506 Continental Divide Connector Trail
Construct 1 mile of new standard trail that will serve as a CDT Connector trail serving local and thru hikers near the Little Walnut Rd and Bear Creek Ben Lily Overlook areas.
-
7 Troughs Hazardous Fuels Reduction
thin pinyon juniper stands adjacent to private lands, east of Black Peak.
-
Abandoned Mine Closures
Remediation of physical safety hazards at abandon mine features.
-
Adair Pipeline Extension
Install and bury approximately 1.4 miles of poly pipeline and a drinking trough, to provide an alternative watering location for the excluded Adair Springs.
-
Additional Use and Modification of the Existing Crown Castle Communication Facility on Jack's Peak
Crown Castle GT Company, LLC is modifying its existing communication tower at the Jack's Peak Communication Site for greater stability. It is also going to allow T-Mobile and AB Spectrum to locate their antennas and repeater equipment on their site.
-
Agua Fria Water System
Purpose of project is to improve existing water sources on the Agua Fria Allotment. Improvements would benefit wildlife and livestock. Proposed to install approx. 2.7 miles of pipeline, 1 or 2 storage tanks, and 2 troughs.
-
Aldo Leopold CFRP Project
Fuels management activities in the Aldo Leopold Wilderness
-
Antelope Pipeline - Spur Lake Allotment
Install a water system with 3.5 miles of buried pipeline, 2 drinkers, and storage tank in Antelope Pasture on Spur Lake Allotment to provide water for and improve distribution by both wildlife and livestock.
-
Apache Creek Volunteer Fire Department Water Tank Special Use Permit
Proposed project is for the installation of a 48,000 gallon water tank for use by Apache Creek Volunteer Fire Dept. Tank will be located at the former Aragon Transfer Station.
-
Arizona Interconnection Project (AIP) Access Roads Amendment
El Paso Electric has applied to renew their permit on FS lands and amend right-of-way to include permanent access to existing authorized 345 kV transmission line for maintenance on BLM and FS lands. See http://www.blm.gov/nm/epeaccess for more info.
-
Bear Creek CRMP Fuel Break Hand Thinning
Hand thinning treatement to improve forest health while mitigating intense fire along the primary ingress and egress route for multiple land owners. Buffer of approximately 47.8 acres along FSR172.
-
Bear Mountain CDT
Approximately 7 miles of corridor clearing of trees and brush and new trail construction (including installation of appropriate features such as retaining walls, waterbars, and climbing turns) to connect the Continental Divide Trail from the Forest
-
Bearwallow Park Pipe Fence Construction
Proposal is to replace two fences around two naturally occurring meadows with pipe fence. Proposal is also to cut hazard trees.
-
Beaverhead Airstrip
Purpose of project is to increase aircraft, pilot, and passenger safety for the backcountry airstrip that is part of the Beaverhead Work Center administrative site by removing encroaching woody vegetation from around the airstrip and flight path.
-
Bennett - Special Use Road Permit
Purpose of the project is to issue a road use permit to provide reasonable access to private lands and put into place a road maintenance agreement.
-
Berenda Allotment
This project analysis the effects of continued grazing management of the Berenda Allotment.
-
Big Burro Mountains Decommissioning Project
The project includes implementing measures to decommission 62 miles of roads, restore road-impacted resources to productivity, and return former roadbeds to a more natural appearance. These roads have been previously closed.
-
Black Bob and Lower Plaza Allotment EA
This project proposes to authorize livestock grazing consistent with Forest Service policy and to provide long-term management direction for domestic livestock grazing. The Black Bob Allotment is proposed to be split into two Allotments.
-
Black Bob Riparian Exclosure
Install riparian exclosure fence to facilitate watershed, fish habitat and riparian restoration by excluding livestock from the perennial San Francisco River except at designated water access locations.
-
Black Canyon Barrier Maintenance
Cement wall will be attached directly downstream of present barrier to strengthen the barrier.
-
Black Canyon Stream Restoration
Wilderness RD is scoping a restoration proposal by New Mexico Environmental Dept. for projects in Black Canyon, to reduce water temperature impairment through planting, improving instream habitat for Gila trout and watershed function.
-
Black Mesa Pinon-Juniper Treatment Project
approximately 239 acres within the Allie/Avalanche grazing allotment will treat juniper and pinon pine using mechanized equipment and hand tools, to improve wildlife habitat and provide forage for wildlife and livestock.
-
Black Range Allotment Environmental Assessment
This EA will reauthorize a suitable level of livestock grazing for the Black Range Allotment that meets all laws and regulations and the Gila Forest Plan.
-
Bridge Replacement and Rehabilitation on NFSR 150
Replace or rehabilitate 8 bridges to ensure public safety.
-
Burnt Cabin Timber Stand and Wildlife Habitat Improvement
Improve timber stand and wildlife habitat. There is a need to improve timber stands resilience to risk of insect and disease infestation, drought and wildfire. Improve grassland and aspen wildlife habitat by removing encroaching trees.
-
Burro Forest Restoration Project
Thinning of Pinyon-Juniper, Ponderosa Pine, and Mixed Conifer. Grassland restoration.
-
Burro Mountain Thinning
The Silver City Ranger District is proposing to improve timber stand and wildlife habitat by reducing natural fuels on approximately 200 acres in the Burro Mountians using a combination of mechanical thinning and prescribed fire.
-
Burro Mountains AML
The purpose of the project is to reduce potential hazards to the public associated with open mines while protecting and preserving the intrinsic value of mining related features such as wildlife habitat and historic artifacts (25-30 possible sites)
-
Buzzard Wildfire Salvage, Road Maintenance and Site Preparation for Natural Regeneration or Planting
The project includes a combination of salvage of timber, roadside hazard tree mitigation, and site preparation for natural regeneration with the option of planting across the high and moderate fire severity areas of the Buzzard Wildfire.
-
C-Bar Allotment Riparian Exclosure Fence
Permitee to construct small riparian exclosure in T21S, R15W, section 29 to exclude livestock use and invigorate the native plant population. Project area is about 25 miles southwest of silver City in the Burro Mountains in Grant County.
-
Canovas Creek Paleontological Excavation
Extension of previous project for excavation of paleontological site by New Mexico Museum of Natural History and Science
-
Catron County Commission, Reserve Airport and Beacons, Special Use Permit - Amendment
Amend existing special use permit for additional improvements, maintenance and upgrades of existing improvements, and widening of the airstrip
-
CDT Trail Realignment
Realignment of the Continental Divide Trail to remove trail from motorized route.
-
Cedar Breaks PJ Treatment
Remove pinyon, juniper, and oak from up to 2398 acres of invaded grassland; reduce tree density within up to 1679 acres; and clean a silted tank. This is to improve wildlife habitat.
-
Chane Carter Powerline Installation
The proposed action would allow the installation of two new powerlines and associated poles on National Forest System (NFS) lands by Sierra Electric Coop. One line would be ~0.6 miles and the other ~0.4 miles in length both leading to private land.
-
Chloride Abandoned Mine Closures
Sealing existing mine adits and shafts for public safety.
-
Cold Springs Timber Stand Improvement
Vegetation improvement project aimed to reduce tree density in woodland and ponderosa pine forests utilizing a combination of mechanical and prescribed burning. There will also be opportunity for forest products to be available to the public.
-
Construction of a US Customs & Border Protection Communication Facility at the Mangas Mtn. Comm Site
U.S. Customs & Border Protection desires to establish communication facilities at the Mangas Mtn Communication Site on the Apache NF (Adm by the Gila N.F). The antenna used by this Agency will be placed on the existing tower owned by the State of NM
-
Construction of the Verizon Wireless Cellular Communications Facility on San Francisco Divide Mtn.
Construction of a cellular telecommunication facility for communication coverage of an area not currently served by this use.
-
Continental Breccia Oxide Project Exploration Core Drilling
Freeport-McMoran Chino Mines has applied for a permit to drill 13 exploratory sites on 3.6 acres east of Fort Bayard. Less than 1 mile of roads would be constructed for access.
-
Continental Divide National Scenic Trail Reroute near Monument Park
Currently, about 2 miles of the CDNST and Forest Service Road (FSR) 226 share the same travel route in the Monument Park area. The purpose of this project is to separate motorized and non-motorized uses by constructing approx. 1-2 miles of new trail.
-
Cox Canyon, Deadman, Y Canyon, and O Bar O Allotment EA
Grazing allotment managment plan for the Cox Canyon, Deadman, Y Canyon, and O Bar O Allotments
-
Cruzville Timber Stand Improvement
Propose to treat approx. 5,699 acres to improve timber stands. High densities of pinon-juniper, gray oak, and ponderosa pine trees have resulted in reduced tree growth and stand conditions more prone to high mortality.
-
Dark Canyon and Long Canyon Allotment EA
Grazing allotment managment plan for the Dark Canyon and Long Canyon Allotments.
-
Dark Sky Campground development
Develop 2 campgrounds designed to meet need for amateur astronomy viewing areas. Includes access road, parking, signing, toilet, fence, and campgrounds.
-
Deep Creek PJ Treatment
Remove pinyon, juniper, and oak from up to 1000 acres ofinvaded grassland and reduce tree density within up to 174ac of woodland to improve forage for wildlife (elk).
-
Denver Museum of Nature and Science Research
Purpose of the proposal is to study and collect information on an archaeological site on the Quemado Ranger District near Toriette Lakes area. Work will be conducted by the Denver Museum using various research techniques and activities.
-
Dragonfly Trailhead Parking Expansion
Expand existing parking lot at Dragonfly Trailhead by 150ft to North along Elias Road, add signage and drainiage for system.
-
Dry Creek Juniper Savanna Restoration
Project proposal will be to treat encroaching one seed juniper with thinning and prescribed fire. Project will help improve mule deer and quail habitat.
-
East Jewett Pipeline Extentions
Extension of two pipelines to provide a reliable water source for wildlife and livestock use. (Uno Pino Pipeline Extention combined with this project.)
-
Fish Barrier Maintenance
Repair and maintenance to 2 existing fish barriers located in McKnight Canyon and West Fork Gila River
-
Forest Road 150, (North Star Mesa Road)
Heavy maintenance consisting of surfacing (ABC), drainage structure replacements, and road stabilization.
-
Forest Service Road 4072 L Reroute
The purpose of the project is to improve watershed functions by re-routing a section of FSR 4072 L up onto the hill slope and remove it from within Turkey Run drainage while also improving ingress/egress for private landowners.
-
Forest Service Road 522-Special Use Permit
Propose to permit the 0.13 miles from existing gate to private land where there is adequate space for motor vehicles to turn around versus in narrow canyon at private land. Install a walk through swing gate for access to NFS lands.
-
Forest-wide Wildflower Planting for Pollinators and Traditional Uses
Gila NF proposes a series of plantings to address: 1) need to increase availability of traditional use plants for utilization by the Tribes that partner w/ the Forest & 2) need to protect & expand upon the availability of habitat for pollinators.
-
Frisco Plaza Allotment EA
Grazing allotment management plan for Frisco Plaza Allotment
-
Gap 2 Wildland Urban Interface
thin vegetation adjacent to private lands near Sombra De Gallo and Agua Fria subdivision.
-
Geothermal Leasing Programmatic Environmental Impact Statement
The Forest Service was a cooperating agency, assisting the Bureau of Land Management (BLM) in that Agency's geothermal leasing analysis and decision. The BLM issued a record of decision on 12/17/2008.
-
Gila Forest Plan Standards and Guidelines
Revise implementation and monitoring schedules in the Forest Plan standards and guidelines
-
Gila Monster Gran Fondo Road Bike Recreation Event
Issue 5 year term recreation event permit for Gila Monster Gran Fondo to use 3 rest stops along Hwy 15 - Wildhorse Mesa, Copperas Vista, and Gila Cliff Dwelling parking lot located on Silver City and Wilderness Ranger Districts.
-
Gila National Forest Multiple CE Project Proposals
Wide range of projects located across the Forest are being proposed, see the attached scoping document.
-
Gila National Forest Travel Managment Rule Implementation
The Forest is implementing the Travel Management rule, which calls for establishing a system of roads, trails, and areas designated for motorized use; and determining suitable locations for motorized dispersed camping.
-
Gila Wilderness Feral Cattle Removal
Propose to conduct lethal and non-lethal feral cattle removal from the Gila Wilderness to address the presence of feral cattle. Feral cattle have negatively impacted habitat, water quality, riparian, and wilderness character.
-
Gilita and Willow Creek Campground Restoration
campsite restoration, corral facility installation, toilet facility removal and relocation
-
Gilita Creek Stream and Riparian Watershed
The Gilita Creek watershed supports a recovery population of Gila trout & is listed under the Clean Water Act Section 303d for temperature & nutrient impairments. Project objective is to improve stream, riparian, and meadow habitats.
-
Glenwood Administrative Site_Maintenance without burning
Project to perform maintenance within administrative boundaries to include building repairs, fence construction and repairs, landscaping, road and associated accesories (such as culverts) repairs
-
Glenwood Closure of Illegal Routes into Wilderness and Wilderness Study Areas
There are multiple locations where illegal motorized intrusions are occurring in Wilderness & wilderness study areas, threatening wilderness character and quality. Proposal is block motor vehicle intrusions using one or more methods of barrier types.
-
Glenwood Ranger District Administrative Site Maintenance/ Fuel Reduction
Reduce fuel on the Glenwood Ranger District
-
Gooseberry Division Fence, Deep Creek Allotment
Build a less than 3 mile long standard 4-wire FS fence to keep livestock away from wolf depredation.
-
Harve Gulch/Mogollon Allotment
Authorize livestock grazing (may include Mogollon Allotment as possible alternative)
-
Hillsboro Peak Privy Project
The privy at Hillsboro Peak & Black Mtn lookout towers are at capacity. It is time to replace both with new privies which will include such things as removing old structures, blasting and/or digging new pits, & building new structures.
-
Indian Creek Cabins Special Use Permit
Re-Issuance of Special Use Permits for three recreational residences.
-
Indian Peak Prescribed Fire
Improve timber stand and wildlife habitat by prescribed fire and mechanized equipment (chainsaw, mower, dozer, etc), to restore habitat and reduce future wildfire risk by improving watershed resiliency.
-
Jaybird Canyon Prescribed Burn
Prescribed within 2,027 acres for the purpose of hazardous fuels reduction downslope of Signal Peak
-
Jewett Gap Water System
Proposed to increase existing water sources on the Jewett Gap Allotment. Improvements would benefit wildlife and livestock. Proposed to install 3 drinkers, approx. 3 miles of pipeline and 3 storage tanks within the Gap and Gallo pastures.
-
Jewett Restoration
Maintain grasslands and thin/burn ponderosa and pinyon juniper for wildlife purposes.
-
Kemp Mesa Thinning Project
Mechanically thinning approximately 957 acres of pinyon/juniper. The purpose of the project is to maintain meadow and grasslands for elk calving grounds.
-
Kingston/ Percha Riparian Enhancement
Construct approximately 0.50 miles fence on forest/pvt land. Maintain/repair 1 mile of fence. Cut Junipers and debris out of riparian area, leave cut junipers for fuel wooders and re-locate Bloodgood Spring for watering livestock and wildlife.
-
Ladrone Trail Reconstruction
Reconstruct & reroute portions of the existing Ladrone Trail #127 which are impassable due to lack of maintenance & impacts from 2013 Silver Fire. Trail between Kingston & Hillsboro Peak; segments lie with Aldo Leopold Wilderness and roadless area.
-
Laney Diversion & Ditch Special Use Permit Issuance
Upgrade an existing diversion and ditch on Centerfire Creek. Issue a special use permit for upgrade implementation and maintenance.
-
Largo West and Candy Well Tricktank Improvements
Replace existing barbed wire fences with steel pipe fencing and replace failed water catchments.
-
Leggett Allotment EA
Grazing allotment management plan for Leggett Allotment
-
Little Cherry Lane Maintenance Association
To allow private land access across NFS land to the resisdents of the private property identified.
-
Little Red Thinning for Wildlife Habitat Improvement
In approximately 5,000 acres, cut 5 acre openings in dense pinyon-juniper woodland to stimulate grass, forb and browse growth. Travel corridors approximately 50-100 foot wide will be left uncut. The area will be accessible for fuelwood gathering.
-
Little Walnut CDNST Trailhead
Proposal to improve the parking area and trailhead design to ensure safety for trail users by creating adding signing and improve parking and access to accommodate a variety of vehicles and provide ADA accessible parking.
-
Lower San Francisco Wilderness Study Area Riparian Restoration
Complete restoration activities and install recreation signage to improve visitor experience and mitigate unintentional resource damage issues within the San Francisco Wilderness Study Area (WSA).
-
Luna Planning Area User-Created Routes Decommissioning
Over the last several years concerns have been heard on increase of user created routes. These routes are primarily associated with illegal wood cutting or off-road motorized vehicle use. Proposal is to decommission user-routes in Luna Planning Area
-
Luna Restoration Project
Ecological restoration project: minimize impacts of high severity fire/community protection; veg/forest health mngt; improve watershed conditions; protect/conserve wildlife habitat. See also http://www.fs.usda.gov/detail/gila/home/?cid=STELPRD3828973
-
Mackey Wildlife Water
Improve existing water sources in the Mackey Allotment to ensure wildlife and livestock have access to reliable waters. Proposed pipeline extension and associated drinkers would provide reliable waters in lower portions of O-O and Park Pastures
-
Malone Mineral Exploration Drilling Project
Proposal to conduct hard rock mineral exploration drilling (up to 14 drill pads) near the Knight Peak area in the Burro Mountains.
-
Mangas Electronic Site
thin vegetation adjacent to Electronic site
-
Mangus Bowmen Archery Shoots
Issuance of 5 year special use permit for archery shooting range in Fort Bayard and Skates Canyon
-
Moraga Canyon-Collins Park Antelope Corridor
Treat approximately 6,500 acres of Pinyon Juniper and Ponderosa Pine habitat to link Collins Park with the Plains of San Augustin and facilitate Pronghorn Antelope movement, restoring a native ungulate and game species to its historic home range.
-
Mud Hole Rock Pit
Re-opening an existing quarry site to the New Mexico DOT for a gravel source
-
Mulberry Thinning and Rx
The Silver City Ranger District is proposing to improve timber stand and wildlife habitat by reducing natural fuels on approximately 2,402 acres in the Mulberry fuelwood area located southwest of the oak grove subdivision.
-
Navopache Electric Cooperative - Powerline Extension
Navopache proposes to install approx 0.4 miles of powerline from its current end point in Pleasanton along Hwy 180 to the Catron County Transfer Station.
-
Noonday/Gallinas Grazing Allotment
The purpose and need for the Noonday-Gallinas Allotment EA is to authorize livestock grazing in a manner consistent with the Gila National Forest Plan (GNFP).
-
North Burros Continental Divide Trail
Construct or designate approximately 20 miles of Continental Divide Trail from the Redrock Road north to the Forest boundary near Mangas Springs. Approximately 16 miles will be new trail construction.
-
North Palomas Allotment Environmental Assessment
This EA will reauthorize a suitable level of livestock grazing for th North Palomas Allotment that meets all laws and regulations and the Gila Forest Plan.
-
Outfitter and Guide Permits Reissuance
Reissuance of 3 expired priority outfitter/guide permits for the activities including hunting, horseback riding, and drop camps across the entire Gila NF.
-
Outlet of Saliz Watershed Improvement Project
The project proposal is to decommission a 1/2 mile of 2-track road and to treat approx. 800 acres with mechanical treatment and prescribed fire. Project will help improve watershed conditions and wildlife habitat.
-
Penny Pines Program - Black Range RD
Hillsboro Garden Club, under the Nat'l Garden Clubs MOU, with help from volunteers, students, NGOs etc. will work with District, to plant trees in locations severely burned in 2013 Silver fire with native trees in upland and riparian areas
-
Phyllis McKeen (WS Ditch) Special Use Permit
Issue a special use permit for the access and maintenance of the existing WS Ditch (i.e. ditch, sand traps, and pipeline)
-
Pierce Driveway Special Use Permit
Due to an erronous private survey, along the common boundary of private and NFS land, the owner of the property constructed a driveway, buried a water pipeline and constructed some buildings of which part of them entered the NFS land.
-
Pine Canyon-Spar Hill Mineral Exploration
Mineral specimen exploration and recovery from lode mining claims in proposed project area.
-
Pine Lawn Fire Salvage
Salvage of Dead and dying trees on approximately 250 acres along US Hwy 180, Leggett Loop road - FS roads 33, 4040M, 4040N, 4180 F, 4317I, 4317J, 4317 K, 650, fences, and utility lines. Salvage will include harvest of fire damaged trees.
-
Quemado Lake Estates Emergency Egress
Construction of road to provide egress out of subdivision in the event of wildfire.
-
Quemado RD Outfitter/Guide issuance of existing or expired special use permits
Issuance of special use permit to enable continued use of Gila NFS lands by Outfitter/Guides to conduct business operations assisting the public hunting big game species in compliance with Forest Plan and applicable laws and regulations.
-
Radar Brushy Forest and Woodland Health Project
The project is to treat approx. 3,000 ac including WUI around private land and the Radar Brushy electronic FAA site. The areas has been identified as being at risk for high fuel loads and tree mortality related to insect and disease.
-
Rancho Grande Water Association Water System Addition
Proposed to add a 2nd buried water pipeline from private property to existing freshwater storage tank. Pipeline is approximately 615 linear feet in length.
-
Realignment of WNMTC Fiber Optic Telephone Cable along NMSH #12 at SU Canyon, west of Reserve, NM
Due to a replacement construction project of the NMSH #12 bridge #3446 which crosses SU Canyon, the existing WNMTC fiber optic cable, which is currently located on the bridge needs to be moved out of the area of construction.
-
Red Rock Gravel Pit
Issue a special use permit to Grant County for gravel production for county road maintenance within the Burro Mountains using material from the Red Rock Gravel Pit
-
Reissuance of existing and expired Term Permits for Outfitter & Guides.
Reissuance of expired term permits for five outfitter operations.
-
Reserve Airport Well/Septic/RV Pad
Modification of existing permit to approve a well installation and associated improvements including septic system and leach field; and to level and gravel a pad for vehicle parking.
-
Restoration of Rio Grande Cutthroat Trout in the Animas Creek Watershed
Contribute to conservation of Rio Grande cutthroat trout by restoring it to approximately 30 miles of interconnected stream habitat in the Las Animas Creek watershed.
-
Road Easement - FSR 4185T
Reissuance of an expired road easement to private land via Forest Road 4185 T
-
Road Easement FSR 4001U
Reissue road easement for FSR 4001U
-
Rock Well Development
Drill a well and development new water for year-round wildlife and seasonal cattle use. Includes well, pipeline, and troughs.
-
Romero Creek and South Fork Negrito Bridge Replacements
In coordination with Federal Highways Admin (FHA), FHA is proposing to replace the Romero and South Fork Negrito bridges due to deterioration and safety concerns.
-
Royal John Wildlife Improvement
The project would consist of constructing 1/2 mile of road to access and maintain two waters locted in Donahue and Hot Springs Canyon. The waters have not been maintained in several years due to road access being blocked.
-
Sacaton Airstrip Facility Improvements
Proposal is to develop the Rain Creek Trailhead parking area & improve experience of visitors to Sacaton Airstrip and Rain Creek Trailhead. Proposal includes single vault toilet & shaded picnic area. NOTE:OCT 6th-Extended comment period on proposal.
-
Sacaton Wildlife Habitat Improvement
Project will consist of prescribed fire in the Sacaton area in Little dry to reduce risk of high-intensity wildfires. Reduction of fuel loading will aid in improving wildlife habitat such as browse for deer & disrupt fuels adjacent to T&E habitats.
-
Sacred Wind Fiber Optics Special Use Permit Issuance
Issue a Special Use Permit for installation of fiber optic line attached to existing utility line infrastructure in Sierra County, NM
-
Salt Lick Landscape Project
Treat approx. 4840 ac of historic grassland habitat being encroached by pinon juniper and ponderosa pine. Provide a wider corridor between Collins Park & Plains of St. Augustin to facilitate pronghorn antelope movement and habitat restoration.
-
Sierra Electric Cooperative Powerline Reroute
Sierra Electric Cooperative, Inc. has applied to modify their permit to construct and operate 0.8 miles of re-routed segment of the powerline across NFS lands and upgrade the entire line to 14.4Kv. The old poles and lines would be removed.
-
Signal Peak Challenge Mountain Bike Race
Issuance of special use permit for the annual Signal Peak Challenge Mountain Bike Race event on the Silver City Ranger District.
-
Signal Peak Trailhead Improvement
Construct a formal trailhead for the Signal Peak Trail and construct a re-route to connect the trailhead to existing trail system
-
Silver City Malone-Walnut-Fire
The Silver City Ranger District has identified abandoned mine sites that pose a threat to public safety and Forest Service personnel. These sites will be covered either by backfilling or using bat friendly gates.
-
Silver City R.D. Continental Divide Trail Improvements
Reroute 9 segments (approx. 19 miles) of Continental Divide Trail on Silver City RD. Reroute segments that currently overlap motorized roads and trails; and reconstruct/realign segments to Trail Class 2 design and address resource concerns
-
Silver City RD Trailhead/Parking Improvements
Currently, many of the district trail access points, lack such things as basic directional signs, information kiosks, infrastructure, or clearly defined parking. Resource impacts have been identified, so proposal is begin implementing improvements.
-
Simplex #1 Mineral Prospecting and Motorized Access Proposal
Mining claim owner proposes to use existing closed routes to access via ATVs to prospect unpatented claim near Twin Sisters. Hand tools used for prospecting/reinforcing existing adit. Site will be camped a couple of weekends/month from May to Oct.
-
Slaughter Mesa Restoration
Restore Wildlife habitat while improving watershed conditions and reducing hazardous fuels.
-
Snow Lake Enhancement (RAC)
Reduce sediment entering lake and improve water quality by planting riparian, constructing sediment retention structures. Improve boat ramp to prevent undercutting by wave action. Reduce erosion along existing gullying by installing small rock dams
-
Socorro Electric Powerline Extension to Private Land
Allow Socorro Electric to add approx. 1 miles of standard above ground powerline on Forest Lands along County Road A010 to provide power to a private land inholding. Work would include removal of vegetation and digging holes for poles.
-
South Fork Allotment
Re-authorization of livestock grazing within the South Fork Allotment on the Black Range Ranger District of the Gila National Forest.
-
South Fork Negrito Campground Relocation
Propose to decommission flood damaged South Fork Negrito CG and relocate outside of existing floodplain.
-
Special Use Permit Issuance - T-Mobile West LLC (Quemado Ranger District)
Issue a special use permit to T-Mobile West LLC, for a proposed new communication site to be installed within the Fox Mountain Communication Site.
-
Special Use Permit-Pipeline & Tank; Road Easement-FSR4020M
Reissue of expired SUP to authorize the continued occupancy, use and maintenance of the pipeline, storage tank, Road Easement for FSR 4020M to access private land
-
Special Use Permits - Reissuance; Quemado Ranger District
Purpose is to re-issue existing non-recreation special use permits to allow for continued use of facilities and roads permits within the Quemado Ranger District.
-
Sprint Nextel Communication Facility on the Jack's Peak Communication Site
Placement and use of communication equipment on the Jack's Peak Communication Site
-
Stateline Range NEPA
Re-authorize livestock grazing for allotments on Gila NF-Glenwood RD and on A-S NF-Clifton RD. The Clifton RD allotment decisions can be found at: https://www.fs.usda.gov/project/?project=57226
-
Stewart Well Project
Develop a water source site for wildlife which includes well, open trough drinker with escape ramp, storage tank and fence placement to protect infrastructure and limit vehicle access.
-
Sugar Loaf Exploratory Drilling
Bonaventure Inc has proposed to drill approximately 11 drill pads within the Burro Mountains for mineral exploration. Drill holes would be approx. 300 feet deep. Project is located in previous disturbed mining area.
-
TEP Powerline Vegetation Treatment and Access Route
Treatment of vegetation that occurs in and adjacent to utility powerline corridor and identification for access routes to conduct maintenance activities.
-
Tour of the Gila Road Bike Recreation Event
Issue a 5 year term recreation event permit for Tour of the Gila for use of one rest stop at intersection of US Hwy 180 and NM Hwy 159 and stage finish area along NM Hwy 159 on the Glenwood RD.
-
Truett and Canovas Creek Paleontological Excavations
Excavations of paleontological sites.
-
Trujillo Thinning for Wildlife Habitat Improvement
Thin dense stands of pinyon/juniper to create openings in the canopy to promote increased herbaceous growth.
-
Tucson Electric Power Co. Enhancement of the Existing Communication Site on Fox Mountain
TEP proposes to replace the existing 20' microwave tower with a 120' tower. Along with this, two new antennas and communication radios will replace the existing equipment. The new tower will have a new concrete pad. The old equipment will be removed.
-
Tucson Electric Power Company Permit Reissuance
Reissue as one master special use permit, the individual permits for utility corridor access and maintenance for two transmission lines in Quemado, Glenwood and Reserve.
-
Tularosa Interpretive Trail
Developing an interpretive trail from FR4161C to the Tularosa River area.
-
Tularosa Riparian Enhancement
Riparian enhancement by planting riparian species along Tularosa R. corridor, construct riparian exclusion fence outside of floodplain to protect riparian and wildlife habitat, and construct water system for wildlife & livestock outside the exclosure
-
Upper Cherry Creek Wet Meadow Habitat and Enhancement Project
The wet meadow has been affected by flows from areas burned by the 2014 Signal Fire and 2020 Tadpole Fire. This project is to hydrologically stabilize the meadow, rewet the site, and restore riparian vegetation to the system.
-
Upper Mimbres In-Stream Restoration Project (Cooney)
Using local, native materials, build in-stream structures and bank structures to slow water speed, encourage sediment deposition, and restore meander to stream channel. This would enhance and protect native fish habitat.
-
Upper Mimbres Landscape Assessment
To improve watershed conditions, range improvement, improve wildlife habitat, and reduce hazardous fuels.
-
V + T Environmental Assessment
Re-authorization of livestock grazing within the V+T allotment on the Black Range Ranger District of the Gila National Forest.
-
Verizon Wireless Permit Amendment (Brushy Mountain Communication Site)
Propose to install a 40 foot extension to existing 124 ft monopole on existing permitted site on Brushy Mountain. Most helpful to receive comments on the project by September 16, 2022.
-
Vigil Springs Wetland Restoration and Riparian Habitat Improvement Project
Restoration of wetland and riparian habitat associated with springs.
-
Village of Reserve Water System Upgrade
Buriial of a second 6" pipeline to be routed alongside the existing permitted pipeline and placement of an additional water storage facility, having a 350,000 gallon capacity.
-
Wagon Wheel Lane Road Easement
Re-issuance of a special use permit for a road easement located within the Wagon Wheel Lane Neighborhood Association. Easement allows for access to the subdivision for multiple landowners.
-
Wallow Roadside Hazard Tree Removal / Salvage Project
Salvage of merchantable of roadside hazard trees.
-
Wallow Wildfire Area - Site Preparation for Reforestation and Salvage
Cut all dead and dying trees on approx 180 ac of high and mod intensity burn areas within the 15,370 ac of the Wallow Fire. The objectives of this project are to facilitate reforestation & utilize the burned trees.
-
Wanek Private Land Access
Construction and issuance of a road easement to a private piece of property in exchange for a public easement across private land along an existing road for public recreation access.
-
Wedgewood Allotment
Re-authorize livestock grazing in the Wedgewood Allotment on the Black Range Ranger District of the Gila National Forest.
-
Western New Mexico Telephone Copperas Communcation Site
Amend existing communication site permit to add the following proposed improvements: generator, 1000-gallon propane tank, & fencing around each improvement. Per safety guidelines, propane tank will be placed more than 100ft from existing facilities.
-
Western New Mexico Telephone; Radar Brushy Communication Site
Proposal is to issue a SUP to WNMT for a 2nd communication site on Radar Brushy. Site proposal includes adding a generator & propane tank to an existing tower site & enclose area with a fence. Would be a backup system for 911 and FAA systems.
-
White Signal / Ferguson Mountain Range NEPA
Authorize grazing on White Signal / Ferguson Mountain Range Allotments
-
Whitewater Creek Gila Trout Habitat Restoration Project
Project is to improve habitat for Gila Trout by stabilizing eroding banks, constructing large pools for overwintering and planting riparian vegetation for creek shading.
-
Whitewater Creek Gila Trout Recovery Project
Due to post-fire flooding and ash flows fish were nearly eliminated from whitewater creek and tributaries. This project would restore native fish including Gila trout, speckled dace,Sonora and desert sucker to approx 24 miles of stream
-
Whitewater-Baldy Hazard Tree Removal
Reserve and Glenwood district removal of hazard trees.
-
Wilderness Ranger District PJ Restoration Project
Improve wildlife habitat for mule deer, elk and other native wildlife species and restore historic tree species composition, reduce juniper on the pinyon-juniper grass savanna, reduce understory juniper to achieve healthy woodlands on 5567 ac.
-
Willie Steele Trail Re-Route
Close trail segments of the Willie Steele that access private land and construct approx. 0.5 mile of trail around private land providing access entirely on forest lands. Escondido Trail re-route has been removed & will be revisited at a later date.
-
Willow Creek Fish Barrier
NM Dept. of Game and Fish has proposed constructing a fish passage barrier on Willow Creek to prevent the upstream movement of nonnative trout and protect an establish Gila trout population.
-
Willow Creek Stream Restoration
Willow Creek supports a recovery population of Gila trout & listed under the Clean Water Act Sec303d for temperature & aluminum. The project consists of installing structures made of native sourced materials that improve riparian & stream condition.
-
Willow Thinning and Rx
The Silver City Ranger District is proposing to improve timber stand and wildlife habitat by reducing natural fuels on approximately 3,422 acres in the Willow Fuelwood area located southwest of the oak grove subdivision.
-
Zirkle & Darnell Special Use Road Access
The Zirkles would like to acquire NFSR #4184M as their private land access road to their private property. Evaluate access needs across existing road 4184M or 4011L; private property through Zirkle; or road construction to access Darnell property.