Report Contents (click to jump to a section) : - Projects Occurring Nationwide - R2 - Rocky Mountain Region, White River National Forest, Forestwide (excluding Projects occurring in more than one Forest) - R2 - Rocky Mountain Region, White River National Forest, Occurring in more than one District (excluding Forestwide) - R2 - Rocky Mountain Region, White River National Forest, East Zone/Dillon Ranger District (excluding Projects occurring in more than one District) - R2 - Rocky Mountain Region, White River National Forest, East Zone/Holy Cross Ranger District (excluding Projects occurring in more than one District) - R2 - Rocky Mountain Region, White River National Forest, West Zone/Aspen Ranger District (excluding Projects occurring in more than one District) - R2 - Rocky Mountain Region, White River National Forest, West Zone/Blanco Ranger District (excluding Projects occurring in more than one District) - R2 - Rocky Mountain Region, White River National Forest, West Zone/Rifle Ranger District (excluding Projects occurring in more than one District) - R2 - Rocky Mountain Region, White River National Forest, West Zone/Sopris Ranger District (excluding Projects occurring in more than one District) | |||||
Projects Occurring Nationwide |
|||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
---|---|---|---|---|---|
Locatable Mining Rule - 36 CFR 228, subpart A. EIS |
- Regulations, Directives, Orders | On Hold | N/A | N/A |
Sarah Shoemaker 907-586-7886 sarahshoemaker@fs.fed.us |
Description: The U.S. Department of Agriculture proposes revisions to its regulations at 36 CFR 228, Subpart A governing locatable minerals operations on National Forest System lands.A draft EIS & proposed rule should be available for review/comment in late 2020
Web Link: http://www.fs.usda.gov/project/?project=57214 |
|||||
Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. LEGAL - Not Applicable. These regulations apply to all NFS lands open to mineral entry under the US mining laws. More Information is available at: https://www.fs.usda.gov/science-technology/geology/minerals/locatable-minerals/current-revisions. | |||||
Nationwide Aerial Application of Fire Retardant on National Forest System Land. EIS |
- Regulations, Directives, Orders |
In Progress: NOI in Federal Register 08/08/2020 Est. DEIS NOA in Federal Register 02/2022 |
Expected:06/2022 |
07/2022 |
Laura Conway 406-802-4317 laura.conway@usda.gov |
Description: Programmatic Supplemental EIS for the Nationwide Aerial Application of Fire Retardant on National Forest System Land.
Web Link: http://www.fs.usda.gov/project/?project=60450 |
|||||
Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. LEGAL - Not Applicable. The direction in the SEIS will apply to use of aerially delivered fire retardant on all National Forest System land. . | |||||
Back To Top | |||||
White River National Forest, Forestwide (excluding Projects occurring in more than one Forest) |
R2 - Rocky Mountain Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Natural Resources Conservation Service SNOTEL Special Use Permit Reissuance CE *UPDATED* |
- Special use management |
In Progress: Scoping Start 07/30/2020 |
Expected:09/2022 |
09/2022 |
Michael Braudis 970-404-3153 michael.braudis@usda.gov |
Description: White River National Forest (WRNF) Master Special Use Permit Reissuance to the Natural Resources Conservation Service (NRCS) for the operation and maintenance of 16 existing SNOTEL sites and 12 Snow Courses
Web Link: http://www.fs.usda.gov/project/?project=58579 |
|||||
Location: UNIT - White River National Forest All Units. STATE - Colorado. COUNTY - Eagle, Garfield, Gunnison, Pitkin, Rio Blanco, Summit. LEGAL - Multiple locations across the forest within Dillon, Eagle-Holy Cross, Blanco and Aspen-Sopris Ranger Disrricts. Multiple locations across the forest. | |||||
Realignment of FSR 747 Wearyman Road Project CE *UPDATED* |
- Wildlife, Fish, Rare plants - Watershed management - Road management |
Completed | Actual: 08/17/2022 | 10/2022 |
Melvin Woody 970-874-6661 melvin.woody@usda.gov |
Description: Construct a minor realignment of approximately 100 feet of FSR 747 Wearyman Road. The project would involve moving the road prism upslope just south of a large rock which is currently confining the road next to the streambed.
Web Link: http://www.fs.usda.gov/project/?project=60978 |
|||||
Location: UNIT - White River National Forest All Units. STATE - Colorado. COUNTY - Eagle. LEGAL - Not Applicable. The project is located along Wearyman Creek and FSR747 - Wearyman Road, east, northeast of Red Cliff, Colorado in T6S, R80W, Section 15, 6th P.M. | |||||
White River Aspen Management Project EA *UPDATED* |
- Wildlife, Fish, Rare plants - Forest products - Vegetation management (other than forest products) - Fuels management |
In Progress: Comment Period Public Notice 02/19/2021 |
Expected:03/2023 |
06/2023 |
Shelby Limberis 970-827-5161 shelby.limberis@usda.gov |
Description: The WRNF is proposing to conduct vegetation management activities (mechanical and prescribed fire) within forest stands that contain aspen. Management would improve the resiliency of aspen forests to disturbance agents and improve wildlife habitat.
Web Link: http://www.fs.usda.gov/project/?project=59419 |
|||||
Location: UNIT - White River National Forest All Units. STATE - Colorado. COUNTY - Eagle, Garfield, Gunnison, Mesa, Moffat, Pitkin, Rio Blanco, Routt, Summit. LEGAL - Not Applicable. Treatments could occur in forests containing aspen that area within Forest Plan Management Areas 4.2, 4.23, 4.3, 4.32, 5.12, 5.13, 5.4, 5.41, 5.42, 5.43, 5.5, 7.1, 8.21, 8.25, and 8.32. | |||||
White River National Forest Water and Riparian Resources Forest Plan Amendment CE *NEW LISTING* |
- Land management planning |
In Progress: Comment Period Public Notice 09/30/2022 |
Expected:01/2023 |
03/2023 |
Cary Green 970-390-3234 cary.green@usda.gov |
Description: Forest Plan Amendment to add a forest-wide standard to Chapter 2, Section One Physical, Water and Riparian Resources that supports the Army Corps of Engineers requirement within the Colorado Western Slope In Lieu Fee Final Instrument, Exhibit G
Web Link: http://www.fs.usda.gov/project/?project=62615 |
|||||
Location: UNIT - White River National Forest All Units. STATE - Colorado. COUNTY - Eagle, Garfield, Gunnison, Mesa, Moffat, Pitkin, Rio Blanco, Routt, Summit. LEGAL - Not Applicable. Forest-Wide. | |||||
Back To Top | |||||
White River National Forest, Occurring in more than one District (excluding Forestwide) |
R2 - Rocky Mountain Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Berlaimont Estates Road Improvement Project EIS *UPDATED* |
- Special use management - Road management |
In Progress: Objection Period Legal Notice 09/25/2020 |
Expected:11/2022 |
06/2023 |
Leanne Veldhuis 970-471-1796 leanne.veldhuis@usda.gov |
Description: The Proposed Action would authorize Berlaimont to improve those existing segments of NFSR 774 and 780 as they lead up to the southeastern corner of the Berlaimont property from local public roads in Edwards.
Web Link: http://www.fs.usda.gov/project/?project=50041 |
|||||
Location: UNIT - East Zone/Holy Cross Ranger District, East Zone/Eagle Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - The project is within Sections 20, 29, 32, and 33 of Township 4 South, Range 82 West, 6th Principal Meridian, Eagle County, Colorado. Located north of Interstate 70 in the vicinity of Edwards, Colorado. accessed by National Forest System Roads (NFSR) 774 and 780. | |||||
Camp Hale Restoration and Enhancement Project EIS |
- Watershed management | On Hold | N/A | N/A |
Melvin Woody 970-874-6661 melvin.woody@usda.gov |
Description: The purpose of action is to improve aquatic, riparian, and wetland conditions in and along the Eagle River, maintain or improve recreation opportunities and facilities, and conserve historic values in the Camp Hale area.
Web Link: http://www.fs.usda.gov/project/?project=46121 |
|||||
Location: UNIT - East Zone/Holy Cross Ranger District, East Zone/Eagle Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - Township 7S, Range 80W, Sect. 3, 4, 9, 10, 14, 15, 16, 22, 23, 24, 25, 26, 27. The project area is located in the Camp Hale area, south of Red Cliff, and north of Tennessee Pass. | |||||
Back To Top | |||||
White River National Forest, East Zone/Dillon Ranger District (excluding Projects occurring in more than one District) |
R2 - Rocky Mountain Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Buffalo South Willow Connect Trail Reconstruction Project CE *NEW LISTING* |
- Recreation management |
Developing Proposal Est. Scoping Start 04/2023 |
Expected:06/2023 | 06/2024 |
Tyler Kirkpatrick 970-262-3452 tyler.kirkpatrick@usda.gov |
Description: Proposal to decommission and restore .5 miles of unsustainable trail that provides a poor recreation experience. Existing trail will be replaced with a new 1 mile sustainable trail that provides for public safety and positive recreational experience.
Web Link: http://www.fs.usda.gov/project/?project=62644 |
|||||
Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. The project area is located a 1/2 mile from the Buffalo Cabin Trailhead. Township 5 South, Range 78 West, Southeast corner of the Southeast corner of Section 9. | |||||
Copper Mountain Resort Timberline Express Chairlift Replacement and Mountain Bike Trail Construction CE *NEW LISTING* |
- Recreation management - Special use management |
In Progress: Scoping Start 09/20/2022 |
Expected:12/2022 |
07/2023 |
Sarah Strehle 970 401-0863 sarah.strehle@usda.gov |
Description: Copper Mountain Resort proposes replacing the Timberline Express Chairlift and upgrading associated lift infrastructure. The project also includes constructing a downhill mountain bike park trail system accessed from the Woodward Express lift.
Web Link: http://www.fs.usda.gov/project/?project=62865 |
|||||
Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. Copper Mountain Resort, Summit County CO, SW intersection of I-70 and Hwy 91. | |||||
Hattie's Trail #9078 Realignment/Decommission CE *UPDATED* |
- Recreation management | Completed | Actual: 07/26/2022 | 09/2022 |
Tyler Kirkpatrick 970-262-3452 tyler.kirkpatrick@usda.gov |
Description: The proposed project would realign and construct approximately 2500 feet of new trail. Approximately 1000 feet of the existing trail would be decommissioned and restored to a natural state using best management practices.
Web Link: http://www.fs.usda.gov/project/?project=61715 |
|||||
Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. Adjacent to Frisco, Colorado near the Zacks stop trailhead, 0.5 miles from the trailhead heading south on the Peaks Trail #45. | |||||
Lost Dollar Mine Cabin Demolition CE *NEW LISTING* |
- Watershed management - Minerals and Geology |
In Progress: Scoping Start 06/01/2022 |
Expected:10/2022 |
10/2022 |
Cynthia Ebbert 970-262-3458 cynthia.ebbert@usda.gov |
Description: Demolish and partially remove the Last Dollar Mine Cabin and associated trespass items that are encroaching on National Forest System that pose a health and safety risk to recreationists on the forest.
Web Link: http://www.fs.usda.gov/project/?project=62715 |
|||||
Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. NW Section 26, Township 7 South, Range 78 West, 6th PM, Summit County, CO. | |||||
Shooting Range Prescribed Burn CE *UPDATED* |
- Recreation management - Vegetation management (other than forest products) - Fuels management |
In Progress: Scoping Start 04/19/2022 |
Expected:09/2022 |
10/2022 |
Eric Hughes 970-328-5891 eric.hughes@usda.gov |
Description: The Forest Service is proposing to use prescribed fire (broadcast burn) on approximately 44 acres near the Summit County Public Shooting Range for the purpose of the reducing fuel quantities to prevent potential future wildfire.
Web Link: http://www.fs.usda.gov/project/?project=61369 |
|||||
Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. The project is located in Section 15, Township 5 South, Range 77 West; east of the Summit County Public Shooting Range. Access is County Road 66, Keystone CO. | |||||
Snake River Water Conservation District (SRWD) Geotechnical Investigation CE *NEW LISTING* |
- Special use management | Completed | Actual: 07/27/2022 | 09/2022 |
Cynthia Ebbert 970-262-3458 cynthia.ebbert@usda.gov |
Description: Geo-technical investigations that will involve digging 10 test holes along the existing water transmission line in a road in order to obtain ground water and soils information for future replacement of the water line. | |||||
Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. NW 1/4 of Section 19, Township 5 South, Range 76 West and NE 1/4 of Section 24, Township 5 South, Range 77 West, 6th P.M. in Summit County, CO. | |||||
Spot Cash Cabin Demolition CE *NEW LISTING* |
- Watershed management - Minerals and Geology |
In Progress: Scoping Start 06/01/2022 |
Expected:10/2022 |
10/2022 |
Cynthia Ebbert 970-262-3458 cynthia.ebbert@usda.gov |
Description: Demolish an abandoned dilapidated mining cabin located near or immediately adjacent to heavily used Blue Lakes Road. The cabin poses a health and safety risk to recreationists on the forest.
Web Link: http://www.fs.usda.gov/project/?project=61973 |
|||||
Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. Spot Cash Cabin: Section 2, T. 8 S., R. 78 W., 6th P.M. Summit County, Colorado. | |||||
Summit Public Radio & TV Powerline Replacement and Realignment CE *UPDATED* |
- Special use management |
In Progress: Scoping Start 07/01/2022 |
Expected:09/2022 |
10/2022 |
Cynthia Ebbert 970-262-3458 cynthia.ebbert@usda.gov |
Description: Installation of buried electric power and fiber optic cable along a new alignment crossing roughly 4,432' of National Forest to replace an existing buried powerline serving Summit Public Radio and TV's broadcast site on Bald Mountain.
Web Link: http://www.fs.usda.gov/project/?project=60490 |
|||||
Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. West side of Bald Mountain near Breckenridge, Colorado in SE Section 4 and SW Section 3, Township 7 South, Range 77 West, Summit County. | |||||
Swan Mountain Project EA *UPDATED* |
- Vegetation management (other than forest products) - Fuels management - Watershed management |
In Progress: Scoping Start 10/08/2021 Est. Comment Period Public Notice 10/2022 |
Expected:03/2023 |
06/2023 |
Ashley Nettles 970-262-3457 ashley.nettles@usda.gov |
Description: Proposed activities include a mixture of fuels reduction, wildlife habitat improvement, stream improvement, transportation improvement and trail enhancements.
Web Link: http://www.fs.usda.gov/project/?project=60771 |
|||||
Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. The Swan Mountain Project encompasses approximately 12,300 acres of National Forest System lands in and around Swan Mountain, Soda Creek, and the Swan River. | |||||
XCEL Rectifier & Ground Bed Replacement- Straight Creek CE *NEW LISTING* |
- Special area management | Completed | Actual: 08/08/2022 | 09/2022 |
Cynthia Ebbert 970-262-3458 cynthia.ebbert@usda.gov |
Description: Replacement of existing infrastructure that includes rectifier unit and ground bed that is associated with the Straight Creek Tunnel 4 inch natural gas line that is under special use permit. | |||||
Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. Upper part of Straight Creek drainage near Eisenhower Tunnel and south of Interstate 70: Sec. 30, T.4S., R.76 W., 6th Principal Meridian. | |||||
Back To Top | |||||
White River National Forest, East Zone/Holy Cross Ranger District (excluding Projects occurring in more than one District) |
R2 - Rocky Mountain Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Booth Creek Fuels Treatment Project EA *UPDATED* |
- Fuels management |
In Progress: Scoping Start 03/04/2022 |
Expected:02/2023 |
03/2023 |
Eric Hughes 970-328-5891 eric.hughes@usda.gov |
Description: Proposed fuels reduction activities on National Forest System (NFS) lands within a 3,605-acre area near Vail, Colorado. Treatments correspond to areas identified within the Town of Vail Community Wildfire Protection Plan.
Web Link: http://www.fs.usda.gov/project/?project=61657 |
|||||
Location: UNIT - East Zone/Holy Cross Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - Not Applicable. North of Town of Vail, East of Red Sandstone Rd and West of Black Gore Creek Bridge on Interstate 70. The project extends roughly 1.5 miles north of the forest boundary. | |||||
Gypsum Creek Bridge Replacement CE *UPDATED* |
- Special use management - Road management |
In Progress: Scoping Start 10/27/2021 |
Expected:09/2022 |
10/2022 |
Marcus Dreux 970-468-5400 marcus.dreux@usda.gov |
Description: Xcel Energy has proposed to replace a bridge over Gypsum Creek at the Cottonwood-Gypsum Creek Rd intersection to accommodate maintenance vehicle weight. This non-Forest System Road provides access to Xcel Transmission Lines and private land.
Web Link: http://www.fs.usda.gov/project/?project=60999 |
|||||
Location: UNIT - East Zone/Holy Cross Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - Not Applicable. NE1/4, NE1/4, Sec 16, 6S, 85W, 6th PM. | |||||
Holy Cross Energy (HCE) Avon-to-Gilman Electric (115-kV) Transmission Line EA *UPDATED* |
- Special use management |
In Progress: Comment Period Public Notice 09/03/2021 |
Expected:02/2023 |
05/2023 |
Carole Huey 970-945-3219 carole.l.huey@usda.gov |
Description: Holy Cross Electric Association, Inc.,(HCE) proposes to construct a new 115-kV transmission line between the existing Gilman and Avon Substations. The proposed route is 8.9 miles and would cross approximately 3.4 miles of National Forest System Lands
Web Link: http://www.fs.usda.gov/project/?project=57224 |
|||||
Location: UNIT - East Zone/Holy Cross Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - Townships 5 South - 81 West and 6 South - 81 West, 6th Principal Meridian, Eagle County, Colorado. The right-of-way would run southeasterly from the substation in the Avon / Eagle-Vail area, through the town of Minturn, and terminate at the substation just above Gilman. | |||||
USGS Next Generation Water Observing System (NGWOS) Site CE *UPDATED* |
- Special use management - Research and Development |
Completed | Actual: 09/22/2022 | 09/2022 |
Marcus Dreux 970-468-5400 marcus.dreux@usda.gov |
Description: The USGS is proposing three temporary weather station sites on Holy Cross Ranger District. Each temporary site will consist of a 10 foot high weather station and an 8 foot by 9 foot weighing scale snow sensor with minimal soil disturbance.
Web Link: http://www.fs.usda.gov/project/?project=61014 |
|||||
Location: UNIT - East Zone/Holy Cross Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - Not Applicable. Chicago Ridge Site SW 1/4 of SW 1/4 of S5 T7S R79W Ptarmigan Site NE 1/4 of NE 1/4 of S30 T6S R79W Homestake Site SE 1/4 of NE 1/4 of S6 T7S R80W. | |||||
Back To Top | |||||
White River National Forest, West Zone/Aspen Ranger District (excluding Projects occurring in more than one District) |
R2 - Rocky Mountain Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Aspen Valley Land Trust (Chapmin Wright Marble Basecamp)Access Route CE *UPDATED* |
- Special use management | Completed | Actual: 07/14/2022 | 08/2022 |
Michael Braudis 970-262-3481 michael.braudis@usda.gov |
Description: The project is to authorize use and maintenance of roughly 60 feet of an existing 2 track, 10-foot-wide route to the subject parcel located along the Lead King Basin Road (NFSR 315).
Web Link: http://www.fs.usda.gov/project/?project=61161 |
|||||
Location: UNIT - West Zone/Aspen Ranger District. STATE - Colorado. COUNTY - Gunnison. LEGAL - SE1/4 Sec.19, T.11 S., R. 87 W., 6th PM, Gunnison County. Located in the immediate vicinity of North Lost Trail Creek Trailhead, off of Lead King Basin Road (NFSR 315). The egress/ingress route is located at the ford for Lost Trail Creek, along the Lead King Basin Road (NFSR 315). | |||||
Braun Hut System - Permit Renewal CE *UPDATED* |
- Special use management | Completed | Actual: 01/06/2022 | 03/2022 |
Monte Lutterman 970-404-3164 monte.lutterman@usda.gov |
Description: Braun Hut System permit renewal for a new (10) year term. No changes to the use or intensity.
Web Link: http://www.fs.usda.gov/project/?project=60979 |
|||||
Location: UNIT - West Zone/Aspen Ranger District. STATE - Colorado. COUNTY - Gunnison, Pitkin. LEGAL - Not Applicable. Within Pitkin and Gunnison Counties. | |||||
Castle Creek AML Safety Closure and Cabin Demolitions CE *UPDATED* |
- Minerals and Geology |
Developing Proposal Est. Scoping Start 01/2023 |
Expected:05/2023 | 07/2023 |
Olivia Garcia 970-945-3220 olivia.garcia@usda.gov |
Description: This proposed project is to safeguard one (1) mine feature and demolish and remove three (4) unauthorized structures and one (1) former FS Administrative site situated on National Forest System lands managed by the Aspen-Sopris Ranger District. | |||||
Location: UNIT - West Zone/Aspen Ranger District. STATE - Colorado. COUNTY - Pitkin, Summit. LEGAL - Not Applicable. Various cabins and mine features in Pitkin County. | |||||
Hunter Creek Historic Buildings CE *UPDATED* |
- Facility management | Completed | Actual: 04/13/2022 | 08/2022 |
Jennifer Schuller 970-404-3163 Jennifer.Schuller@usda.gov |
Description: The Hunter Creek Historic Foundation has engaged Historicorps to stabilize structures that are eligible for listing in the National Register of Historic Places in the Hunter Creek Valley near Aspen, CO. | |||||
Location: UNIT - West Zone/Aspen Ranger District. STATE - Colorado. COUNTY - Pitkin. LEGAL - Not Applicable. In the Hunter Creek Valley near Aspen, CO. | |||||
Back To Top | |||||
White River National Forest, West Zone/Blanco Ranger District (excluding Projects occurring in more than one District) |
R2 - Rocky Mountain Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Hill Creek C&H Livestock Facility CE *UPDATED* |
- Grazing management | Completed | Actual: 03/22/2022 | 06/2022 |
Mary Cunningham 970-878-5015 mary.cunningham@usda.gov |
Description: This project involves the construction of a corral with loading chute and a small 'beef pasture' (7 ac) for livestock ingress and egress to the Hill Creek C&H grazing allotment.
Web Link: http://www.fs.usda.gov/project/?project=59084 |
|||||
Location: UNIT - West Zone/Blanco Ranger District. STATE - Colorado. COUNTY - Rio Blanco. LEGAL - Not Applicable. Project is located T 2 S, R 90 W, Section 7 Accessible by Rio Blanco County Road 10, Peltier Trailhead Parking Lot. | |||||
Yellowjacket Project EA *UPDATED* |
- Forest products - Vegetation management (other than forest products) - Fuels management - Road management |
In Progress: Objection Period Legal Notice 08/04/2022 |
Expected:12/2022 |
06/2023 |
Christopher McDonald 970-625-6856 christopher.mcdonald@usda.gov |
Description: The Blanco Ranger District is proposing approximately 2,300 acres of vegetation management activities within the Wilson Park, Sawmill Mountain and Ellison Mountain area.
Web Link: http://www.fs.usda.gov/project/?project=57654 |
|||||
Location: UNIT - West Zone/Blanco Ranger District. STATE - Colorado. COUNTY - Rio Blanco. LEGAL - Sec. 1-3, 10-15, 22-27, 34-36, T2N, R92W; Sec. 4-9, 17-20, 26-36, T2N, R91W; Sec. 1-3 and 12, T1N, R92W; Sec. 1-17, 20-24, 26-29, 32-34, T1N, R91W; Sec. 7, 18, 19 T1N, R90W, Rio Blanco Co. Proposed management activities would occur approximately 16 miles east-northeast of Meeker, Colorado within the vicinity of Wilson Park, Sawmill Mountain and Ellison Mountain,. | |||||
Back To Top | |||||
White River National Forest, West Zone/Rifle Ranger District (excluding Projects occurring in more than one District) |
R2 - Rocky Mountain Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
Butler Creek BDA Project CE *UPDATED* |
- Wildlife, Fish, Rare plants - Watershed management |
In Progress: Scoping Start 04/04/2022 |
Expected:09/2022 |
10/2022 |
Robert Ramey 540-325-2327 robert.ramey@usda.gov |
Description: The project would utilize untreated wood posts and on-site materials to build multiple beaver dam analogs (BDAs). These temporary structures would be constructed by hand and would mimic the influence of beaver dams on the stream and riparian area.
Web Link: http://www.fs.usda.gov/project/?project=61873 |
|||||
Location: UNIT - West Zone/Rifle Ranger District. STATE - Colorado. COUNTY - Garfield. LEGAL - Not Applicable. Butler Creek, Coulter Mesa, roughly 16 miles north of Rifle, Colorado. | |||||
City of Glenwood Springs Gaging Station CE *NEW LISTING* |
- Special use management - Research and Development |
Completed | Actual: 09/15/2022 | 09/2022 |
Olivia Bruce 970-200-6195 Olivia.Bruce@usda.gov |
Description: The City of Glenwood is proposing a stream metering gage located on the Grizzly Creek watershed in the Rifle Ranger District. The proposed gaging station location is in a previously disturbed area and will require minimal ground disturbance. | |||||
Location: UNIT - West Zone/Rifle Ranger District. STATE - Colorado. COUNTY - Garfield, Gunnison. LEGAL - Not Applicable. 39?43'3.52"N, 107?19'3.74"W; 20 feet downstream of the culvert. | |||||
Back To Top | |||||
White River National Forest, West Zone/Sopris Ranger District (excluding Projects occurring in more than one District) |
R2 - Rocky Mountain Region | ||||
Project Name | Project Purpose | Planning Status | Decision | Expected Implementation | Project Contact |
El Jebel Administrative Site, Upper Parcel, Conveyance Project EA *UPDATED* |
- Land ownership management |
In Progress: Objection Period Legal Notice 09/16/2022 |
Expected:12/2022 |
12/2022 |
Jennifer Schuller 970-404-3163 Jennifer.Schuller@usda.gov |
Description: Proposal to convey (sale or lease) all or a portion of the Upper Parcel at its El Jebel Administrative Site pursuant to the Facility Realignment and Enhancement Act of 2005 P.L.109-54; 16 U.S.C. 580d note, as amended by P.L.112-74, Title IV, Sec. 421
Web Link: http://www.fs.usda.gov/project/?project=50663 |
|||||
Location: UNIT - West Zone/Sopris Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - Sixth Principal Meridian T. 8 S., R. 87 W. N1/2 of Sec. 3, NE1/4 NE1/4 of Sec. 4. The Upper Parcel is approximately 30 acres and consists of three residences, one mobile home pad, horse pastures. | |||||
Redstone to McClure Pass Trail EA *UPDATED* |
- Recreation management - Special use management |
In Progress: Comment Period Public Notice 01/21/2022 |
Expected:03/2023 |
06/2023 |
Shelly Grail 970-404-3155 shelly.grail@usda.gov |
Description: Pitkin County has proposed to construct and maintain a natural surface, non-motorized, multi-use recreation trail from Redstone south to the summit of McClure Pass. The proposed trail is about 7 miles in length, of which, 5 miles is on NFS lands.
Web Link: http://www.fs.usda.gov/project/?project=56913 |
|||||
Location: UNIT - West Zone/Sopris Ranger District. STATE - Colorado. COUNTY - Pitkin. LEGAL - Not Applicable. Along CDOT Highway 133 right of way between Redstone and McClure or along historic wagon route. | |||||
In accordance with Federal civil rights law and U.S. Department of Agriculture (USDA) civil rights regulations and policies, the USDA, its Agencies, offices, and employees, and institutions participating in or administering USDA programs are prohibited from discriminating based on race, color, national origin, religion, sex, gender identity (including gender expression), sexual orientation, disability, age, marital status, family/parental status, income derived from a public assistance program, political beliefs, or reprisal or retaliation for prior civil rights activity, in any program or activity conducted or funded by USDA (not all bases apply to all programs). Remedies and complaint filing deadlines vary by program or incident.
Persons with disabilities who require alternative means of communication for program information (e.g., Braille, large print, audiotape, American Sign Language, etc.) should contact the responsible Agency or USDA’s TARGET Center at (202) 720-2600 (voice and TTY) or contact USDA through the Federal Relay Service at (800) 877-8339. Additionally, program information may be made available in languages other than English. To file a program discrimination complaint, complete the USDA Program Discrimination Complaint Form, AD-3027, found online at http://www.ascr.usda.gov/complaint_filing_cust.html and at any USDA office or write a letter addressed to USDA and provide in the letter all of the information requested in the form. To request a copy of the complaint form, call (866) 632-9992. Submit your completed form or letter to USDA by: (1) mail: U.S. Department of Agriculture Office of the Assistant Secretary for Civil Rights 1400 Independence Avenue, SW Washington, D.C. 20250-9410; (2) fax: (202) 690-7442; or (3) email: program.intake@usda.gov. USDA is an equal opportunity provider, employer, and lender. |