Projects

This page includes, in links listed below, information on projects which implement the Forest Plan. On some, public input is being sought, on others decision notices or environmental assessments on forest projects are posted. 

Wayne National Forest Current and Recent Projects

NEPA

  • Forest Plan Revision - Wayne National Forest

    The Wayne National Forest is initiating Plan Revision. This process begins with assessment, the first stage of the plan revision process. The assessment will compile information about ecological, social, and economic conditions in the planning area.

  • Haydenville Tunnel Safety Closure Project

    This project is intended to close an existing abandoned mine tunnel opening and repair areas of subsidence that pose a risk to the public on the Athens Ranger District.

  • Special Use Permit - Access Road

    This proposal would allow the construction of a 15 ft by 850 ft access road through Wayne National Forest lands to access private property

  • The Orphan Wells & Abandoned Mines Project

    A Forest-wide effort to address legacy effects associated with sub-surface mining and oil and gas drilling, this project would authorize mine safety closures, stream capture re-routes, and orphan well plugging in cooperation with partners.

  • Washington Township Special Use Permit Request

    Washington Township is requesting the use of about 0.2 acres outside of the existing right-of-way along Twp 307 for access while a bridge is being replaced.

Project Archive

Some of our older projects can be accessed in our Project Archive.

Highlights