Liberty Utilities Resilience Corridors
Approximately 6,300 acres, the project consists of vegetation treatments in 55 miles of forest corridors adjacent to Liberty Utility power lines. These treatments would occur in untreated areas and would also connect previously treated areas.
Project Summary
Location Summary:
Please see project maps
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 04/19/2019 |
| Decision | 10/2019 (Estimated) |
| Implementation | 12/2019 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.3 (4)
Special Authority:
Lake Tahoe Basin Hazardous Fuel Reduction Projects (P.l. 111-8 Sec. 423)
Lead Management Unit:
Lake Tahoe Basin Mgt Unit
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Fuels Management; Vegetation Management (Other Than Forest Products)
Project Activity:
Electric Transmission; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
Current Status:
Completed
Project Decision Information
Liberty Utilities Resilience Corridors
Decision Signed Date: 10/07/2019
Forests:
Lake Tahoe Basin Mgt Unit
Districts:
Lake Tahoe Basin Mgt Unit
States:
California; Nevada
Counties:
Washoe; El Dorado; Placer
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Karen Vyverberg
35 College Drive
South Lake Tahoe, CA 96150
5305432626
kvyverberg@fs.fed.us
Last Updated: 10/28/2019