFR 219.12(a)(1).

  • Dakota Prairie Grasslands Noxious Weed Treatment

    The DPG will analyze methods for treatment and control of noxious weeds across the unit.

  • Dakota Valley Electric

    Proposed to re-issue a special use permit to replace overhead electric lines with buried electric lines for distribution of electricity to rural electric services.

  • Dantz's Creek Juniper Project

    Juniper Removal from Dantz's Creek

  • Deep Creek Vegetation Management Project

    The Medora Ranger District proposes to authorize continued grazing and vegetation management under an adaptive management strategy on 20 allotments.

  • Denbury US 2-12 Well Salt Water Pipeline

    Salt water pipeline installation starting ath the US 2-12 well and running to an existing line on private property

  • DUPLICATE ENTRY: 2023 Pasture 15 GGG Range Improvement Project: MCGA-23-7 Range Water Pipeline, tank

    This is a duplicate entry. Correct project entry is project 64711.

  • DUPLICATE PROJECT TO #56531 - PLEASE DELETE

    White Horse Water is constructing a new 12 inch water line for freshwater fracking across NFS lands. The water line will provide fresh frack water to private land in Section 33, T148N, R101W.

  • East Sheyenne Vegetation Management Project

    The Sheyenne Ranger District is proposing to authorize continued grazing and vegetation management under an adaptive management strategy for 22 allotments and two general resource areas in accordance with land management plan direction.

  • East Yellowstone Trail NFSR 7901 Road Improvements

    This project proposes improvements to National Forest System Road 7901, also known as the East Yellowstone Trail. Improvements include grading and some horizontal and vertical realignment. The project would also increase the easement to Slope County.

  • Elkan South Fresh Water Pipeline Project

    Elkan, Inc. proposes to construct a 24 inch high density polyethylene fresh water pipeline across National Forest System lands.

  • Elkhorn Gravel Pit

    Development of private mineral gravel pit

  • Elkhorn Ranchlands LRMP Amendment

    Amend the 2002 Dakota Prairie Grasslands LRMP to include the acquired 5,100 acre Elkhorn Ranchlands and associated range allotments (18,000 additional NFS acres).

  • Enduro Operating LLC North Branch 2-32F Saltwater Transfer Line

    This project proposes to authorize a saltwater transfer line. It will transfer saltwater from the from the North Branch 22-35 water supply well to the North Branch 2-32F.

  • Fiscal Year 2014 Special Use Permit Reauthorizations

    The Forest Service proposes to authorize the continued use of National Forest System lands through the re-issuance of existing special use permits that have expired or will expire in fiscal year (FY) 2013 or 2014.

  • Fishing Docks/Piers

    Construct up to 2 ADA accessible fishing docks/piers at dam at Blacktail Trailhead.

  • Franks Creek Road Project

    Billings County is proposing roadwork to approximately 5.0 miles of NFSR #734 including areas of new alignment (construction), road reconstruction and reclamation of abandoned alignment.

  • GMX Resources Inc, Blacktail Federal 21-23-1H

    Oil well and associated lines

  • GMX Resources Inc. Lower Thirty Federal 21-4-1H

    Oil well and associated lines

  • GMX Resources, Inc. Charlie State 21-16-1H access road and utilities.

    Construction of approximately 3,514 feet of access road across National Forest System lands, and the installation of utilities along that access road, to the GMX Resources, Inc. Charlie State 21-16-1H well site.

  • Goldenwest Electric Installation of Buried Electric Line

    The U.S. Forest Service proposes to allow Goldenwest Electric Cooperative, Inc. to install 5,609 feet of 14.4 KV three phase buried electric line located on National Forest System (NFS)land Sec. 13, T140N, R103W in Billings County, state of ND.

  • Goldenwest Electric Lines Bell Lake Area

    Connect electric lines to various oil wells located along either side of NFSR#708

  • Goodnight Midstream Midway to Cleetwood Pipeline Project

    The Goodnight Midstream Midway to Cleetwood Pipeline Project would consist of installing 0.77 miles (4,050 feet) of 8-inch Star Fiberglass pipeline within a 20-foot right-of-way (4.6 acres) and will be buried to a depth of 60 inches on NFS lands.

  • Grand Electric and Moreau-Grand Electric Lines

    Bury electric lines in various locations on the Grand River National Grassland.

  • Grand Electric Underground Power Line 2017

    Grand Electric Cooperative would construct 4,000 feet of underground power line on the Grand River National Grassland in SW Section 8 and NW Section 17, T22N, R11E, Black Hills Meridian, Perkins County, South Dakota.

  • Grand River and Cedar River Adaptive Management Plan

    The project proposes to apply an adaptive management strategy using a variety of tools to effectively manage and restore rangelands managed by the District in accordance with land management plan direction.

  • Greater Sage-grouse Plan Land and Resource Management Plan Amendment

    Plan amendment to incorporate management direction for Greater sage-grouse habitat needs. For additional information on Sage-grouse Amendments in planning on other National Forests please see: http://www.fs.usda.gov/r4

  • Griggs County Telephone Fiber Optic Project

    Griggs County Telephone Company is requesting the Forest Service to issue an amendment to an existing Special Use Permit to install, operate and maintain a buried fiber optic cable within a segment of Richland County Road 23 right-of-way

  • Hanson Trail

    McKenzie Ranger District proposes to build a trail to the Hanson Overlook Interpretive site. The trail construction would include 113 feet of out sloped cut trail, 119 feet of gravel surfacing, and 5 sets of wooden stairs.

  • Hermann Land Exchange

    The proposed land exchange includes lands in Perkins County, South Dakota. The project would involve an exchange of approximately 40.00 acres of National Grasslands for 40.08 acres of private lands

  • Hiland Operating, L.L.C. Natural Gas Gathering Pipeline proposal.

    Burying a 10-inch poly pipeline along an existing pipeline corridor in Section 15, T.148N., R.98W., 5th PM, McKenzie County, North Dakota.

  • Insight Technologies Fiber Optic Line

    A SUP for 5 miles of fiber optic line installed in a 20-foot right-of-way, located in ND HWY 27 right-of-way

  • International Western Company water pumping facility and associated utilities

    The purpose for this facility is to distribute water for oil field exploration and development. Disturbance would be about 10.2 acres during construction but be about 0.3 acres for operation and maintenance following interim reclamation.

  • Jorgen's Hollow Campground

    This project proposes constructing a campground and associated structures for campers and horse camping as well as constructing a 4 mile long hiking trail at the east trailhead for the North Country Trail

  • Legacy Reserves Ramona Federal 21-6

    Installation of approximately 3800 feet of poly pipeline to transfer salt water from the Knutson Madison Unit to the Ramona Federal 21-6 injection well

  • Lind Freshwater Lay Flat Line

    The McKenzie Ranger District has received a special use application to install a 10 inch lay flat freshwater line across National Forest Service lands in McKenzie County, North Dakota.

  • Little Missouri National Grassland Prairie Dog Management Project

    The Forest Service is proposing a program of prairie dog management, including responding to unwanted encroachment onto non-National Forest System land and diverting colonies away from non-NFS land. Adaptive management will allow for future actions.

  • Livestock Grazing Record of Decision

    Final decision to fully implement the DPG LRMP with minor changes. See phased decision language in the 2002 LRMP ROD

  • Low water crossing repair on NFSR 852 and 852A

    The McKenzie Ranger District proposes to repair two low water crossings. The crossings are located on National Forest System Road (NFSR) 852 and 852A.

  • Maah Daah Hey Trail Extension

    Proposed extension of the Maah Daah Hey trail from Sully Creek State Park to the Burning Coal Vein campground.

  • Maah Daah Hey Trail Mile 125.5 and Mile 128 Reroutes

    The McKenzie Ranger District proposes to re-route two portions of the Maah Daah Hey National Recreation Trail to avoid high erosion areas.

  • Maah Daah Hey Trail North

    Maintenance and reroute of portion of the Maah Daah Hey Trail including 23,000 feet of trail restoration and 1,200 feet of trail realignment

  • Maah Daah Hey Trail Storm Reroute Project

    This project includes construction of 2,970 feet of new trail due to relocation of a portion of trail damaged by a landslide. The previous route will be abandoned.

  • MCGA-22-1 (Pasture 7-3, ADP 430) and MCGA-22-10 (Pasture 7-2, ADP 424) Range Improvement Projects

    McKenzie Ranger District is seeking public comment on proposed range improvements to be installed on National Grasslands in McKenzie County. These projects include fencing and range water wells, tanks, and pipelines. [

  • McKenzie County NFSR #829 (Long X) Road Reroute

    McKenzie County proposes to reroute approximately 3,200 feet of NFSR 829 in Section 10, T147N, R98W, 5th PM, McKenzie County, North Dakota.

  • McKenzie County Road 5 Bridge Replacement Project

    McKenzie County proposes to replace a current bridge on County Road 5 with a reinforced box culvert to meet design standards and provide safe and efficient public travel.

  • McKenzie County Rural Water Development IV, Part II

    McKenzie County proposes to install approximately 2 miles of buried fresh water pipeline across National Forest System lands as part of a larger rural water development project using State grant funding.

  • McKenzie County Rural Water Pipeline

    Construction of rural water pipeline by McKenzie County for approximately 11 miles.

  • McKenzie County Water Resource District (MCWRD) Spring Creek pipeline

    McKenzie County Water Resource District (MCWRD) proposes to construct approximately 11,695 feet of rural water pipeline to supply water to 10 users in southeastern McKenzie County.

  • McKenzie County Water Resource District Spring Creek Johnson Water Line

    McKenzie County Water Resource District proposes to install, operate, and maintain a high quality potable water pipeline in southeastern McKenzie County.

  • McKenzie County Water Resource District System IV, Part IV Southeast McKenzie County

    McKenzie County Water Resource District proposes to bury a potable water pipeline across National Forest System lands in southeastern McKenzie County, North Dakota.

  • McKenzie Electric Cooperative Grassy Butte Tie to Roughrider Project

    The purpose of this project is to install new 3-Phase underground cable (URD) and new 1-Phase URD for short alignments and boxes along the Beicegel Creek Road (County Road 50)within existing utility corridors.

  • McKenzie Electric Cooperative Hartman/Trotter/Carson Project

    MEC is proposing to build the single-phase underground power line. It would be energized to 14.4 kV and be approximately 5,710 feet in length. MEC would be granted a 20-foot Right of Way (2.6 acres)for construction, operations, and maintenance.

  • McKenzie Electric Cooperative Inc, N7-9 Exposed Cable Repair

    To replace an existing three-phase underground line that is exposed in a drainage and install a new cabinet on each side the drainage.

  • McKenzie Electric Cooperative Inc. Horse Creek/Winters Power Line

    McKenzie Electric Cooperative, Inc. proposes to bury a new power line in McKenzie County, North Dakota. The portion of the proposed underground power on National Forest System Lands could be approximately 1,312 feet in length.

  • McKenzie Electric Cooperative Skaar Rebuild Project

    McKenzie Electric Cooperative proposes to rebuild a section of existing overhead and buried power line in southwestern McKenzie County.

  • McKenzie Electric Cooperative Tobacco Gardens Buried Power Line

    McKenzie Electric Cooperative will replace existing and add new buried power line for approximately 3.5 miles.

  • McKenzie Electric Cooperative, Inc (MEC) Grassy Butte Transmission Line Upgrade Project.

    The Forest Service has received a proposal for the upgrade of approximately three miles of an existing 41.6kV transmission line across National Forest System Lands.

  • McKenzie Electric Cooperative, Inc Skaar North-Red Wing South Electric Line

    McKenzie Electric Cooperative, Inc. proposes to construct the Skaar North-Red Wing electric line in McKenzie County, North Dakota.

  • McKenzie Electric Cooperative, Inc. Horse Creek East & West New Build

    McKenzie Electric Cooperative, Inc. proposes to construct a buried electrical line across National Forest System lands in McKenzie County, North Dakota.

  • McKenzie Electric Cooperative, Inc. Horse Creek East & West Reroute New Build

    McKenzie Electric Cooperative, Inc. proposes to construct, operate, and maintain their proposed electric line.

  • McKenzie Electric Cooperative, Inc. Proposed Transmission Power Line Upgrade (Hay Butte to SquawGap)

    Upgrade an existing 69kV transmission line to 115kV. Replacement of the poles and wires. All construction would take place within the existing 50 foot wide ROW.

  • McKenzie Electric Cooperative, Inc. Sand Creek Project

    McKenzie Electric Cooperative, Inc. proposes to construct a buried electrical line across National Forest System lands in McKenzie County, North Dakota.

  • McKenzie Electric Cooperative, Inc. Silurian 9-1 and 18-1 Electrical System

    McKenzie Electric Cooperative, Inc. proposes to install approximately 5433 feet of three-phase, buried electric cable with associated above ground structures along NFSRs 883-1 and 885 to service Silurian's 9-1 and 18-1 locations.

  • McKenzie Electric Long X Electric Line

    McKenzie Electric Cooperative, Inc. proposes to construct, operate, and maintain a proposed three-phase electric line in SE McKenzie County, North Dakota.

  • McKenzie Electric Proposed Three Phase Underground Lines Upgrade Special Use Permit Project

    To issue a special use permit to McKenzie Electric for construction, operation and maintenance of 5,091 feet of three phase line along County Road 10 and 3,818 feet of three phase line along County Road 34.

  • McKenzie Electric, Inc. Pojorlie Kleeman New Electric Line

    McKenzie Electric Cooperative, Inc. proposes to construct the Pojorlie Kleeman electric line in McKenzie County, North Dakota.

  • McKenzie Energy Partners, LLC Foreman Butte Saltwater Pipeline Project

    McKenzie Energy Partners, LLC proposes to construct, operate, and maintain a saltwater pipeline across National Forest System Lands in the Foreman Butte area of McKenzie County, North Dakota.

  • McKenzie Ranger District Pastures 2, 10, 11 Allotment Management Plan Revisions

    Revise allotment management plans in 22 allotments within Pastures 2, 10 and 11 of the McKenzie Ranger District. This project is now subject to the recently published pre-decisional objection process described at 36 CFR 218.

  • McLeod Drain Project

    McLeod Drain project authorizes the continued use and maintenance of the existing drain as currently constructed crossing approximately 1/3 mile of National Forest System lands.

  • MDH Trail Reroute and Bear Creek Bridge Replacement

    Medora Ranger District proposes to construct a reroute on the Maah Dah Hey Trail near mile marker 19.5 that involves removing and relocating the Bear Creek Bridge

  • Medora Ponderosa Pine Thinning Project

    The project proposes to thin ponderosa pine stands in Slope County, ND to reduce fuels and retain the health of the residual stand of pines.

  • Medora South Trailhead

    Medora South Trailhead and Trails

  • Midstate Telephone Company Fiber Optic Lines

    Midstate Telephone Company seeks to replace approximately 20,000 feet of fiber optic telephone line, buried on National Forest System land, to increase telecommunication capacity needed to serve local communities

  • Midstate Telephone Replace 4,780 feet of Copper Cable with 5,670.02 Feet of Fiber Optic Cable

    Replace 4,780 feet of existing old copper telephone line with 5,670.02 feet of fiber optic line to upgrade service, provide internet capabilities to a private residence and allow for additional residential services if necessary

  • Mikes Creek Road Repair and County Easement Issuance

    The project proposes to reduce maintenance levels and complete road decommissioning on segments of National Forest System Road (NFSR) 702A in the Mikes Creek area. Road repair and maintenance would also be completed. An easement will be granted.

  • NE McKenzie Allotment Management Plan Revisions

    Update allotment management plans for pastures 12, 13 and 14.

  • Newfield Production Company Berg Federal 149-97-30-31- 1H, 2H, and 3H Road and Utlilities

    Forest Service proposes to issue a special use permit to Newfield Production Company, Inc to construct 3,131 feet of road and install pipelines & utilities on NFS land to provide access and service to a proposed oil well on private surface.

  • Newfield Production Company Pittsburgh Federal 153-96-3 Multi-Well Pad Expansion

    Newfield proposes to drill 3 oil and gas wells from the existing Pittsburgh 1-3H well pad. The proposal would take this well pad back to its original disturbed area to accommodate the addition of 3 oil and gas wells and related production facilities.

  • Newfield Production Company, Helsingborg Federal 153-96-27-22-4H MWP

    Newfield Production Company plans to drill four new oil and gas wells on the existing Sand Creek Federal 1-27HA well pad in order to exercise their right to develop federal oil and gas leases in accordance with the terms of the lease.

  • Newfield Sand Creek Federal 153-96-23-14-4H Oil and Gas Wells

    Newfield Production Company proposes to drill five oil and gas wells using an existing access road and well pad in McKenzie County, North Dakota.

  • NFSR #7692 Decommission

    Decommission .25 miles of road and restore back to natural contours

  • NFSR 779 Realignment

    Construction of approximately 2059 feet of road east of existing road and removal of approximately 2000 feet of the existing road to reduce impacts to wetlands and reduce issue with water overtopping the road.

  • North Billings County Range Allotment Management Plan Revision

    Proposal to continue grazing on 43 allotments in a manner consistent with direction in the DPG LRMP

  • North Country Trail Extension

    Build a trail segment in the northeast portion of the Sheyenne National Grasslands to connect to the Oak Leaf Trail and extend the North Country National Scenic Trail

  • North Range Resources, LLC Rough Rider Eagle 5-1V and 5-2V Surface Use Plan of Operations

    North Range Resources, LLC proposes to construct one well pad, utilities and access on the Little Missouri National Grassland to develop private mineral resources.

  • North Range Resources, LLC, Inc. Oil and Gas Well Project

    North Range proposes to construct four oil and gas well pads, with one well each, and associated access and buried utilities.

  • North Tracy Mountain Rocky Mountain Juniper Reduction Project

    A proposed treatment area of 1147 acres - that may include 1. tracked or wheeled masticators; 2. chainsaw, and pruners, or 3. prescribed fire

  • Northern Great Plains Management Plans Revision Supplemental EIS for Oil and Gas Leasing

    Supplemental EIS prepared to analyze the changed oil and gas development pattern on the Dakota Prairie Grasslands. This project will supplement the 2001 Northern Great Plains Management Plans Revision FEIS.

  • NP Resources Elkhorn Ranch and Roosevelt Oil and Gas Wells Project

    NP Resources, LLC has proposed three multi-well pads, the Elkhorn Ranch Federal 143-102-1-12H, Elkhorn Ranch Federal 143-102-2-11H,and the Roosevelt Federal 143-102-28-33H and the associated facilities and buried utilities in Billings County, ND.

  • NW Sheyenne Vegetation Management Project

    Revising allotment management plans and developing restoration projects.

  • Oneok 1,500 Feet of Pipeline to XTO Federal 44X-36BXC Well

    Construct approximately 1,500 feet of six-inch gas pipeline to connect to the XTO Federal 44X-36BXC well located on private land in Section 36, T144N, R 103W.

  • ONEOK ANDERSON BUTTE 11-17TFH

    6950' of 8" poly gas pipeline to connect the Anderson Butte 11-17THF to an existing line

  • Oneok Bakken Pipeline, L.L.C. Natural Gas Liquids Pipeline

    Construction of approximately 600 feet of 4.5 inch diameter steel natural gas pipeline from the Grasslands Gas Plant to the existing Garden Creek natural gas liquids pipeline.

  • Oneok Clear Creek Federal 1-26H Natural Gas Pipeline

    Forest Service proposes to issue a special use permit to Oneok Rockies Midstream LLC to bury a gas pipeline within an existing road/pipeline corridor to allow natural gas to be marketed from the Clear Creek Federal 1-26H oil and gas well.

  • Oneok Deep Creek Mid-Pressure Pipeline

    Oneok proposes to construct a natural gas pipeline system from the XTO Energy, Inc. Deep Creek well pad to the Prairie Federal mid-pressure pipeline in McKenzie County, ND.

  • OneOk Demicks Lake Pipeline Project

    OneOk Bakken Pipeline, LLC proposes to construct and operate a 20-inch steel natural gas liquids (NGL) pipeline within the USFS Little Missouri National Grasslands. The project would cross approximately 9 miles of USFS lands, 75 miles total.

  • Oneok Demore 31-10 Gas Pipeline

    8,700' of 6" poly pipeline

  • Oneok Gas Pipeline Reroute at Franks Creek

    Re-route approximately 650 feet of six-inch gas pipeline due to the existing line becoming exposed along a meander curve in Franks Creek.

  • ONEOK GMX Basaraba 34-35-1H Pipeline

    To connect the GMX Basaraba 34-35-1H well to an existing pipeline

  • OneOk Rockies Midstream, Keene to Sand Creek Natural Gas Gathering Pipeline

    Construction of approximately 335 feet of 16" natural gas gathering line by horizontal directional boring across National Forest System Lands.

  • Oneok Rockies Midstream, L.L.C. Natural Gas Gathering Pipeline to the Horse Creek Federal5004 42-35H

    Construction of a 4 inch poly natural gas gathering pipeline from the Horse Creek Federal 5004 42-35H to tie in to the existing natural gas gathering pipeline system.

  • Oneok Rockies Midstream, LLC Sand Creek-Charlson Natural Gas Gathering Pipeline

    To permit construct, operate, and maintain a 16 inch natural gas gathering pipeline approximately 3,000ft in length.

  • Oneok Rockies Midstream, LLC, Charlson Gathering Pipeline

    Oneok Rockies Midstream, LLC proposes to construct a pipeline to gather and transport natural gas produced in the area.

  • Ovintiv Sorenson Federal Multi-Well Pad

    Ovintiv proposes to construct up to 10 oil and gas wells on one pad, including an access road and associated utilities.

  • Paradigm North Charlson Oil Gathering Pipeline Project

    Paradigm proposes to construct, operate and maintain a buried crude oil gathering pipeline system and ancillary facilities to obviate the need for trucking oil and provide a more efficient and reliable means of transportation and product delivery.

  • Paradigm Tobacco Garden to North Charlson Crude Oil Pipeline

    Construction of a 6-inch steel crude oil gathering pipeline from Tobacco Garden to North Charlson.

  • Pasture 1 Vegetation Management Plan

    Analysis of Pasture 1 identified for planning purposes as a priority consistent with the criteria at 43 U.S.C. 1752(i)". The vegetation management plan would include 23 allotments from Pasture 1 and 2 allotments from Pastures 4 & 6.

  • Pasture 1-3, Allotment 333 (MCK-21-31) Range Improvement

    McKenzie Ranger District and McKenzie County Grazing Association propose the replacement of buried range water pipeline on National Forest System lands in McKenzie County, North Dakota.

  • Pasture 1-5 AMP Revisions

    Revise the Allotment Management Plans for Pasture 1 through 5 allotments on the Grand River National Grasslands.

  • Pasture 12, Allotment 467 & 470 Range Improvement Projects

    McKenzie Ranger District and McKenzie County Grazing Association propose pipelines and water tanks to improve grazing distribution and forage utilization levels on NFS lands in McKenzie County, ND.

  • Pasture 13-2, Allotment 483 (MCGA-22-51) Range Improvement Project

    McKenzie Ranger District and McKenzie County Grazing Association propose to replace a range water pipeline on NFS lands in McKenzie County, ND.

  • Pasture 15-1 A496, Pasture 7-3 A430, and Pasture 9-1 A448 Range Improvement Projects

    Pasture 15-1 A496 (MCGA-22-2), Pasture 15-1 A496 (MCGA-22-3), Pasture 7-3 A430 (MCGA-22-14), and Pasture 9-1 A448 (MCGA-22-17) range improvement projects

  • Pasture 15-1, Allotment 496 (MCGA-22-37) Range Improvement Project

    McKenzie Ranger District is seeking public comment on proposed range improvements to be installed on National Grasslands in McKenzie County. This project includes replacement of an existing water pipeline from 2 feet to 6 feet in depth.

  • Pasture 15-1, Allotment 496 (MCGA-22-4) Range Improvement Project

    McKenzie Ranger District and McKenzie County Grazing Association propose the replacement of an electric fence with a permanent four-wire conventional fence on National Forest System lands in McKenzie County, North Dakota.

  • Pasture 7 Range Water Pipeline Placement Project

    Range water developments are proposed in Pasture 7, McKenzie Ranger District, McKenzie County, ND.

  • Pasture 7, ADP 429 Range Water Pipeline

    The project proposal include installation of 1,320 feet of range water pipeline across Forest Service lands in McKenzie County.

  • Pasture 7, ADP 433 Fence and Pasture 9, ADP 443 Fence

    The McKenzie Ranger district is proposing two fencing projects. Pasture 7, Allotment 433 proposes to construct a new calving pasture fence Pasture 9, Allotment 443 proposes a new fence and holding area.

  • Pasture 7-1, Allotment 414 (MCGA-22-28) Range Improvement Project

    McKenzie Ranger District and McKenzie County Grazing Association propose the construction of a buried range water pipeline on National Forest System lands in McKenzie County, North Dakota.

  • Pasture 9-2, Allotment 450 (GGG #18) Range Improvement Project

    The McKenzie Ranger District and McKenzie County Grazing Association propose to replace an existing range water pipeline across National Forest System Lands in McKenzie County, North Dakota.

  • Pastures 3 and 5 Vegetation Management Project

    The proposal is to continue to authorize livestock grazing as a management tool on 32 allotments within Pastures 3 and 5 on the McKenzie RD, Dakota Prairie Grasslands. It is designed to maintain or improve vegetation and other ecosystem functions.

  • Pastures 4 and 6 Vegetation Management Project

    The McKenzie Ranger District, in cooperation with McKenzie County Grazing Association, proposes continued grazing and vegetation management under an adaptive management strategy on 20 grazing allotments that comprise pastures 4 and 6.

  • Peregrine Petroleum 9-16

    Peregrine Petroleum is proposing to construct three wells on one well pad in Section 9, T.146N., R.102W., 5th Principal Meridian, McKenzie County, North Dakota. This project is a private mineral estate and is located in the Red Wing Creek area.

  • Petro Hunt Dakota, LLC Andy Dufresne and Randolph Duke MWP and Rowdy Burns single well pad

    Petro Hunt Dakota proposes to construct the Andy Dufresne Federal 1-6-7H and the Randolph Duke 1-32-29H oil and gas wells on a shared pad, as well as the Rowdy Burns single well pad with associated facilities and buried utilities.

  • Petro Hunt LLC USA 153-95-3D-10-5H and 6H

    The project would drill two oil and gas wells from an existing pad.

  • Petro Hunt, LLC and Continental Resources, Inc. Proposed Oil Well Drilling

    The Forest Service is proposing to approve necessary surface use associated with Petro Hunt, LLC and Continental Resources, Inc. proposal to drill, complete, and produce an oil well on their Federal oil and gas lease consistent with current laws.

  • Petro-Hunt 153-95-18B New Oil Wells on Existing Well Pad

    Petro-Hunt L.L.B. seeks to drill three new oil and gas wells on an existing 153-95-18B well pad to exercise its right to develop federal oil and gas leases according to the terms of the lease.

  • Petro-Hunt Dakota LLC Ricky Bobby Federal 3-24-13H Multi-Well Pad

    Petro-Hunt Dakota LLC proposes to drill two oil and gas wells on one well pad.

  • Petro-Hunt Fiber Optic Cable Project

    Petro-Hunt is proposing to construct a buried 2,032 ft. of fiber optic cable to provide communications from their communications tower to the Petro-Hunt field office. The line would include a 20 foot right-of-way for construction and maintenance.

  • Petro-Hunt Glovatsky 145-98-24D-13-1H and Glovatsky 145-98-24D-13-2H

    Two oil wells and related facilities

  • Petro-Hunt LLC USA 150-102-6A-7-1H

    The Forest Service proposes to approve surface use associated with Petro-Hunt exercising its Federal lease rights to drill, complete, and produce an oil and gas well consistent with existing laws and regulations.

  • Petro-Hunt LLC USA 150-104-24C-13-1H

    The Forest Service proposes to approve the surface use associated with Petro-Hunt exercising its Federal lease rights to drill, complete, and produce a proposed oil and gas well consistent with current law and regulations.

  • Petro-Hunt LLC USA 153-95-18B-1H

    The Forest Service proposes to approve surface use associated with Petro-Hunt exercising its Federal lease rights to drill, complete, and produce a proposed oil and gas well consistent with current law and regulations.

  • Petro-Hunt LLC USA 153-95-18B-2H

    The Forest Service proposes to approve the surface use associated with Petro-Hunt exercising its Federal lease rights to drill, complete, and produce a proposed oil and gas well consistent with current law and regulations.

  • Petro-Hunt LLC USA 153-95-3B-10-1H, 2H, 3H, USA 153-95-3A-10-4H Oil and Gas Wells

    Petro-Hunt LLC proposes to drill four oil and gas wells from an existing well pad located in McKenzie County, ND.

  • Petro-Hunt LLC USA 153-95-9A-4-1HS and USA 153-95-9A-15-1HS Oil and Gas Wells

    Petro-Hunt, LLC proposes to drill two oil and gas wells from an existing pad. The pad will be expanded to its original 460' X 350' existing disturbance. Gas pipeline exists on the pad; gathering line would be constructed in disturbed area of pad.

  • Petro-Hunt Phelps Mineral Trust 6B-2-1H Well Pad Expansion

    Petro-Hunt L.L.C. seeks to drill three new oil and gas wells on an existing Phelps Mineral Trust 6B-2-1H well pad to exercise its right to develop federal oil and gas leases according to the terms of its lease.

  • Petro-Hunt USA 153-95-1A-7-2H New Oil Wells on Existing Well Pad

    Petro-Hunt L.L.C. seeks to drill four new oil and gas wells on an existing 153-95-1A-7-2H well pad to exercise its right to develop federal oil and gas leases according to the terms of the lease.

  • Petro-Hunt USA 153-95-1B-7-3H New Oil Wells on Existing Well Pad

    Petro Hunt L.L.C. seeks to drill four new oil and gas wells on an existing 153-95-1B-7-3H well pad to exercise its right to develop federal oil and gas leases according to the terms of the lease.

  • Petro-Hunt, L.L.C. State 154-94-31C-32-1H

    The Forest Service is proposing to approve necessary surface use associated with Petro-Hunt's proposal to drill, complete, and produce an oil well on their Federal oil and gas lease consistent with current laws and regulations.

  • Petro-Hunt, L.L.C. State 154-94-31C-32-2H

    The Forest Service is proposing to approve necessary surface use associated with Petro-Hunt’s proposal to drill, complete, and produce an oil well on their Federal oil and gas lease consistent with current laws and regulations.

  • Petro-Hunt, L.L.C. State 154-94-31C-32-3H

    The Forest Service is proposing to approve necessary surface use associated with Petro-Hunt’s proposal to drill, complete, and produce an oil well on their Federal oil and gas lease consistent with current laws and regulations.

  • Petro-Hunt, L.L.C. State 154-94-31C-32-4H

    The Forest Service is proposing to approve necessary surface use associated with Petro-Hunt’s proposal to drill, complete, and produce an oil well on their Federal oil and gas lease consistent with current laws and regulations.

  • Petro-Hunt, L.L.C. State 154-94-31C-32-5H

    The Forest Service is proposing to approve necessary surface use associated with Petro-Hunt’s proposal to drill, complete, and produce an oil well on their Federal oil and gas lease consistent with current laws and regulations.

  • Petro-Hunt, L.L.C. State 154-94-31C-32-6H

    The Forest Service is proposing to approve necessary surface use associated with Petro-Hunt’s proposal to drill, complete, and produce an oil well on their Federal oil and gas lease consistent with current laws and regulations.

  • Petro-Hunt, L.L.C. USA 153-95-1B-7-3H

    The Forest Service proposes to approve surface use associated with Petro-Hunt exercising its Federal lease rights to drill, complete, and produce a proposed oil and gas well consistent with current law and regulations.

  • Petro-Hunt, LLC CMNU D-406 Flowline Replacement

    Replacement of an aged steel existing flowline carrying Federal minerals from a producing oil and gas well to a central tank battery. The existing line will be replaced with a 3" spooled fiberglass line.

  • Petro-Hunt, LLC Silurian 39-1 and Silurian 54-1 Saltwater Replacement Pipeline

    This project will replace two existing saltwater pipelines for Petro-Hunt located within the existing Charlson Oil Field. The existing lines are aged and are at risk of failure.

  • Petro-Hunt, LLC USA 153-95-11C-2-1HS Well Project

    Petro-Hunt, LLC proposes to drill the USA 153-95-11C-2-1HS oil and gas well on an existing well pad, creating new disturbance of 2.32 acres.

  • Petro-Hunt, LLC USA 153-95-2 Multi-Well Pad

    Petro-Hunt, LLC proposes to construct the USA 153-95-2 oil and gas well pad with three wells. The proposal includes an access road and utilites.

  • Petro-Hunt, LLC USA 153-95-3A-33-1H Well Pad Expansion

    Petro-Hunt, LLC proposes to drill five additional oil and gas wells on their existing USA 153- 95-3A-33-1H location.

  • Petro-Hunt, USA 153-95-8A-31-1H Multi-Well Pad

    Petro-Hunt, USA proposes to drill two oil and gas wells on one existing well pad in McKenzie County, North Dakota.

  • Pioneer Gulch MDH Trail Reroute

    Pioneer Gulch MDHT Reroute to Avoid Eroded Section

  • Prairie Federal Utility Route

    XTO Energy, Inc proposes to construct crude oil and natural gas pipeline systems to transport oil and gas from the Prairie Federal well pad to existing pipeline gathering systems.

  • Pronghorn Expansion Oil and Gas Wells

    Whiting Oil and Gas Corp. proposes to construct three new pad developments, housing seven wells, within the Park Oil Field in Billings County, ND. This proposal will allow Whiting to develop its federal and private minerals.

  • Range Water Pipeline and Stock Tank Proposal

    The Forest Service is proposing to approve the installation of six range water pipelines across the McKenzie Ranger District. The installation of these projects will include the pipeline, stock tanks, and reclamation of the stock dams.

  • Range water pipeline and stock tank system, Allotment 5, Slope County, North Dakota

    Little Missouri Grazing Association proposes to install a range water pipeline and stock tank system.

  • Range water pipeline and stock tank, Allotment 019, Slope County, North Dakota

    Little Missouri Grazing Association proposes to install a range water pipeline and stock tank.

  • Range water pipeline and stock tank, Allotment 204, Billings County, ND

    Medora Grazing Association proposes to install a range water pipeline and stock tank and reclaim an existing non-functioning range water reservoir.

  • Range water pipeline and stock tank, Allotment 206, Billings County, North Dakota

    Medora Grazing Association proposes to install a range water pipeline and stock tank.

  • Range water pipeline for Pasture 1-4, Allotment 339

    The McKenzie Ranger District has received a proposal to install a range water pipeline across National Grasslands in Pasture1-4, Allotment 339.

  • Range water pipelines, stock tanks, and fence removal, Allotment 064, Slope County, North Dakota.

    The Little Missouri Grazing Association proposes to install range water pipelines, stock tanks, and remove a fence enclosure around a range water reservoir.

  • Reservation Telephone Cooperative Cartwright Project

    This project consists of the installation of 7.23 miles of buried fiber optic cable with a 20-foot right-of-way on National Forest System lands in McKenzie County, North Dakota.

  • Reservation Telephone Cooperative Fiber Optic

    RTC proposes to replace and install approximately6.86 miles of fiber optic cable

  • Reservation Telephone Cooperative fiber optic cable to three private residences

    Reservation Telephone Cooperative proposes to construct, operate, and maintain a fiber optic cable to three private residences following along NFSR #893, approximately 2 miles in length and 20 feet in width (4.85 acres).

  • Reservation Telephone Cooperative Proposed Telephone Line Upgrade Special Use Permit Project

    This permit would authorize the installation of a fiber optic line replacing existing copper telephone line along with some new line installation on National Forest System (NFS) lands on the McKenzie Ranger District, McKenzie County, North Dakota

  • Reservation Telephone Cooperative Roedeske Fiber Optic Project

    Reservation Telephone Cooperative proposes to construct, operate, and maintain a fiber optic cable to three private residences along State Highway 68 approximately 9,353 feet in length and 20 feet in width (4.29 acres).

  • Reservation Telephone Cooperative Telecommunication Lines

    This project would authorize the installation and maintenance of a buried fiber optic cable crossing National Forest System land on the McKenzie and Medora Ranger Districts.

  • Resolute Natural Resources Company, LLC Three Well Pad Oil and Gas Proposal

    The Forest Service proposes to approve surface use associated with Resolute Natural Resources, LLC exercising its federal lease rights to drill, complete, and produce an oil and gas well consistent with exiting laws and regulations.

  • Roughrider Electric 1905 Private Well

    Install 1905' of three phase 14.4 KV underground electric line to connect an oil well on private land in Section 2, T141N, R100W to an existing line in Section 35, T142N, R100W

  • Roughrider Electric 1905' Private Well

    Install 1905' of three phase 14.4 KV underground line to connect an oil well on private land in Section 2, T141N, R100W to and existing line in Section 35, T142N, R100W

  • Roughrider Electric Cooperative, Inc. Connection Line- 33 Feet

    Roughrider Electric Cooperative, Inc proposes to install 33 feet of buried electric line to connect to an existing meter pole to power a range water well.

  • Roughrider Electric Installation of Electric Lines to two Williston Exploration Oil Wells

    79 feet of electric line to the Williston Fryburg #2 oil well and 120.33 feet of electric line to the Willison David Creek #2-12 well

  • Roughrider Electric upgrade/intall overhead & Buried Electric Line

    upgrade 7863 feet of overhead and install 614 feet of buried three phase electric line to connect Continental 1X-21H and 1-25H oil wells on private land

  • S Brown Water Development

    The DPG Sheyenne Ranger District plans to relocate a water development in the S Brown Allotment. The current water development is in an inaccessible location during average to high precipitation periods.

  • Saddle Butte Pipeline, LLC Crude Oil Gathering Pipeline

    Construction of a four inch poly crude gathering pipeline along an existing utility corridor.

  • Saddle Butte Pipeline, LLC Crude Oil Gathering Pipeline Proposal

    Construction of a 4 inch poly crude gathering pipeline along an existing utility corridor.

  • Scout Energy Management, LLC MHMU 06 Oil Well Reentry

    Reentry of the existing well bore to drill one horizontal oil and gas well on the existing pad with a 972 ft. flow line installation.

  • Sequel Energy, LLC North Branch 44-35 Oil & Gas Well

    Sequel Energy proposes to construct a well pad, access approach, and install utilities along the access approach within the developed North Branch Oil Field.

  • Silvicide Environmental Assessment

    The purpose of this proposal is to evaluate the use of the silvicide triclopyr and imazapyr as additional tools for the removal of undesired trees on the Dakota Prairie Grasslands.

  • Sinclair Ersa Federal 3-4H and 4-4TFH Oil Wells and Pad

    Sinclair Oil and Gas Company seeks to build a well pad and drill two oil wells to exercise its right to develop a federal oil and gas lease according to the terms of the lease.

  • Sinclair Oil and Gas Company FS14 Multi-Well Pad

    Sinclair proposes the development of up to 14 new oil and gas wells on one pad with associated access road and utilities.

  • Slawson Exploration Company Inc Battleax Federal 1-34H

    The Forest Service proposes to approve surface use associated with Slawson Exploration Company exercising its Federal lease rights to drill, complete, and produce an oil and gas well consistent with current law and regulation.

  • Slawson Exploration Company Inc Battleax Federal 2-34H

    The Forest Service proposes to approve surface use associated with Slawson Exploration Company exercising its Federal lease rights to drill, complete, and produce and oil and gas well consistent with current law and regulation.

  • Slawson Exploration Company Inc Battleax Federal 3-34H

    The Forest Service proposes to approve surface use associated with Slawson Exploration Company exercising its Federal lease rights to drill, complete, and produce an oil and gas well consistent with law and regulation.

  • Slawson Exploration Company Inc Chariot Federal 1-27H

    The Forest Service proposes to approve surface use associated with Slawson Exploration Company exercising its Federal lease rights to drill, complete, and produce an oil and gas well consistent with current law and regulation.

  • Slawson Exploration Company Inc Chariot Federal 2-27H

    The Forest Service proposes to approve surface use associated with Slawson Exploration Company exercising its Federal lease rights to drill, complete, and produce an oil and gas well consistent with current law and regulation.

  • Slawson Exploration Company Inc Chariot Federal 3-27H

    The Forest Service proposes to approve surface use associated with Slawson Exploration Company exercising its Federal lease rights to drill, complete, and produce an oil and gas well consistent with current law and regulation.

  • Slawson Exploration Company Inc Phalanx Federal 1-22-15H

    The Forest Service proposes to approve surface use associated with Slawson Exploration Company exercising its Federal lease rights to drill, complete, and produce an oil and gas well consistent with current law and regulations.

  • Slawson Exploration Company Inc Phalanx Federal 2-22-15H

    The Forest Service proposes to approve surface use associated with Slawson Exploration Company exercising its Federal lease rights to drill, complete, and produce a proposed oil and gas well consistent with current law and regulation.

  • Slawson Exploration Company Inc Phalanx Federal 3-22-15H

    The Forest Service proposes to approve surface use associated with Slawson Exploration Company exercising its Federal lease rights to drill, complete, and produce an oil and gas well consistent with current law and regulation.

  • Slawson Exploration Company Inc., Slawson Daredevil Multi-Well Pad

    Slawson Exploration Company proposes to construct up to four oil and gas wells on one well pad, with associated access road and buried utilities on National Forest system lands.

  • Slawson Exploration Company, Inc. Wolverine Federal 6-31-30TFH

    Forest Service proposes to approve Slawson's proposal to drill, complete, and produce an oil and gas well on its federal oil and gas lease. Project is cancelled because it has been folded into a larger master development plan yet to be proposed.

  • Slawson Exploration Company, Inc. Wolverine Federal 7-31-30TFH

    Forest Service proposes to approve Slawson's proposal to drill and produce an oil and gas well on its federal oil and gas lease. Project is cancelled because it has been folded into a larger master development plan yet to be proposed.

  • Slawson Gunslinger Federal MWP and Burlington Gladstone MWP

    Slawson proposes to construct a multi-well pad (MWP) consisting of 10 wells, referred to as the Gunslinger Federal MWP. Burlington proposes to construct seven wells on one well pad referred to as the Gladstone MWP.

  • Slope Electric Cooperative, Inc. Electric Connection Line- 60 feet

    Slope Electric Cooperative, Inc. proposes to install approximately 60 feet of overhead electric cable for service to a range water well located on private land in Slope County, North Dakota.

  • SM Energy Casey Jones Federal 9-23H oil well, access road and flowline

    Allow SM Energy to exercise its right to develop its federal mineral lease by constructing an oil well pad and access road to allow it to drill a well and produce hydrocarbons.

  • SM Energy Development of Bear Den Oil Wells

    SM Energy proposes an expansion of an existing pad, where the Bear Den Federal 4-30H well is located, and the creation of a new pad to drill a total of eight oil and gas wells within the Bear Den Oil field.

  • SM Energy's Rocky Top Federal 4-9H Oil Well

    SM Energy proposes to construct an oil and gas well, well pad, access road and associated utilities to exercise its right to develop its federal mineral lease.

  • SM Energy's Salty Dog Federal 3-34HS Oil Well

    SM Energy proposes to construct an oil and gas well, well pad, access road, and associated utilities to exercise its right to develop its federal mineral lease.

  • Southwest Sheyenne Vegetation Management Project

    The project includes grazing, prescribed burning, mowing, removing invasive trees, reseeding/interseeding, mechanical treatments, herbicide treatment, installation of range improvements as activities to move towards meeting grassland plan direction.

  • Southwest Water Pipeline Project

    North Dakota State Water Commission Southwest Water Pipeline Project to increase delivery of potable water to the West Zone Service Area by construction of four ten-inch diameter pipelines to parallel NDDWR SWPP existing main transmission line

  • Southwestern Tracy Mountain Oil and Gas Wells Project

    Southwestern Production Corporation proposes to construct five new well pads, housing one well each, within the Tracy Mountain Oil Field in Billings County, North Dakota.

  • Stuber Road Culvert Replacement/Road Reconstruction

    Slope County is requesting to amend a valid existing easement to include approximately .56 acres of additional permanent easement along 76th Street SW (Stuber Road) for road reconstruction and culvert replacement.

  • Sully Springs Juniper Reduction

    Medora Ranger District, is proposing the reduction of Rocky Mountain Juniper (Juniperus scopulorum) in the Sully Springs area located approximately 9 air miles southeast of Medora, North Dakota

  • Sunset Trail Construction

    The McKenzie Ranger District proposes to construct a new non-motorized recreation trail, called Sunset Trail to connect the Maah Daah Hey Trail to the Long X Trail.

  • Telecommunications Cable Projects

    Consolidated Telecom proposes to bury fiber optic cable approximately 5 feet from existing copper line in Sections 25, 26, T23N, R11E, and Sec. 19, 30, T23N,R12E. West River Telecom proposes to bury 2640 ft. fiber optic cable in NW Sec. 35, T130N R86

  • Telephone Line Permits

    Reissue special use permits previously permitted to US West Communications, Inc. to Missouri Valley Communications, Inc., Consolidated Telecom, and Qwest.

  • Theodore Roosevelt Medora Foundation Reissuance of Existing Master Private Road Special Use Permit

    Reissuance of an existing road permit for Forest Service Road #742-21, of 543 feet, to access the Bully Pulpit Golf Course for administration purposes.

  • Theodore Roosevelt National Park Fence Permit

    Reissue special use permit to Theodore Roosevelt National Park for buffalo fence.

  • Theodore Roosevelt Presidential Library Temporary Construction Road

    Temporary access to construction site of library

  • Tobacco Garden Gathering Pipeline System Project

    Construction of approximately 9.7 miles of 8-inch high-pressure pipeline constructed of carbon steel to gather crude oil production.

  • TRMF Trail Rides Special Uses

    Trail Ride - Teddy Roosevelt Medora Foundation to continue guided horseback trail rides.

  • True Oil LLC Federal 21-3 3-10H

    The Forest Service proposes to approve surface use associated with True Oil exercising its Federal lease rights to drill, complete, and produce an oil and gas well consistent with current law and regulation.

  • True Oil LLC Tru Federal 11-4 4-9H

    The Forest Service proposes to approve surface use associated with True Oil exercising its lease rights to drill, complete, and produce and oil and gas well consistent with current law and regulation.

  • True Oil Red Wing Creek Master Development Plan

    The proposal includes access roads, underground electric and fiber optic lines, and saltwater, oil, fresh water, and gas pipelines, and any utilities or pipelines that may be necessary for production.

  • True Oil, L.L.C. Northern State 31-36 Access Road and Utilities

    True Oil, L.L.C. proposes to construct an access road and utility route to the Northern State 31-36 oil and gas well pad located on State land in McKenzie County, North Dakota.

  • True Oil, LLC 21-16-16-21H Pipeline Project

    Construction of a 4 inch poly natural gas pipeline, a 4 inch flex steel salt water pipeline, and a 4 inch poly fresh waterline paralleling each other and a recently approved crude oil pipeline.

  • True Oil, LLC Federal 31-32 Oil and Gas Proposal

    True Oil, LLC proposes to construct a well pad, access approach, and install utilities along the access approach within the developed Red Wing Creek Oil Field.

  • Upper Missouri G&T Cooperative Access Road

    200 feet of access road to existing Medora Substation

  • USA Federal 6A-HU Oil and Gas Well (Whiting Oil and Gas Corporation)

    Whiting proposes to drill an oil and gas well(USA Federal 6A-HU)from the existing USA 150-102-6A-7-1H well pad. The pad is approximately 2.36 acres. The project will add approximately 0.58 acres to the existing pad and use existing NFSR #858A-6.

  • Utility route to XTO Energy Inc. Mandal Hovet Federal 41X-29 MWP

    XTO Energy, Inc. proposes to construct utilities to the Mandal Hovet Federal 41X-29 multi-well pad. The utilities could include, but are not limited to electric lines, fiber optic lines, and gas, oil, and freshwater and saltwater pipelines.

  • Verizon Wireless NFSR #7010-7

    Utilize 1366.16 feet of NFSR#7010-7 to an existing cellular tower located on private land. Verizon Wireless has been utilizing the access road and issuing a permit brings the use into compliance. No plans to upgrade the portion of road on NFS lands

  • Wesco Operating, Inc. Federal 43-20 Oil and Gas Well Pad

    Wesco Operating, Inc. proposes to construct an oil and gas well pad, including an access road and associated utilities.

  • West Rhame Road Repair and Maintenance

    Slope County, with ND DOT, proposes a roadway reconstruction of aggregate surfacing and culvert replacements on CMC 4417, aka West Rhame Road, to provide a 32-foot wide driving surface. The project crosses 1.5 miles of National Forest Service land.

  • West River Cooperative Telephone Company Buried Fiber Optic Cable Project

    Bury fiber optic telecommunications line.

  • White Horse Water, LLC. Red Wing James Water Project

    White Horse Water, LLC. proposes to install, operate, and maintain a 12 inch, non-potable freshwater pipeline across approximately 1.2 miles of National Forest System lands.

  • White Rock Oil and Gas, LLC Trailside 34-33 Saltwater Pipeline Project

    White Rock Oil and Gas, LLC proposes to install, operate, and maintain a three inch high density polyethylene saltwater pipeline in the southwest portion of McKenzie County.

  • Whiting BSMU 1702 Flowline

    Replace 25+ year old deteriating steel oil production flowline

  • Whiting BSMU Flowline Replacement

    Replace 1,000 Feet flowline

  • Whiting NERU 2102X Oil and Gas Well

    Proposal to drill an additional well bore on the existing NERU 2102 well pad on NFS lands for continued development of Federal minerals. The existing well pad would be expanded with disturbance extimated to be 3.47 acres.

  • Whiting NERU 2903

    Pipeline Replacement

  • Whiting Oil % Gas Pronghorn 14-11PH

    Oil well and related facilities

  • Whiting Oil & Gas Corp NERU 0904ERH

    Well pad, access road, and related facilities

  • Whiting Oil & Gas Corp Pronghorn 21-14 PH

    Oil well and related facilities

  • Whiting Oil & Gas Corp Tarpon Federal 24-20-1H

    The Forest Service proposes to approve surface use associated with Whiting Oil & Gas Corporation exercising its Federal lease rights to drill, complete, and produce and oil and gas well consistent with current law and regulation.

  • Whiting Oil & Gas Corp Tarpon Federal 24-20-2H

    The Forest Service proposes to approved surface use associated with Whiting Oil & Gas Corporation exercising its Federal lease rights to drill, complete, and produce an oil and gas well consistent with current law and regulation.

  • Whiting Oil & Gas Corp Tarpon Federal 24-20-3H

    The Forest Service proposes to approve surface use associated with Whiting Oil & Gas Corporation exercising its existing lease rights to drill, complete, and produce an oil and gas well consistent with current law and regulation.

  • Whiting Oil & Gas Corp Tarpon Federal 44-19-2H

    The Forest Service proposes to approve surface use associated with Whiting Oil & Gas Corporation exercising its Federal lease rights to drill, complete, and produce an oil and gas well consistent with current law and regulation.

  • Whiting Oil & Gas Corp Tarpon Federal 44-19-3H

    The Forest Service proposes to approve surface use associated with Whiting Oil & Gas Corporation exercising its Federal lease rights to drill, complete, and produce and oil and gas well consistent with current law and regulation

  • Whiting Oil & Gas Tarpon Federal 34-20-1H Multi Well Pad

    Whiting Oil and Gas proposes to drill six oil and gas wells in SESW Section 20, T.153N., R.96W., 5th PM, McKenzie County, North Dakota.

  • Whiting Oil and Gas BSMU 1302 Flowline Replacement

    Proposal to replace a deteriorating steel line with approximately 3,400 ft. of new 3 inch high pressure fiberglass pipe

  • Whiting Oil and Gas BSMU 1808 oil and gas well and access road

    Proposal to construct a 3.0 acre well pad and 42' access road on NFS lands to develop underlying Federal minerals

  • Whiting Oil and Gas BSMU 2410 Flowline Extension

    Proposal to extend an existing sement of line within the same trenches as the BSMU 1302 line replacement. Approximately 2,400 ft. of high pressure 3 inch fiberglass line

  • Whiting Oil and Gas BSMU 2501, Water Injection Line Replacement

    Proposal to replace deteriorating steel line with approximately 3800 ft. of new 3 inch high pressure fiberglass pipe.

  • Whiting Oil and Gas BSMU 2502A, oil flowline replacement

    Proposal to replace a deteriorating steel line with approximately 4,600 ft. of new 3" high pressure fiberglass pipe

  • Whiting Oil and Gas BSMU 3001 Flowline Replacement

    Proposal to replace deteriorating steel line with approximately 3,600 ft. of new 3 inch high pressure fiberglass pipe.

  • Whiting Oil and Gas BSMU 3006 Flowline Extension

    Proposal to extend existing flowline 2,600 ft. within same trench as BSMU 3001 line replacement project. New extension would be new 3" high pressure fiberglass line.

  • Whiting Oil and Gas BSMU0706 Oil and Gas Well

    Proposal to expand existing BSMU0705 well sete and drill additional well bore on same location. Pad would be enlarged by approximately 1.8 acres. No additional road construction required

  • Whiting Oil and Gas Corp - Ash Coulee 44-18TFH

    Oil well, road, pipeline, and related facilities

  • Whiting Oil and Gas Corp Ellison Creek 21-1PH

    Oil well and associated facilities

  • Whiting Oil and Gas Corp Fiber Optic Cable Installation

    Installation of approximately 6,127 feet of fiber optic cable in Sections 11 and 12, T140N, R100W

  • Whiting Oil and Gas Corp Pronghorn 11-14PH

    Oil well and related facilities

  • Whiting Oil and Gas Corp Pronghorn 11-15PH

    Multi-well pad, access road & related facilities

  • Whiting Oil and Gas Corp Pronghorn 14-10PH

    Multi-well pad, access road and related facilitiesd

  • Whiting Oil and Gas Corp Pronghorn 14-12PH

    Oil and Gas well and associated facilities

  • Whiting Oil and Gas Corp Pronghorn 21-15PH

    Multi-well pad, access road and related facilities

  • Whiting Oil and Gas Corp Pronghorn 44-10PH

    Multi-well pad, access road and related facilities

  • Whiting Oil and Gas Corp Pronghorn 44-11PH

    Oil well and associated facilities

  • Whiting Oil and Gas Corp Tarpon Federal 44-19-1H

    The Forest Service proposes to approve surface use associated with Whiting Oil & Gas Corporation exercising is Federal lease rights to drill, complete, and produce and oil and gas well consistent with current law and regulation.

  • Whiting Oil and Gas Corporation and Newfield Exploration Company Proposed Oil Well Drilling.

    The Forest Service is proposing to approve necessary surface use associated with Whiting Oil and Gas Corporation and Newfield Exploration Company's proposal to drill, complete, and produce an oil well on their Federal oil and gas lease.

  • Whiting Oil and Gas Corporation Ranger Federal 11-28H access road and utility corridor

    Whiting Oil and Gas Corporation proposes to construct an access road and utility corridor across NFS lands to an oil well proposed on private land, Whiting's Ranger Federal 11-28H multi-well pad.

  • Whiting Oil and Gas Corporation USA Federal 6B-1H, 2H, and HU Oil and Gas Wells

    Whiting Oil and Gas Corporation (Whiting) is proposing to drill three oil and gas wells from the existing USA Federal 6B-2-1H well pad.

  • Whiting Oil and Gas Pronghorn 11-13PH

    Oil and Gas well and associated facilities

  • Whiting Oil and Gas Pronghorn 34-10PH

    Multiwell oil pad, access road, & related facilities

  • Whiting Oil and Gas Pronghorn 41-15PH

    Multi-well pad, acess roads and related facilities

  • Whiting Oil and Gas, BSMU 1306 Oil and Gas Well

    Proposal to construct a 3.5 acre well pad and 25' access road/approach on NFS lands to develop underlying Federal Mineral lease

  • Whiting Oil and Gas, BSMU 1910 Oil and Gas Well

    Proposal to construct 3.20 acre well pad and a 645 foot access road on NFS lands to develop underlying Federal minerals

  • Whiting Pronghorn Federal #34-11TFH

    Construction of a well pad and access

  • Whiting Tarpon Federal 44-19 MWP

    Whiting Oil and Gas Corporation proposes to drill six additional oil and gas wells on an existing six well pad.

  • Whiting's DeMores Federal 21-11PH Oil Well and Access Road

    Whiting Oil and Gas Corp. proposes to develop an oil and gas well, well pad, access road, and related utilities to exercise its right to develop its federal mineral lease.

  • Whiting's Ellison Creek 11-7-2PH and 11-7-3PH Oil Wells

    Whiting Oil and Gas Corp. proposes to add two new oil and gas wells on an existing 11-7TFH well pad to exercise its right to develop its federal mineral lease.

  • Whiting's Roosevelt 23-29-1PH and 23-29-2PH Oil Wells

    Whiting Oil and Gas has submitted a plan of operations for the Roosevelt 23-29-1PH and Roosevelt 23-29-2PH oil and gas wells to include a well pad, well bores, natural gas line, electric line, and access road.

  • XTO Energy Inc Arlene Federal 44X-11

    The Forest Service proposes to approve surface use associated with XTO Energy Incorporated exercising its Federal lease rights to drill, complete, and produce an oil and gas well consistent with current law and regulation.

  • XTO Energy Inc Cherry Creek 21X-15

    The Forest Service proposes to approve surface use associated with XTO Energy Incorporated exercising its Federal lease rights to drill, complete, and produce an oil and gas well consistent with current law and regulation.

  • XTO Energy Inc Cross Federal 32X-20

    The Forest Service proposes to approve surface use associated with XTO Energy Incorporated exercising their Federal lease rights to drill, complete, and produce an oil and gas well consistent with current law and regulation.

  • XTO Energy Inc Hovet Federal 41X-29

    The Forest Service proposes to approve surface use associated with XTO Energy Incorporated exercising its Federal lease rights to drill, complete, and produce an oil and gas well consistent with current law and regulation.

  • XTO Energy Inc Johnson Federal 21X-15

    The Forest Service proposes to approve surface use associated with XTO Energy Incorporated exercising its Federal lease rights to drill, complete, and produce an oil and gas well consistent with current law and regulaton.

  • XTO Energy Inc Mandal Federal 41X-29

    The Forest Service proposes to approve surface use associated with XTO Energy Incorporated exercising its Federal lease rights to drill, complete, and produce an oil and gas well consistent with current law and regulation.

  • XTO Energy Inc Prairie Federal 31X-30

    The Forest Service proposes to approve surface use associated with XTO Energy Incorporated exercising its Federal lease rights to drill an oil and gas well consistent with current law and regulation

  • XTO Energy Inc Riverview Federal 32X-15

    The Forest Service proposes to approve surface use associated with XTO Energy Incorporated exercising its Federal lease rights to drill, complete, and produce an oil and gas well consistent with current law and regulation.

  • XTO Energy, HBU Sakakawea Federal 13X-35R Multi-well Pad Expansion

    XTO Energy proposes to expand the HBU Sakakawea Federal 13X-35R multi-well pad to accommodate drilling three additional horizontal oil and gas wells.

  • XTO Energy, Inc. Harley Federal 44X-15 Access Road and Utility Corridor

    XTO Energy, Inc. proposes to construct an access road and utility corridor to the Harley Federal 44X-15 well pad located on private land.

  • XTO Energy, Inc. Mandal/Hovet Federal 41X-29 Multi-Well Pad Expansion

    The existing XTO Mandal/Hovet Federal 41X-29 multi-well pad will be expanded by approximately 3.5 acres to accommodate the addition of ten oil and gas wells and related facilities.

  • XTO Energy, Inc. Mandel Hovet Federal 41X-29 Utility Route

    McKenzie Energy Partners, LLC proposes to construct a buried saltwater pipeline to the XTO Energy, Inc. Mandel Hovet Federal 41X-29 multi-well pad. A utility right-of-way would include this saltwater pipeline plus future utilities to this location.

  • Zenergy, Inc. Grasslands USA 21-16H

    The Forest Service is proposing to approve necessary surface use associated with Zenergy, Inc's proposal to drill, complete, and produce an oil and gas well on their Federal oil and gas lease consistent with current laws and regulations.

  • Zenergy, Inc. Tjelde USA 28-33H