Projects
Get Involved
Schedule of Proposed Actions (SOPA)
The SOPA for the Nebraska National Forests & Grasslands shows the NEPA projects we are planning, working on, or have finished.
Objections
When people disagree with a project, they can "object" to it. This page shows the Forest Service's objection responses for the Rocky Mountain Region.
Nebraska National Forest Project Archive
-
64" Trails Project
The Pine Ridge Ranger District is proposing to expand 25.4 miles of <50" trail and 8.7 miles of motorcycle trail to accommodate off-highway vehicle's (OHV) <64".
-
Application for Permit to Drill & Surface Plan of Operation Alkali Fed 2-33 & Alkali Fed 3-33
Drilling of one exploratory oil well to depth of 3750' and one re-entry to 3708'. Re-entry is previous Piggy Wig Well. Includes construction of 950' of new road and 150' x 240' well pad on Alkali Fed 2-33 and 100' x 40' pit on Alakali Fed 3-33.
-
Application to permit to Drill & Surface Plan of Operation Alakali Federal 11-33
Drilling of one exploratory oil well to depth of 3850 ft. Includes constrution of 140' x 220' well pad.
-
Aristocrat, West Ash, & Coffee Mill Butte Fire Reforestation Project
Hand plant 112 container ponderosa pine seedlings throughout & near various areas where forest fires consumed ponderosa pine forested stands & their seed source. Approximately 50-200 seedlings/ac would be planted depending on terrain & microclimates.
-
Avalanche 1-16 Access Road
Road Access Permit to reach oil and gas well pad on adjacent state property.
-
Bessey Complex Drainage, Warehouse, Greenhouse Construction
Construction of the following facilities: warehouse building, new road intersection at the Road 86B Spur for new shop access, new cooler/concrete slabs near the nursery packing shed, drainage catchment in the recreaton complex and four new greenhouse
-
Bessey Ranger District's Travel Managment Plan Review
Analysis of the effects of authorizing motorized travel on selected, existing user created routes on the Samuel R. McKelvie National Forest and the Bessey Division of the Nebraska National Forest.
-
Bessey Woody Encroachment Project
Removing Eastern red cedar from grasslands
-
Black -tailed Prairie Dog Management
To amend the LRMP to specify a desired range of acres of prairie dog colonies to meet various multiple use objectives, and to identify what actions may be taken if the acreage substantially falls below or exceeds the desired range.
-
Black-tailed Prairie Dog Conservation and Management
Conserving black-tailed prairie dogs while reducing unwanted prairie dog colonization on adjoining lands using a variety of tools and methods.
-
Blacktail Creek Land Exchange
A proposed land exchange between the Buffalo Gap National Grasslands and White Ranch near Oelrichs, South Dakota. The purpose of the land exchange is to consolidate landownerships.
-
Bordeaux Area Access Improvement Project
Change designation of Forest Road 723 from Open to Highway Legal Only to Open to all Vehicles.
-
Bovee Fire Restoration
Bovee wildfire restoration and hazardous trees, snags and fuels reduction.
-
Bovee Fire Utility Reconstruction
Replacement of damaged utilities from the 2022 Bovee Fire within the Bessey Ranger District of the Nebraska National Forest.
-
Bovee, 201 East, Natick Fire Restoration Project
Removal of fire damaged timber, minor infrastructure repairs, and reduction of fuel loading to allow for future management actions.
-
Buffalo Gap (West Geographic Area) and Oglala National Grasslands Grazing RAMP
Analyze the grazing allotments on the Oglala NG and Buffalo Gap NG (West GA) to determine the difference between existing conditions and desired conditions, and make adjustments to implement the new Forest Plan direction.
-
Bulge #1-8
Analyze and disclose environmental effects that may result from implementing one vertical oil and natural gas well. Project includes proposed construction, drilling, completion, production and reclamation.
-
Cain Creek Land Exchange
A proposed land exchange between The Nature Conservancy, a Not for Profit Corporation and the Forest Service. The primary purpose of the Cain Creek Land Exchange exchange is to consolidate land ownership where private and National Forest System (NFS
-
Cheyenne River Area Range Allotment Management Plan
Range Allotment Management Plan
-
Crowe Dam Habitat Improvement
Prescribed fire within the Crow Dam pasture, designated a special plant and wildlife habitat area, to enhance native vegetation and reduce invasive and/or non-native grass species.
-
Development of Powerline Trailhead
Construct a 1-acre parking lot and trailhead for access to the motorized trail system.
-
East Branch War Creek Crossing
Construct rock reinforced ford in historic creek crossing, for USFS authorized use only, to reduce environmental impacts, stream degradation, and erosion to complete vegetation management activities.
-
Eastern Pennington County Waterlines and Stock Tanks EA.
This project proposes 6.37 miles of waterline and twelve water tanks on four grazing allotments in Pennington County, SD on the Wall Ranger District. New tank locations and pipelines will provide reliable water sources and management of resources.
-
Eastern Pennington Waterline Project
The project proposal includes installing approximately 9 miles of buried pipeline, including 11 permanent stock tanks and 2 meter pits from an existing West River/Lyman-Jones Rural Water Systems, Inc. meter pit on private property.
-
Eastern Red Cedar Encroachment Removal
Removal of invading eastern red cedar in areas identified on the Samuel R. McKelvie National Forest to improve timber stand and grassland health.
-
Fishing Access
The purpose of this project is to improve access to recreational fisheries. The project proposes installation of fishing pods, a boat dock, several boat ramps, and several road reroutes.
-
FPNG Special Use Road Permits Project
The Nebraska National Forests and Grasslands, Fort Pierre Ranger District, proposes to issue special use permits on four existing two-track, dirt roads to three private landowners who are land locked by Forest System lands.
-
Ft Randall Fiber Optic Special Use Permit Modification
Modify existing Special Use Permit to allow the crossing of an additional 4.5 miles of Buffalo Gap National Grassland along the East French Creek Road to replace aging copper facility and improve service
-
Hudson-Meng Water System
Drilling of a new replacement well
-
Indian Creek Land Exchange
Propose to Exchange 3801.38 acres of National Grassland in Custer County for 2956.50 acres of land in Pennington County and Jackson County owned by Dakota Partnership of Rapid City SD
-
Ingalls Apiary Permit
Plaqcement of 10-12 pallets of bee hives (4 hives to pallet) on 12 locations within the Buffalo Gap National Grassland
-
Kadoka South Fencing Improvement Project
Remove 3 miles of existing fence and replace with 1/4 mile of wildlife-friendly fence.
-
Kelly Land Exchange
The U.S. Forest Service is proposing to convey 632.95 acres to Don Kelly in exchange for 666.89 acres of private land. The private lands are located in Badlands National Park and would be conveyed to the USA, National Park Service.
-
Lower Booth Dam
This project is designed to reduce fine fuels before repairing Lower Booth Dam
-
McKelvie Woody Encroachment 2 Project
The purpose of this project is to restore and or maintain the functional ecological value of the native grasslands and hand-planted forests in the Samuel R. McKelvie National Forest.
-
Motorized Access to Chat Canyon Wildlife Management Area
Proposes to add 1/2 mile of road to the MVUM for the Samuel R. McKelvie National Forest for the purpose of accessing the Chat Canyon Wildlife Management Area, owned and operated by Nebraska Game and Parks Commission.
-
Motorized Trail Width Project
A proposal to designate the existing motorized trails for vehicles 64 inches wide or less. It is currently 50 inches wide or less.
-
Murdo Fiber Optic Special Use Permit
Installation of fiber optic line within the boundaries of the Fort Pierre National Grasslands. Installation will occur within the existing road right-of-way.
-
Nebraska National Forest Travel Management
Update: The Forest will produce one EIS with one decision for all affected units. The decision will be made by the Forest Supervisor instead of individual District Rangers, as previously planned.
-
Nebraska State 4-H Camp Special Use Permit Modification
Modification of the Nebraska State 4-H Camp's Special Use Permit to include the development and use of a zipline as a part of the camps activities.
-
Oglala National Grassland Dam Repairs and Enhancements
Repair and protect Agate, Rock Bass and Bordgate Reservoirs in order to enhance riparian and pond habitat on the Oglala National Grassland.
-
Pine Ridge Landscape Restoration II
vegetation treatments on approximately 19,200 acres of Forest Service land within the Pine Ridge Ranger District. Treatments would include prescribed fire, thinning, understory vegetation control, meadow and riparian enhancement.
-
Pine Ridge Landscape Restoration Project
The project is largely aimed at improving undesired conditions created by the 2006 Spotted Tail Fire and the 2012 West Ash Fire and reducing the threat of stand-replacing wildfires in those few areas not impacted by those large wildfires.
-
Pine Ridge Trail Additions
construct 4 miles of trails in order to enhance public access and recreational opportunities on the Pine Ridge Ranger District.
-
Pinnacles Dispersed Recreation Management
Manage recreational opportunities while continuing to protect natural, cultural, and recreational resources in the Pinnacles area.
-
Prairie Restoration Research Project
Approximately 50% of the Grassland is now dominated by invasive, cool-season exotic grasses, particularly smooth brome and Kentucky bluegrass. The proposed project aims to identify techniques to restore a dominance of native vegetation on the FPRD.
-
Range Fiber Optic Line
Placement of new fiber optic lines using duct system and hand holes. Placement would primarily be within existing SD Department of Transportation and County right-of-ways with small portions intersecting USFS property.
-
Red Shirt Water Line Project
Install 1.25 miles of underground water line and one permanent stock tank.
-
Richland Dam Project
The proposed action is to install one or two vault restrooms at Richland Dam
-
Richland Dam Repair
The purpose of this project is to repair years worth of erosion damage done to the grade and spillway which currently is jeopardizing the dam's stability.
-
Roberts Tract Reforestation Project
The purpose of this project is to reforest the Roberts Tract area of the Pine Ridge Ranger District with ponderosa pine seedlings. This area was hit with two large fires in the past which have changed the landscape from forest to grassland.
-
Roundtop Reforestation Project
Ther purpose of this project is to reforest the roundtop/eagle eye rock area of the Oglala National Grassland with pine seedlings. This area burned during the 2012 Douthit wildfire.
-
Samuel R. McKelvie National Forest Range Allotment Management Plan
Determine the difference between existing and desired conditions on all grazing allotments on the SR McKelvie NF and implement grazing strategies to move toward desired conditions as outlined in the Forest Plan.
-
Sand Creek Land Exchange
The Forest Service proposes a land exchange of approximately 760 acres of national grassland located in Sioux County for 800 acres of land in Sioux and Dawes County owned by Walter Whitcher of Buffalo Gap National Grassland.
-
Sand Creek Russian Olive Project
Russian olive will be removed mechanically or by hand. All cut trees will be piled and burned.
-
Simms # 11 & 12
Analyze and disclose environmental effects that may result from implementing two vertical oil and natural gas wells in previously authorized locations. Project includes proposed construction, drilling, completion, production and reclamation.
-
South Core Reservoir 2 (SCRes2) Improvements Project
Permitting the construction of a 2,000,000-gallon inground storage reservoir by the Bureau of Reclamation.
-
Southwest Fence Relocation and Waterline Project
Install 3.6 miles of water pipeline with 5 stock tanks, move one existing fence from Lower Booth Dam north of FSR 227 and convert an electric fence to barbwire in the Camp Flat Allotmen all in the southwest corner of the Fort Piere National Grassland
-
Special Use Permits: Wall Ranger District Highway 73 Improvements
Issue 3 special use permit amendments to perform shoulder work on Highway 73, which results in the need to move a fiberoptic cable and a water line that serves the Oglala Sioux Tribe.
-
Steer Creek Corral Project
Construct an 8-pen corral at the Steer Creek Campground.
-
Stony Butte Project EA
Authorize use of prescribed burning and mowing as well as installing additional water sources to improve vegetative composition and structure. Authorize new access routes to fishing ponds and creation of a new parking area.
-
Tear Drop # 1-9
Analyze and disclose environmental effects that may result from implementing one vertical oil and natural gas well. Project includes proposed construction, drilling, completion, production and reclamation.
-
Toadstool Campground Site Additions
Add 10 camp sites within the established campground area by adding gravel camping pads, fire rings, grills, picnic tables, and pavilions.
-
Transition to GovDelivery
Thank you for your continued interest in the projects occurring on your National Forests. The Nebraska National Forests and Grasslands has decided to utilize GovDelivery, an electronic messaging program that allows us to provide better communication with interested members of public like you. This new program allows you the ability to manage subscriptions to Forest Service project electronic mailing list(s) and access immediate electronic information to project documents. To sign up, please follow the link "Transition to GovDelivery" above. After you sign up, don't forget to click on the "Add Subscriptions" tab to select your areas of interest to ensure you are kept up to date on upcoming projects.
-
Wall Ranger District Plague Management Project
The US Forest Service is evaluating the potential use of multiple plague management tools which could be used on the Wall Ranger District to combat plague with the objective of enhancing black-footed ferret habitat, and for public health and safety.
-
West Ash Fire Reforestation Project
The reforestation and site prep work on 1873 acres on the Pine Ridge RD within the West Ash Fire 2012
-
Western Area Power Administration Right-of-Way Maintenance and Reauthorization Project
Update vegetation management activities along 278 miles of transmission lines located on NFS lands in Colorado, Nebraska, and Utah. These activities are intended to protect the transmission lines by managing for stable, low growth vegetation.