Cold Canal Vegetation Management
Reduce fuel loading and return stands to their historic structure while recovering biomass for local industry in the vicinity of the Canal Fire and Cold Springs.
Project Summary
Location Summary:
1989 Canal Fire Area and adjoining unburned area near Cold Springs
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 03/15/2010 |
Comment Period | 03/25/2015 |
09/16/2015 | |
Objection Period Start | 09/16/2015 |
Decision | 12/2015 (Estimated) |
Implementation | 02/2016 (Estimated) |
Expected Analysis Type:
Environmental Assessment
Special Authority:
Not Applicable / Other
Lead Management Unit:
Wallowa Valley Ranger District
Notice and Comment Regulation:
218 (2013) Non-HFRA
Project Purpose:
Fuels Management; Forest Products
Project Activity:
Fuel Treatments (Non-Activity Fuels); Special Products Sales; Timber Sales (Salvage); Timber Sales (Green)
Current Status:
Completed
Project Decision Information
Cold Canal Vegetation Management
Decision Signed Date: 12/03/2015
Forests:
Wallowa-Whitman National Forest
Districts:
Wallowa Valley Ranger District
States:
Oregon
Counties:
Wallowa
Legal Land Description:
T3S R46E and T4S R46E, WM
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Kris Stein
201 East Second Street
Joseph, OR 97846
208-879-4125
krisstein@fs.fed.us
Last Updated: 9/20/2018