Report Contents (click to jump to a section) : - Projects Occurring Nationwide - R2 - Rocky Mountain Region, Occurring in more than one Forest (excluding Regionwide) - R2 - Rocky Mountain Region, White River National Forest, Forestwide (excluding Projects occurring in more than one Forest) - R2 - Rocky Mountain Region, White River National Forest, Occurring in more than one District (excluding Forestwide) - R2 - Rocky Mountain Region, White River National Forest, East Zone/Dillon Ranger District (excluding Projects occurring in more than one District) - R2 - Rocky Mountain Region, White River National Forest, East Zone/Holy Cross Ranger District (excluding Projects occurring in more than one District) - R2 - Rocky Mountain Region, White River National Forest, West Zone/Aspen Ranger District (excluding Projects occurring in more than one District) - R2 - Rocky Mountain Region, White River National Forest, West Zone/Blanco Ranger District (excluding Projects occurring in more than one District) - R2 - Rocky Mountain Region, White River National Forest, West Zone/Rifle Ranger District (excluding Projects occurring in more than one District) - R2 - Rocky Mountain Region, White River National Forest, West Zone/Sopris Ranger District (excluding Projects occurring in more than one District) | |||||
Projects Occurring Nationwide |
|||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
---|---|---|---|---|---|
Locatable Mining Rule - 36 CFR 228, subpart A. EIS |
- Regulations, Directives, Orders | On Hold | N/A | N/A |
Sarah Shoemaker 907-586-7886 sarahshoemaker@fs.fed.us |
Description: The U.S. Department of Agriculture proposes revisions to its regulations at 36 CFR 228, Subpart A governing locatable minerals operations on National Forest System lands.A draft EIS & proposed rule should be available for review/comment in late 2020
Web Link: http://www.fs.usda.gov/project/?project=57214 |
|||||
Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. LEGAL - Not Applicable. These regulations apply to all NFS lands open to mineral entry under the US mining laws. More Information is available at: https://www.fs.usda.gov/science-technology/geology/minerals/locatable-minerals/current-revisions. | |||||
Back To Top | |||||
R2 - Rocky Mountain Region, Occurring in more than one Forest (excluding Regionwide) |
|||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Xcel Energy Transmission and Distribution Authorization; Operation and Maintenance Plan Project CE |
- Special use management |
Developing Proposal Est. Scoping Start 12/2020 |
Expected:03/2021 | 05/2021 |
Matthew Custer 720-822-4321 mscuster@fs.fed.us |
Description: The Forest Service proposes to reauthorize approximately 293 miles of existing electric transmission line and 196 miles of electric distribution line; develop and implement a standardized O&M Plan for routine maintenance and vegetation management. | |||||
Location: UNIT - Conejos Peak Ranger District, Saguache Ranger District, Pawnee Ranger District, Clear Creek Ranger District, Sulphur Ranger District, South Park Ranger District, West Zone/Rifle Ranger District, East Zone/Dillon Ranger District, Boulder Ranger District, East Zone/Holy Cross Ranger District, West Zone/Sopris Ranger District, Leadville Ranger District, East Zone/Eagle Ranger District, Salida Ranger District, Pikes Peak Ranger District, Gunnison Ranger District. STATE - Colorado. COUNTY - Boulder, Chaffee, Clear Creek, Conejos, Eagle, Fremont, Garfield, Gilpin, Grand, Gunnison, Jefferson, Lake, Park, Rio Grande, Saguache, Summit, Weld. LEGAL - Not Applicable. Project located on applicable Xcel transmission and distribution lines on National Forests and Grasslands in Colorado,. | |||||
Back To Top | |||||
White River National Forest, Forestwide (excluding Projects occurring in more than one Forest) |
R2 - Rocky Mountain Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Natural Resources Conservation Service SNOTEL Special Use Permit Reissuance CE *UPDATED* |
- Special use management |
In Progress: Scoping Start 07/30/2020 |
Expected:12/2021 |
01/2022 |
Michael Braudis 970-404-3153 michael.braudis@usda.gov |
Description: White River National Forest (WRNF) Master Special Use Permit Reissuance to the Natural Resources Conservation Service (NRCS) for the operation and maintenance of 16 existing SNOTEL sites and 12 Snow Courses
Web Link: http://www.fs.usda.gov/project/?project=58579 |
|||||
Location: UNIT - White River National Forest All Units. STATE - Colorado. COUNTY - Eagle, Garfield, Gunnison, Pitkin, Rio Blanco, Summit. LEGAL - Multiple locations across the forest within Dillon, Eagle-Holy Cross, Blanco and Aspen-Sopris Ranger Disrricts. Multiple locations across the forest. | |||||
Realignment of FSR 747 Wearyman Road Project CE *NEW LISTING* |
- Wildlife, Fish, Rare plants - Watershed management - Road management |
In Progress: Scoping Start 10/15/2021 |
Expected:01/2022 |
06/2022 |
Melvin Woody 970-874-6661 melvin.woody@usda.gov |
Description: Construct a minor realignment of approximately 100 feet of FSR 747 Wearyman Road. The project would involve moving the road prism upslope just south of a large rock which is currently confining the road next to the streambed.
Web Link: http://www.fs.usda.gov/project/?project=60978 |
|||||
Location: UNIT - White River National Forest All Units. STATE - Colorado. COUNTY - Eagle. LEGAL - Not Applicable. The project is located along Wearyman Creek and FSR747 - Wearyman Road, east, northeast of Red Cliff, Colorado in T6S, R80W, Section 15, 6th P.M. | |||||
White River Aspen Management Project EA |
- Wildlife, Fish, Rare plants - Forest products - Vegetation management (other than forest products) - Fuels management |
In Progress: Comment Period Public Notice 02/19/2021 |
Expected:04/2022 |
06/2022 |
Shelby Limberis 970-827-5161 shelby.limberis@usda.gov |
Description: The WRNF is proposing to conduct vegetation management activities (mechanical and prescribed fire) within forest stands that contain aspen. Management would improve the resiliency of aspen forests to disturbance agents and improve wildlife habitat.
Web Link: http://www.fs.usda.gov/project/?project=59419 |
|||||
Location: UNIT - White River National Forest All Units. STATE - Colorado. COUNTY - Eagle, Garfield, Gunnison, Mesa, Moffat, Pitkin, Rio Blanco, Routt, Summit. LEGAL - Not Applicable. Treatments could occur in forests containing aspen that area within Forest Plan Management Areas 4.2, 4.23, 4.3, 4.32, 5.12, 5.13, 5.4, 5.41, 5.42, 5.43, 5.5, 7.1, 8.21, 8.25, and 8.32. | |||||
Back To Top | |||||
White River National Forest, Occurring in more than one District (excluding Forestwide) |
R2 - Rocky Mountain Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Berlaimont Estates Road Improvement Project EIS *UPDATED* |
- Special use management - Road management |
In Progress: Objection Period Legal Notice 09/25/2020 |
Expected:03/2022 |
04/2022 |
Leanne Veldhuis 970-471-1796 leanne.veldhuis@usda.gov |
Description: The Proposed Action would authorize Berlaimont to improve those existing segments of NFSR 774 and 780 as they lead up to the southeastern corner of the Berlaimont property from local public roads in Edwards.
Web Link: http://www.fs.usda.gov/project/?project=50041 |
|||||
Location: UNIT - East Zone/Holy Cross Ranger District, East Zone/Eagle Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - The project is within Sections 20, 29, 32, and 33 of Township 4 South, Range 82 West, 6th Principal Meridian, Eagle County, Colorado. Located north of Interstate 70 in the vicinity of Edwards, Colorado. accessed by National Forest System Roads (NFSR) 774 and 780. | |||||
Camp Hale Restoration and Enhancement Project EIS |
- Watershed management | On Hold | N/A | N/A |
Melvin Woody 970-874-6661 melvin.woody@usda.gov |
Description: The purpose of action is to improve aquatic, riparian, and wetland conditions in and along the Eagle River, maintain or improve recreation opportunities and facilities, and conserve historic values in the Camp Hale area.
Web Link: http://www.fs.usda.gov/project/?project=46121 |
|||||
Location: UNIT - East Zone/Holy Cross Ranger District, East Zone/Eagle Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - Township 7S, Range 80W, Sect. 3, 4, 9, 10, 14, 15, 16, 22, 23, 24, 25, 26, 27. The project area is located in the Camp Hale area, south of Red Cliff, and north of Tennessee Pass. | |||||
Back To Top | |||||
White River National Forest, East Zone/Dillon Ranger District (excluding Projects occurring in more than one District) |
R2 - Rocky Mountain Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Golden Horseshoe Trail Construction CE *UPDATED* |
- Recreation management |
In Progress: Scoping Start 07/01/2021 |
Expected:01/2022 |
06/2022 |
Cynthia Ebbert 970-262-3458 cynthia.ebbert@usda.gov |
Description: Proposal from Summit County to construct approximately 5.40 miles of multi-use non-motorized trails on National Forest System Lands within the Golden Horseshoe Special Use Permit (SUP) boundary.
Web Link: http://www.fs.usda.gov/project/?project=60148 |
|||||
Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. This project is located within the special use permit boundary (Golden Horseshoe) that is issued to Summit County Government. | |||||
Grizzly Peak Landslide Phase I Restoration CE *NEW LISTING* |
- Special use management | Completed | Actual: 10/07/2021 | 10/2021 |
Anna Bengtson 970-262-3454 anna.p.bengtson@usda.gov |
Description: Placement and grading of material from the Grizzly Peak landslide to re-contour an embankment and decommission an unauthorized non-system road on National Forest system lands.
Web Link: http://www.fs.usda.gov/project/?project=60920 |
|||||
Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. North side of Highway 6 about 0.6 miles from the A-Basin Ski Resort base area near the Last Chance Lot. | |||||
Hummingbird Road 4" Natural Gas Line CE *UPDATED* |
- Special use management |
In Progress: Scoping Start 08/18/2021 |
Expected:12/2021 |
06/2022 |
Anna Bengtson 970-262-3454 anna.p.bengtson@usda.gov |
Description: Replacing 150' of 50-year old 2-inch steel natural gas line with a 4-inch polyethylene natural gas line across two slivers of NFS lands along Hummingbird Road to provide adequate service to community.
Web Link: http://www.fs.usda.gov/project/?project=60655 |
|||||
Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. The proposed action crosses two slivers of NFS lands located along Hummingbird Road in Breckenridge, CO. | |||||
Lake Hill Communications Site AT&T FirstNet Microwave Antenna CE *NEW LISTING* |
- Special use management |
In Progress: Scoping Start 10/01/2021 |
Expected:12/2021 |
01/2022 |
Anna Bengtson 970-262-3454 anna.p.bengtson@usda.gov |
Description: Installation, operation, and maintenance of a 6'-diameter microwave antenna associated with FirstNet on the existing AT&T tower at the Lake Hill Communications Site.
Web Link: http://www.fs.usda.gov/project/?project=60985 |
|||||
Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. Lake Hill Communications Site located off the Dillon Dam Road about 1 mile southwest of the intersection with Highway 6 in the Town of Dillon. | |||||
Ruby Ranch Fuels Reduction CE *UPDATED* |
- Fuels management | Completed | Actual: 10/14/2021 | 06/2022 |
Kathleen Gray 970-401-1983 kathleen.gray@usda.gov |
Description: A proposed fuels reduction project to reduce the risks and repercussions of a wildfire escaping the Eagles Nest Wilderness and posing a threat to community safety and private and public infrastructure.
Web Link: http://www.fs.usda.gov/project/?project=59751 |
|||||
Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. The project is located within the Eagles Nest Wilderness adjacent to the Ruby Ranch subdivision in Silverthorne, Colorado. | |||||
Surprise Trail Reconstruction Project CE *UPDATED* |
- Recreation management |
In Progress: Scoping Start 05/12/2021 |
Expected:01/2022 |
06/2022 |
Cynthia Ebbert 970-262-3458 cynthia.ebbert@usda.gov |
Description: Reconstruction of approximately 1.5 miles of the Surprise Lake Trail in the Eagles Nest Wilderness. This segment is extremely steep and is causing resource damage and soil erosion.
Web Link: http://www.fs.usda.gov/project/?project=60789 |
|||||
Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. This project is located within the Eagles Nest Wilderness Area on the Dillon Ranger District. | |||||
Swan Mountain Project EA *NEW LISTING* |
- Vegetation management (other than forest products) - Fuels management - Watershed management |
In Progress: Comment Period Public Notice 10/15/2021 |
Expected:06/2022 |
06/2022 |
Ashley Nettles 970-262-3457 ashley.nettles@usda.gov |
Description: Proposed activities include a mixture of fuels reduction, wildlife habitat improvement, stream improvement, transportation improvement and trail enhancements.
Web Link: http://www.fs.usda.gov/project/?project=60771 |
|||||
Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. The Swan Mountain Project encompasses approximately 12,300 acres of National Forest System lands in and around Swan Mountain, Soda Creek, and the Swan River. | |||||
Back To Top | |||||
White River National Forest, East Zone/Holy Cross Ranger District (excluding Projects occurring in more than one District) |
R2 - Rocky Mountain Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Gypsum Creek Bridge Replacement CE *NEW LISTING* |
- Special use management - Road management |
In Progress: Scoping Start 10/27/2021 |
Expected:03/2022 |
04/2022 |
Marcus Dreux 970-468-5400 marcus.dreux@usda.gov |
Description: Xcel Energy has proposed to replace a bridge over Gypsum Creek at the Cottonwood-Gypsum Creek Rd intersection to accommodate maintenance vehicle weight. This non-Forest System Road provides access to Xcel Transmission Lines and private land.
Web Link: http://www.fs.usda.gov/project/?project=60999 |
|||||
Location: UNIT - East Zone/Holy Cross Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - Not Applicable. NE1/4, NE1/4, Sec 16, 6S, 85W, 6th PM. | |||||
Holy Cross Energy (HCE) Avon-to-Gilman Electric (115-kV) Transmission Line EA |
- Special use management |
In Progress: Comment Period Public Notice 09/03/2021 |
Expected:03/2022 |
06/2022 |
Carole Huey 970-945-3219 carole.l.huey@usda.gov |
Description: Holy Cross Electric Association, Inc.,(HCE) proposes to construct a new 115-kV transmission line between the existing Gilman and Avon Substations. The proposed route is 8.9 miles and would cross approximately 3.4 miles of National Forest System Lands
Web Link: http://www.fs.usda.gov/project/?project=57224 |
|||||
Location: UNIT - East Zone/Holy Cross Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - Townships 5 South - 81 West and 6 South - 81 West, 6th Principal Meridian, Eagle County, Colorado. The right-of-way would run southeasterly from the substation in the Avon / Eagle-Vail area, through the town of Minturn, and terminate at the substation just above Gilman. | |||||
Mill Creek Trail Reroute, Vail Uphill Trail and North Trail Connector Construction Project CE *NEW LISTING* |
- Recreation management |
Developing Proposal Est. Scoping Start 01/2022 |
Expected:04/2022 | 06/2022 |
Calen Orlowski 7195303953 calen.orlowski@usda.gov |
Description: The Mill Creek Trail Reroute creates a new trail to allow for the full restorative potential for the Mill Creek road project. The Vail Uphill trail creates a new summer uphill trail on Vail Ski Area. North Trail Connector connects the North Trail.
Web Link: http://www.fs.usda.gov/project/?project=61186 |
|||||
Location: UNIT - East Zone/Holy Cross Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - Not Applicable. The Mill Creek Trail and Vail Uphill Trail are within Vail Resorts Ski Area Boundary. The North Trail Connector is located on the north side of I-70 near the Town of Vail. | |||||
USGS Next Generation Water Observing System (NGWOS) Site CE *NEW LISTING* |
- Special use management - Research and Development |
In Progress: Scoping Start 10/29/2021 |
Expected:12/2021 |
12/2021 |
Marcus Dreux 970-468-5400 marcus.dreux@usda.gov |
Description: The USGS is proposing three temporary weather station sites on Holy Cross Ranger District. Each temporary site will consist of a 10 foot high weather station and an 8 foot by 9 foot weighing scale snow sensor with minimal soil disturbance.
Web Link: http://www.fs.usda.gov/project/?project=61014 |
|||||
Location: UNIT - East Zone/Holy Cross Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - Not Applicable. Chicago Ridge Site SW 1/4 of SW 1/4 of S5 T7S R79W Ptarmigan Site NE 1/4 of NE 1/4 of S30 T6S R79W Homestake Site SE 1/4 of NE 1/4 of S6 T7S R80W. | |||||
Back To Top | |||||
White River National Forest, West Zone/Aspen Ranger District (excluding Projects occurring in more than one District) |
R2 - Rocky Mountain Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Aspen Valley Land Trust (Chapmin Wright Marble Basecamp)Access Route CE *NEW LISTING* |
- Special use management |
In Progress: Scoping Start 12/01/2021 |
Expected:12/2021 |
01/2022 |
Michael Braudis 970-262-3481 michael.braudis@usda.gov |
Description: The project is to authorize use and maintenance of roughly 60 feet of an existing 2 track, 10-foot-wide route to the subject parcel located along the Lead King Basin Road (NFSR 315).
Web Link: http://www.fs.usda.gov/project/?project=61161 |
|||||
Location: UNIT - West Zone/Aspen Ranger District. STATE - Colorado. COUNTY - Gunnison. LEGAL - SE1/4 Sec.19, T.11 S., R. 87 W., 6th PM, Gunnison County. Located in the immediate vicinity of North Lost Trail Creek Trailhead, off of Lead King Basin Road (NFSR 315). The egress/ingress route is located at the ford for Lost Trail Creek, along the Lead King Basin Road (NFSR 315). | |||||
Mountain Comm #SOP371 Sunlight Peak Powerline Line Burial CE *UPDATED* |
- Special use management | Cancelled | N/A | N/A |
Michael Braudis 970-262-3481 michael.braudis@usda.gov |
Description: This project will replace the existing overhead power line supply with a buried power supply. A buried conduit and line system will be installed from the existing power pole to facilities operate under Sunlight Peak Communications Site Lease #SOP371.
Web Link: http://www.fs.usda.gov/project/?project=60163 |
|||||
Location: UNIT - West Zone/Aspen Ranger District. STATE - Colorado. COUNTY - Garfield. LEGAL - SW 1/4 Sec. 19, T.7 S., R. 89 W., 6th PM, Garfield Co.; Sunlight Peak Designated Communications Site. Top of designated communications site on Sunlight Peak in Garfield Co. | |||||
Snowmass Wildlife Center and Ski Patrol Headquarters Replacement Project CE *UPDATED* |
- Special use management |
In Progress: Scoping Start 08/25/2021 |
Expected:03/2022 |
07/2022 |
Monte Lutterman 970-404-3164 monte.lutterman@usda.gov |
Description: Aspen Skiing Company has proposed to remove and replace the 'Elk Camp Wildlife Center and Ski Patrol Headquarters' at Snowmass Mountain Resort.
Web Link: http://www.fs.usda.gov/project/?project=60687 |
|||||
Location: UNIT - West Zone/Aspen Ranger District. STATE - Colorado. COUNTY - Pitkin. LEGAL - Not Applicable. The proposed location is within the Special Use Permit area for Snowmass Mountain Resort, approx. same location as the existing structure. | |||||
Valley View Ajax, LLC Winter Over-the-Snow Access CE *NEW LISTING* |
- Special use management |
In Progress: Scoping Start 12/10/2021 |
Expected:12/2021 |
12/2021 |
Michael Braudis 970-262-3481 michael.braudis@usda.gov |
Description: Issuance of an authorization to make motorized over-the-snow travel for residential purposes within an area closed to winter motorized use except by permit per the 2011 Travel Management Decision
Web Link: http://www.fs.usda.gov/project/?project=61237 |
|||||
Location: UNIT - West Zone/Aspen Ranger District. STATE - Colorado. COUNTY - Pitkin. LEGAL - Not Applicable. This project occurs primarily within the areas commonly referred to as McFarlane Gulch/ Loushin's on Richmond Ridge, Aspen Mountain on groomed and maintained routes of Aspen Mountain Powder Tours. | |||||
Back To Top | |||||
White River National Forest, West Zone/Blanco Ranger District (excluding Projects occurring in more than one District) |
R2 - Rocky Mountain Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Hill Creek C&H Livestock Facility CE *UPDATED* |
- Grazing management |
In Progress: Scoping Start 11/06/2020 |
Expected:03/2022 |
06/2022 |
Mary Cunningham 970-878-5015 mary.cunningham@usda.gov |
Description: This project involves the construction of a corral with loading chute and a small 'beef pasture' (7 ac) for livestock ingress and egress to the Hill Creek C&H grazing allotment.
Web Link: http://www.fs.usda.gov/project/?project=59084 |
|||||
Location: UNIT - West Zone/Blanco Ranger District. STATE - Colorado. COUNTY - Rio Blanco. LEGAL - Not Applicable. Project is located T 2 S, R 90 W, Section 7 Accessible by Rio Blanco County Road 10, Peltier Trailhead Parking Lot. | |||||
Yellowjacket Project EA *UPDATED* |
- Forest products - Vegetation management (other than forest products) - Fuels management - Road management |
In Progress: Comment Period Public Notice 02/20/2020 |
Expected:05/2022 |
06/2022 |
Christopher McDonald 970-625-6856 christopher.mcdonald@usda.gov |
Description: The Blanco Ranger District is proposing approximately 2,300 acres of vegetation management activities within the Wilson Park, Sawmill Mountain and Ellison Mountain area.
Web Link: http://www.fs.usda.gov/project/?project=57654 |
|||||
Location: UNIT - West Zone/Blanco Ranger District. STATE - Colorado. COUNTY - Rio Blanco. LEGAL - Sec. 1-3, 10-15, 22-27, 34-36, T2N, R92W; Sec. 4-9, 17-20, 26-36, T2N, R91W; Sec. 1-3 and 12, T1N, R92W; Sec. 1-17, 20-24, 26-29, 32-34, T1N, R91W; Sec. 7, 18, 19 T1N, R90W, Rio Blanco Co. Proposed management activities would occur approximately 16 miles east-northeast of Meeker, Colorado within the vicinity of Wilson Park, Sawmill Mountain and Ellison Mountain,. | |||||
Back To Top | |||||
White River National Forest, West Zone/Rifle Ranger District (excluding Projects occurring in more than one District) |
R2 - Rocky Mountain Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Braun Hut System - Permit Renewal CE *NEW LISTING* |
- Special use management |
In Progress: Scoping Start 10/18/2021 |
Expected:12/2021 |
01/2022 |
Monte Lutterman 970-404-3164 monte.lutterman@usda.gov |
Description: Braun Hut System permit renewal for a new (10) year term. No changes to the use or intensity.
Web Link: http://www.fs.usda.gov/project/?project=60979 |
|||||
Location: UNIT - West Zone/Rifle Ranger District. STATE - Colorado. COUNTY - Gunnison, Pitkin. LEGAL - Not Applicable. Within Pitkin and Gunnison Counties. | |||||
Back To Top | |||||
White River National Forest, West Zone/Sopris Ranger District (excluding Projects occurring in more than one District) |
R2 - Rocky Mountain Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
El Jebel Administrative Site, Upper Parcel, Conveyance Project EA *UPDATED* |
- Land ownership management |
In Progress: Scoping Start 12/07/2016 Est. Comment Period Public Notice 02/2022 |
Expected:07/2022 |
08/2022 |
Jennifer Schuller 970-404-3163 Jennifer.Schuller@usda.gov |
Description: Proposal to convey a 30 acre parcel of land, & associated water rights/ mineral estate pursuant to the Forest Service Facility Realignment and Enhancement Act of 2005 P.L. 109-54; 16 U.S.C. 580d note, as amended by P.L. 112-74,Title IV, Sec.421.
Web Link: http://www.fs.usda.gov/project/?project=50663 |
|||||
Location: UNIT - West Zone/Sopris Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - Sixth Principal Meridian T. 8 S., R. 87 W. N1/2 of Sec. 3, NE1/4 NE1/4 of Sec. 4. The Upper Parcel is approximately 30 acres and consists of three residences, one mobile home pad, horse pastures. | |||||
Redstone to McClure Pass Trail EA |
- Recreation management - Special use management |
In Progress: Scoping Start 01/21/2020 Est. Comment Period Public Notice 11/2021 |
Expected:05/2022 |
06/2022 |
Shelly Grail 970-404-3155 shelly.grail@usda.gov |
Description: Pitkin County has proposed a native surface trail connecting Redstone with McClure Pass. The 5 mile section of trail on NFS would lie within the CDOT right of way or along the historic wagon road.
Web Link: http://www.fs.usda.gov/project/?project=56913 |
|||||
Location: UNIT - West Zone/Sopris Ranger District. STATE - Colorado. COUNTY - Pitkin. LEGAL - Not Applicable. Along CDOT Highway 133 right of way between Redstone and McClure or along historic wagon route. | |||||
Schlumberger Recreation Residence CE *UPDATED* |
- Special use management | Completed | Actual: 09/30/2021 | 11/2021 |
Mary Flynn 970-404-3173 mary.flynn@usda.gov |
Description: The Recreation Residence has been impacted by water and sediment from erosion. To mitigate this problem, a berm would be built to divert water away from the cabin.
Web Link: http://www.fs.usda.gov/project/?project=60820 |
|||||
Location: UNIT - West Zone/Sopris Ranger District. STATE - Colorado. COUNTY - Pitkin. LEGAL - Not Applicable. Township 8S, Range 85W, Section 25; Near Kobey Park and Cow Camp on the Aspen-Sopris Ranger District. | |||||
In accordance with Federal civil rights law and U.S. Department of Agriculture (USDA) civil rights regulations and policies, the USDA, its Agencies, offices, and employees, and institutions participating in or administering USDA programs are prohibited from discriminating based on race, color, national origin, religion, sex, gender identity (including gender expression), sexual orientation, disability, age, marital status, family/parental status, income derived from a public assistance program, political beliefs, or reprisal or retaliation for prior civil rights activity, in any program or activity conducted or funded by USDA (not all bases apply to all programs). Remedies and complaint filing deadlines vary by program or incident.
Persons with disabilities who require alternative means of communication for program information (e.g., Braille, large print, audiotape, American Sign Language, etc.) should contact the responsible Agency or USDA’s TARGET Center at (202) 720-2600 (voice and TTY) or contact USDA through the Federal Relay Service at (800) 877-8339. Additionally, program information may be made available in languages other than English. To file a program discrimination complaint, complete the USDA Program Discrimination Complaint Form, AD-3027, found online at http://www.ascr.usda.gov/complaint_filing_cust.html and at any USDA office or write a letter addressed to USDA and provide in the letter all of the information requested in the form. To request a copy of the complaint form, call (866) 632-9992. Submit your completed form or letter to USDA by: (1) mail: U.S. Department of Agriculture Office of the Assistant Secretary for Civil Rights 1400 Independence Avenue, SW Washington, D.C. 20250-9410; (2) fax: (202) 690-7442; or (3) email: program.intake@usda.gov. USDA is an equal opportunity provider, employer, and lender. |